Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery and Reinvestment Act of 2009 (ARRA) to the Village of Ruidoso/City of Ruidoso Downs, NM, 53738-53740 [E9-25171]

Download as PDF 53738 Federal Register / Vol. 74, No. 201 / Tuesday, October 20, 2009 / Notices Docket No. ER09–1386–001, Southwest Power Pool, Inc. Docket No. ER09–1397, Southwest Power Pool, Inc. Docket No. ER09–1665–000, Southwest Power Pool, Inc. Docket No. ER09–1714–000, Southwest Power Pool, Inc. Docket No. ER09–1716–000, Southwest Power Pool, Inc., Docket No. ER09–1732–000, Southwest Power Pool, Inc. Docket No. ER09–1733–000, Southwest Power Pool, Inc. Docket No. ER09–1736–000, Southwest Power Pool, Inc. Docket No. ER09–1740–000, Southwest Power Pool, Inc. Docket No. ER10–13–000, Southwest Power Pool, Inc. Docket No. ER10–21–000, Southwest Power Pool, Inc. Docket No. ER10–33–000, Southwest Power Pool, Inc. Docket No. ER08–1419, Southwest Power Pool, Inc. Docket No. OA08–5 and EL09–40, Southwest Power Pool, Inc. Docket No. OA08–60, Southwest Power Pool, Inc. Docket No. OA08–61, Southwest Power Pool, Inc. Docket No. OA08–104, Southwest Power Pool, Inc. These meetings are open to the public. For more information, contact Patrick Clarey, Office of Energy Market Regulation, Federal Energy Regulatory Commission at (317) 249–5937 or patrick.clarey@ferc.gov. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. E9–25176 Filed 10–19–09; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [FRL–8970–2] Request for Nominations to the Environmental Financial Advisory Board cprice-sewell on DSKGBLS3C1PROD with NOTICES AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. The U.S. Environmental Protection Agency (EPA) invites nominations of qualified candidates to be considered for appointments to fill vacancies on the Environmental Financial Advisory Board. Nominees should demonstrate experience in any of the following areas: Environmental economics, public utility finance and SUMMARY: VerDate Nov<24>2008 14:46 Oct 19, 2009 Jkt 220001 management, state revolving loan funds, environmental infrastructure financing, state/local government, Tribal representatives and non-profit environmental group, corporate finance and investment banking, public-private partnerships, bond rating and financing, commercial banking, environmental engineering, accounting and/or auditing, and financial assurance mechanisms. In addition to this notice, other sources may be utilized in the solicitation of nominees. The deadline for receiving nominations is November 10, 2009. Appointments will be made by the Deputy Administrator of the Environmental Protection Agency and will be announced during February 2010. EPA values and welcomes diversity. In an effort to obtain nominations of diverse candidates, EPA encourages nominations of women and men of all racial and ethnic groups. Nominations for membership must include a resume describing the professional and educational qualifications of the nominee as well as experience. Contact details should include full name and title, business mailing address, telephone, fax, and email address. A supporting letter of endorsement is encouraged but not required. ADDRESS/FURTHER INFORMATION CONTACT: Submit nomination materials by postal mail, electronic mail or fax to: Pamela Scott, Membership Coordinator, Environmental Financial Advisory Board, EPA, Office of the Chief Financial Officer, 1200 Pennsylvania Avenue, NW., (2731R), Washington, DC 20460; or e-mail scott.pamela@epa.gov; phone 202–564–6368; or fax 202–565– 2587. SUPPLEMENTARY INFORMATION: The Environmental Financial Advisory Board was chartered in 1989 under the Federal Advisory Committee Act to provide advice and recommendations to EPA on the following issues: • Reducing the cost of financing environmental facilities and discouraging polluting behavior; • Creating incentives to increase private investment in the provision of environmental services and removing or reducing constraints on private involvement imposed by current regulations; • Developing new and innovative environmental financing approaches and supporting and encouraging the use of cost-effective existing approaches; • Identifying approaches specifically targeted to small community financing; and • Increasing the capacity issue of state and local governments to carry out PO 00000 Frm 00042 Fmt 4703 Sfmt 4703 their respective Environmental programs under current Federal tax laws. • Increasing the capacity of state and local governments to carry out their respective environmental programs under current Federal tax laws; • Increasing the total investment in environmental protection of public and private environmental resources to help ease the environmental financing challenge facing our nations. The Board meets two times each calendar year (two days per meeting) at different locations within the continental United States. Board members typically contribute approximately 1–3 hours per month to the Board’s work. The Board membership services are voluntary as we are unable to provide honoraria or compensation. However, you may receive Travel and per diem allowances where appropriate and in accordance with Federal Travel Regulations for invitational travelers. The following criteria will be used to evaluate nominees: • Residence in the continental United States; • Representing the points of view of a group, and has professional knowledge of and experience with, environmental financing activities; • Senior level-experience that fills a gap in Board representation, or brings a new and relevant dimension to its deliberations; • Demonstrated ability to work in a consensus-building process with a wide range of representatives from diverse constituencies; and • Willingness to serve a two-year term as an active-contributing member, with possible re-appointment to a second term. Dated: October 14, 2009. Joshua Baylson, Associate Chief Financial Officer, Office of the Chief Financial Officer. [FR Doc. E9–25168 Filed 10–19–09; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [FRL–8970–5] Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery and Reinvestment Act of 2009 (ARRA) to the Village of Ruidoso/City of Ruidoso Downs, NM AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. E:\FR\FM\20OCN1.SGM 20OCN1 cprice-sewell on DSKGBLS3C1PROD with NOTICES Federal Register / Vol. 74, No. 201 / Tuesday, October 20, 2009 / Notices SUMMARY: The Acting Regional Administrator of EPA Region 6 is hereby granting a project waiver of the Buy American requirements of ARRA Section 1605 under the authority of Section 1605(b)(2) (manufactured goods are not produced in the United States in sufficient and reasonably available quantities and of a satisfactory quality) to the Village of Ruidoso/City of Ruidoso Downs—Joint Use Board (‘‘Ruidoso’’) for the purchase of a membrane bioreactor system (MBR), supplied by Enviroquip, Inc., that contains two primary components not manufactured in America, at the proposed Wastewater Treatment Plant (WWTP). Ruidoso indicates that the MBR system is necessary to achieve the wastewater treatment levels required by the National Pollutant Discharge Elimination System (NPDES) permit issued for this WWTP. This is a project specific waiver and only applies to the use of the specified product for the ARRA funded project being proposed. Any other ARRA project that opts to use the same product must apply for a separate waiver based on the specific project circumstances. The Acting Regional Administrator is making this determination based on the review and recommendations of the EPA Region 6 Water Quality Protection Division. Ruidoso has provided sufficient documentation to support its request. The Assistant Administrator of the EPA’s Office of Administration and Resources Management has concurred on this decision to make an exception to Section 1605 of ARRA. This action permits the purchase of the MBR containing goods not manufactured in American from Enviroquip, Inc., for the proposed project being implemented by Ruidoso. It should be noted that for purposes of this action, the MBR, while treated as a single system, is not itself a manufactured good, but is an assembly of manufactured goods. DATES: Effective Date: August 24, 2009. FOR FURTHER INFORMATION CONTACT: Rajen Patel, Buy American Coordinator, (214) 665–2788, SRF & Projects Section, Water Quality Protection Division, U.S. EPA Region 6, 1445 Ross Avenue, Dallas, Texas 75202–2733. SUPPLEMENTARY INFORMATION: In accordance with ARRA Section 1605(c), EPA hereby provides notice that it is granting a project waiver of the requirements of Section 1605(b)(2) of Public Law 111–5, Buy American requirements to the Village of Ruidoso/ City of Ruidoso Down—Joint Use Board, New Mexico, for the acquisition of an ‘‘Enviroquip MBR system.’’ Ruidoso has been unable to find an MBR system that VerDate Nov<24>2008 14:46 Oct 19, 2009 Jkt 220001 contains American-made MBR cassettes and aeration blowers (as specified in Ruidoso’s specifications for Enviroquip MBR system) to meet its specific wastewater requirements. Section 1605 of the ARRA requires that none of the appropriated funds may be used for the construction, alteration, maintenance, or repair of a public building or public work unless all of the iron, steel, and manufactured goods used in the project are produced in the United States unless a waiver is provided to the recipient by EPA. A waiver may be granted if EPA determines that (1) Applying these requirements would be inconsistent with public interest; (2) iron, steel, and the relevant manufactured goods are not produced in the United States in sufficient and reasonably available quantities and of a satisfactory quality; or (3) inclusion of iron, steel, and the relevant manufactured goods produced in the United States will increase the cost of the overall project by more than 25 percent. The Enviroquip MBR system is comprised of MBR filtration cassettes, aeration blowers, and several other auxiliary components integral to the efficient operation of the system. The MBR system is a packaged product that has undergone complex biological design, hydraulic modeling, control automation, fabrication and integration of specialized product components. The Enviroquip MBR system—as a whole, is designed to remove nutrients (Phosphorus and Nitrogen) to a level specified in Ruidoso’s NPDES permit. The purpose of Ruidoso’s waiver request is to allow the purchase of the Enviroquip MBR system with forty-eight MBR cassettes, manufactured by Kubota Inc., of Japan, and eight Aerzen Generation 5 aeration blowers, manufactured by Aerzen, Germany. The new WWTP would incorporate the entire MBR system to meet the effluent requirements of the National Pollutant Discharge Elimination System (NPDES) permit. The MBR cassettes are designed to provide increased nutrient removal capabilities, which will allow the City to meet their nutrient wasteload allocation for the Rio Ruidoso. Aerzen Generation 5 blowers are integral components of the MBR system because they maintain the critically important oxygen levels and membrane scouring capabilities through out the MBR system. Ruidoso chose the MBR treatment process after an engineering analysis of various treatment alternatives. Ruidoso determined this to be the most environmentally sound and cost effective solution because it meets the PO 00000 Frm 00043 Fmt 4703 Sfmt 4703 53739 high quality effluent required by its waste load allocation under its Total Maximum Daily Limit, when compared to other considered solutions. In addition, in anticipation of procuring the MBR system, Ruidoso has already incorporated specific technical design requirements for installation of MBR system at their proposed WWTP, including specifics on MBR system footprint and configuration. Ruidoso has provided information to the EPA demonstrating that there are no MBR cassettes manufactured in the United States in sufficient and reasonable quantity and of a satisfactory quality to meet the required technical specification. Two companies were considered for the purchase of filtration cassettes, none based in the United States. Ruidoso has performed rigorous market research, but was unsuccessful in its effort to locate any domestic manufacturers of MBR cassettes for the MBR system. Based on additional research conducted by EPA Region 6, there does not appear to be any domestic MBR cassette manufacturers that would meet Ruidoso’s technical specifications. EPA’s national contractor prepared a technical assessment report dated August 3, 2009 based on the waiver request submittal. The report determined that the waiver request submittal was complete, that adequate technical information was provided, and that there were no significant weaknesses in the justification provided. The report confirmed the waiver applicant’s claim that there are no American-made MBR cassettes available for use in the proposed MBR system. Ruidoso could only identify three aeration blowers (Aerzen Generation 5, Aerzen Delta IV, and Dresser Roots) that could provide the oxygen levels and membrane scouring capabilities required by Enviroquip’s process guarantee. Ruidoso disqualifies the use of Aerzen Delta IV blower on the grounds that its noise level, at 81 dB, is substantially higher than that of Aerzen Generation 5 models (72 dB for pre-air supply and 76 dB for MBR air supply) and that such a noise level would interfere with the system operators and with occupants of nearby offices. Noise levels of 72 dB and 76dB are included in the original specifications for the respective air supplies. Ruidoso disqualifies the Dresser Roots blowers on the grounds that they run at substantially higher revolutions per minute (RPM) rates (4,000 RPM for preair and 3,300 for MBR air) than called for in the specifications (3,244 RPM for pre-air and 2,740 RPM for MBR air). E:\FR\FM\20OCN1.SGM 20OCN1 cprice-sewell on DSKGBLS3C1PROD with NOTICES 53740 Federal Register / Vol. 74, No. 201 / Tuesday, October 20, 2009 / Notices Ruidoso included a performance guarantee in the request for proposal (RFP) as well as the original specification. Enviroquip’s performance guarantee applies to the entire MBR system, including all components supplied by Enviroquip, which would be voided by substitution of other components. The potential voiding of the performance raises a valid issue regarding availability of alternative aeration blowers. The existence of such a performance guarantee supports treating the entire MBR system as a unitary whole, rather than a collection of individual components. Therefore, EPA Region 6 concludes that only the ‘‘Enviroquip MBR System—as a whole’’ meets the ‘‘specifications in project plans and design.’’ The April 28, 2009 EPA HQ Memorandum, Implementation of Buy American provisions of Public Law 111–5, the ‘‘American Recovery and Reinvestment Act of 2009’’, defines reasonably available quantity as ‘‘the quantity of iron, steel, or relevant manufactured good is available or will be available at the time needed and place needed, and in the proper form or specification as specified in the project plans and design.’’ Ruidoso has incorporated specific technical design requirements for the installation of the MBR system at its WWTP. The purpose of the ARRA is to stimulate economic recovery, in part, by funding current infrastructure construction, not to delay projects that are ‘‘shovel ready’’ by requiring utilities, such as Ruidoso, to revise their standards and specifications, institute a new bidding process, and potentially choose a more costly, less efficient project. The imposition of ARRA Buy American requirements on such projects otherwise eligible for State Revolving Fund assistance would result in unreasonable delay and thus displace the ‘‘shovel ready’’ status for this project. To further delay construction is in direct conflict with the fundamental economic purpose of the ARRA, which is to create or retain jobs. The Region 6 Water Quality Protection Division has reviewed this waiver request, and to the best of my knowledge at the time of review, has determined that the supporting documentation provided by Ruidoso is sufficient to meet the criteria listed under ARRA, Section 1605(b), Office of Management and Budget (OMB) regulations at 2 CFR 176.60–176.170., and in the April 28, 2009, ‘‘Implementation of Buy American provisions of Public Law 111–5, the ‘‘American Recovery and Reinvestment Act of 2009’’ Memorandum: Iron, steel, VerDate Nov<24>2008 14:46 Oct 19, 2009 Jkt 220001 and the manufactured goods are not produced in the United States in sufficient and reasonably available quantities and of a satisfactory quality. The basis for this project waiver is the authorization provided in ARRA, Section 1605(b)(2). Due to the lack of production of this product in the United States in sufficient and reasonably available quantities and of a satisfactory quality in order to meet Ruidoso’s technical specifications, a waiver from the Buy American requirement is justified. EPA headquarters’ March 31, 2009 Delegation of Authority Memorandum provided Regional Administrators with the authority to issue exceptions to Section 1605 of ARRA within the geographic boundaries of their respective regions and with respect to requests by individual grant recipients. Having established both a proper basis to specify the particular good required for this project, and that this manufactured good was not available from a producer in the United States, Ruidoso is hereby granted a waiver from the Buy American requirements of ARRA, Section 1605(a) of Public Law 111–5 for the purchase of ‘‘Enviroquip MBR system’’ using ARRA funds, as specified in Ruidoso’s request of July 6, 2009. This supplementary information constitutes the detailed written justification required by ARRA, Section 1605(c), for waivers ‘‘based on a finding under subsection (b).’’ Authority: Public Law 111–5, section 1605. Dated: August 24, 2009. Lawrence E. Starfield, Acting Regional Administrator, Region 6. [FR Doc. E9–25171 Filed 10–19–09; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [FRL–8970–3] EPA Science Advisory Board Staff Office; Request for Nominations of Experts for the SAB Methanol Review Panel AGENCY: Environmental Protection Agency (EPA). ACTION: Notice request for nominations. SUMMARY: The Science Advisory Board (SAB) Staff Office is requesting public nominations of experts to form an SAB Ad Hoc Panel to review EPA’s health effects assessment for Methanol. DATES: Nominations should be submitted by November 10, 2009 per instructions below. PO 00000 Frm 00044 Fmt 4703 Sfmt 4703 FOR FURTHER INFORMATION CONTACT: Any member of the public wishing further information regarding this Request for Nominations may contact Mr. Edward Hanlon, Designated Federal Officer (DFO), SAB Staff Office, by telephone/ voice mail at (202) 343–9946; by fax at (202) 233–0643; or via e-mail at hanlon.edward@epa.gov. General information concerning the EPA Science Advisory Board can be found on the EPA SAB Web site at https:// www.epa.gov/sab. SUPPLEMENTARY INFORMATION: Background: EPA’s Integrated Risk Information System (IRIS) is an electronic database containing descriptive and quantitative toxicological information on human health effects that may result from chronic exposure to various substances in the environment. This information supports human health risk assessments, and includes hazard identification and dose-response data and derivations of oral reference doses (RfDs) and inhalation reference concentrations (RfCs) for noncancer effects and oral slope factors and oral and inhalation unit risks for cancer effects. IRIS is prepared and maintained by EPA’s National Center for Environmental Assessment (NCEA) within the Office of Research and Development (ORD). NCEA is updating the health effects information that supported the1988 IRIS Toxicological Assessment for Methanol, and has requested that SAB conduct a review of its updated Assessment. The SAB was established by 42 U.S.C. 4365 to provide independent scientific and technical advice, consultation and recommendations to the EPA Administrator on the technical basis for Agency positions and regulations. The SAB Staff Office will form an expert Panel to review ORD’s draft IRIS Toxicological Assessment for Methanol. The SAB Panel will comply with the provisions of the Federal Advisory Committee Act (FACA) and all appropriate SAB procedural policies. Upon completion, the Panel’s report will be submitted to the chartered SAB for final approval for transmittal to the EPA Administrator. The Methanol Review Panel is being asked to comment on the scientific soundness of the Agency’s draft IRIS review. Availability of the Review Materials: The EPA draft IRIS Toxicological Review document to be reviewed by the Methanol Review Panel will be made available by ORD at the following URL: https://epa.gov/ncea (under ‘‘Recent Additions’’). For questions concerning the review materials, please contact Dr. E:\FR\FM\20OCN1.SGM 20OCN1

Agencies

[Federal Register Volume 74, Number 201 (Tuesday, October 20, 2009)]
[Notices]
[Pages 53738-53740]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-25171]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[FRL-8970-5]


Notice of a Project Waiver of Section 1605 (Buy American 
Requirement) of the American Recovery and Reinvestment Act of 2009 
(ARRA) to the Village of Ruidoso/City of Ruidoso Downs, NM

AGENCY: Environmental Protection Agency (EPA).

ACTION: Notice.

-----------------------------------------------------------------------

[[Page 53739]]

SUMMARY: The Acting Regional Administrator of EPA Region 6 is hereby 
granting a project waiver of the Buy American requirements of ARRA 
Section 1605 under the authority of Section 1605(b)(2) (manufactured 
goods are not produced in the United States in sufficient and 
reasonably available quantities and of a satisfactory quality) to the 
Village of Ruidoso/City of Ruidoso Downs--Joint Use Board (``Ruidoso'') 
for the purchase of a membrane bioreactor system (MBR), supplied by 
Enviroquip, Inc., that contains two primary components not manufactured 
in America, at the proposed Wastewater Treatment Plant (WWTP). Ruidoso 
indicates that the MBR system is necessary to achieve the wastewater 
treatment levels required by the National Pollutant Discharge 
Elimination System (NPDES) permit issued for this WWTP. This is a 
project specific waiver and only applies to the use of the specified 
product for the ARRA funded project being proposed. Any other ARRA 
project that opts to use the same product must apply for a separate 
waiver based on the specific project circumstances. The Acting Regional 
Administrator is making this determination based on the review and 
recommendations of the EPA Region 6 Water Quality Protection Division. 
Ruidoso has provided sufficient documentation to support its request. 
The Assistant Administrator of the EPA's Office of Administration and 
Resources Management has concurred on this decision to make an 
exception to Section 1605 of ARRA. This action permits the purchase of 
the MBR containing goods not manufactured in American from Enviroquip, 
Inc., for the proposed project being implemented by Ruidoso. It should 
be noted that for purposes of this action, the MBR, while treated as a 
single system, is not itself a manufactured good, but is an assembly of 
manufactured goods.

DATES: Effective Date: August 24, 2009.

FOR FURTHER INFORMATION CONTACT: Rajen Patel, Buy American Coordinator, 
(214) 665-2788, SRF & Projects Section, Water Quality Protection 
Division, U.S. EPA Region 6, 1445 Ross Avenue, Dallas, Texas 75202-
2733.

SUPPLEMENTARY INFORMATION: In accordance with ARRA Section 1605(c), EPA 
hereby provides notice that it is granting a project waiver of the 
requirements of Section 1605(b)(2) of Public Law 111-5, Buy American 
requirements to the Village of Ruidoso/City of Ruidoso Down--Joint Use 
Board, New Mexico, for the acquisition of an ``Enviroquip MBR system.'' 
Ruidoso has been unable to find an MBR system that contains American-
made MBR cassettes and aeration blowers (as specified in Ruidoso's 
specifications for Enviroquip MBR system) to meet its specific 
wastewater requirements.
    Section 1605 of the ARRA requires that none of the appropriated 
funds may be used for the construction, alteration, maintenance, or 
repair of a public building or public work unless all of the iron, 
steel, and manufactured goods used in the project are produced in the 
United States unless a waiver is provided to the recipient by EPA. A 
waiver may be granted if EPA determines that (1) Applying these 
requirements would be inconsistent with public interest; (2) iron, 
steel, and the relevant manufactured goods are not produced in the 
United States in sufficient and reasonably available quantities and of 
a satisfactory quality; or (3) inclusion of iron, steel, and the 
relevant manufactured goods produced in the United States will increase 
the cost of the overall project by more than 25 percent.
    The Enviroquip MBR system is comprised of MBR filtration cassettes, 
aeration blowers, and several other auxiliary components integral to 
the efficient operation of the system. The MBR system is a packaged 
product that has undergone complex biological design, hydraulic 
modeling, control automation, fabrication and integration of 
specialized product components. The Enviroquip MBR system--as a whole, 
is designed to remove nutrients (Phosphorus and Nitrogen) to a level 
specified in Ruidoso's NPDES permit.
    The purpose of Ruidoso's waiver request is to allow the purchase of 
the Enviroquip MBR system with forty-eight MBR cassettes, manufactured 
by Kubota Inc., of Japan, and eight Aerzen Generation 5 aeration 
blowers, manufactured by Aerzen, Germany.
    The new WWTP would incorporate the entire MBR system to meet the 
effluent requirements of the National Pollutant Discharge Elimination 
System (NPDES) permit. The MBR cassettes are designed to provide 
increased nutrient removal capabilities, which will allow the City to 
meet their nutrient waste-load allocation for the Rio Ruidoso. Aerzen 
Generation 5 blowers are integral components of the MBR system because 
they maintain the critically important oxygen levels and membrane 
scouring capabilities through out the MBR system.
    Ruidoso chose the MBR treatment process after an engineering 
analysis of various treatment alternatives. Ruidoso determined this to 
be the most environmentally sound and cost effective solution because 
it meets the high quality effluent required by its waste load 
allocation under its Total Maximum Daily Limit, when compared to other 
considered solutions. In addition, in anticipation of procuring the MBR 
system, Ruidoso has already incorporated specific technical design 
requirements for installation of MBR system at their proposed WWTP, 
including specifics on MBR system footprint and configuration.
    Ruidoso has provided information to the EPA demonstrating that 
there are no MBR cassettes manufactured in the United States in 
sufficient and reasonable quantity and of a satisfactory quality to 
meet the required technical specification. Two companies were 
considered for the purchase of filtration cassettes, none based in the 
United States. Ruidoso has performed rigorous market research, but was 
unsuccessful in its effort to locate any domestic manufacturers of MBR 
cassettes for the MBR system.
    Based on additional research conducted by EPA Region 6, there does 
not appear to be any domestic MBR cassette manufacturers that would 
meet Ruidoso's technical specifications. EPA's national contractor 
prepared a technical assessment report dated August 3, 2009 based on 
the waiver request submittal. The report determined that the waiver 
request submittal was complete, that adequate technical information was 
provided, and that there were no significant weaknesses in the 
justification provided. The report confirmed the waiver applicant's 
claim that there are no American-made MBR cassettes available for use 
in the proposed MBR system.
    Ruidoso could only identify three aeration blowers (Aerzen 
Generation 5, Aerzen Delta IV, and Dresser Roots) that could provide 
the oxygen levels and membrane scouring capabilities required by 
Enviroquip's process guarantee. Ruidoso disqualifies the use of Aerzen 
Delta IV blower on the grounds that its noise level, at 81 dB, is 
substantially higher than that of Aerzen Generation 5 models (72 dB for 
pre-air supply and 76 dB for MBR air supply) and that such a noise 
level would interfere with the system operators and with occupants of 
nearby offices. Noise levels of 72 dB and 76dB are included in the 
original specifications for the respective air supplies. Ruidoso 
disqualifies the Dresser Roots blowers on the grounds that they run at 
substantially higher revolutions per minute (RPM) rates (4,000 RPM for 
pre-air and 3,300 for MBR air) than called for in the specifications 
(3,244 RPM for pre-air and 2,740 RPM for MBR air).

[[Page 53740]]

    Ruidoso included a performance guarantee in the request for 
proposal (RFP) as well as the original specification. Enviroquip's 
performance guarantee applies to the entire MBR system, including all 
components supplied by Enviroquip, which would be voided by 
substitution of other components. The potential voiding of the 
performance raises a valid issue regarding availability of alternative 
aeration blowers. The existence of such a performance guarantee 
supports treating the entire MBR system as a unitary whole, rather than 
a collection of individual components. Therefore, EPA Region 6 
concludes that only the ``Enviroquip MBR System--as a whole'' meets the 
``specifications in project plans and design.''
    The April 28, 2009 EPA HQ Memorandum, Implementation of Buy 
American provisions of Public Law 111-5, the ``American Recovery and 
Reinvestment Act of 2009'', defines reasonably available quantity as 
``the quantity of iron, steel, or relevant manufactured good is 
available or will be available at the time needed and place needed, and 
in the proper form or specification as specified in the project plans 
and design.'' Ruidoso has incorporated specific technical design 
requirements for the installation of the MBR system at its WWTP.
    The purpose of the ARRA is to stimulate economic recovery, in part, 
by funding current infrastructure construction, not to delay projects 
that are ``shovel ready'' by requiring utilities, such as Ruidoso, to 
revise their standards and specifications, institute a new bidding 
process, and potentially choose a more costly, less efficient project. 
The imposition of ARRA Buy American requirements on such projects 
otherwise eligible for State Revolving Fund assistance would result in 
unreasonable delay and thus displace the ``shovel ready'' status for 
this project. To further delay construction is in direct conflict with 
the fundamental economic purpose of the ARRA, which is to create or 
retain jobs.
    The Region 6 Water Quality Protection Division has reviewed this 
waiver request, and to the best of my knowledge at the time of review, 
has determined that the supporting documentation provided by Ruidoso is 
sufficient to meet the criteria listed under ARRA, Section 1605(b), 
Office of Management and Budget (OMB) regulations at 2 CFR 176.60-
176.170., and in the April 28, 2009, ``Implementation of Buy American 
provisions of Public Law 111-5, the ``American Recovery and 
Reinvestment Act of 2009'' Memorandum: Iron, steel, and the 
manufactured goods are not produced in the United States in sufficient 
and reasonably available quantities and of a satisfactory quality. The 
basis for this project waiver is the authorization provided in ARRA, 
Section 1605(b)(2). Due to the lack of production of this product in 
the United States in sufficient and reasonably available quantities and 
of a satisfactory quality in order to meet Ruidoso's technical 
specifications, a waiver from the Buy American requirement is 
justified.
    EPA headquarters' March 31, 2009 Delegation of Authority Memorandum 
provided Regional Administrators with the authority to issue exceptions 
to Section 1605 of ARRA within the geographic boundaries of their 
respective regions and with respect to requests by individual grant 
recipients. Having established both a proper basis to specify the 
particular good required for this project, and that this manufactured 
good was not available from a producer in the United States, Ruidoso is 
hereby granted a waiver from the Buy American requirements of ARRA, 
Section 1605(a) of Public Law 111-5 for the purchase of ``Enviroquip 
MBR system'' using ARRA funds, as specified in Ruidoso's request of 
July 6, 2009. This supplementary information constitutes the detailed 
written justification required by ARRA, Section 1605(c), for waivers 
``based on a finding under subsection (b).''

    Authority:  Public Law 111-5, section 1605.

    Dated: August 24, 2009.
Lawrence E. Starfield,
Acting Regional Administrator, Region 6.
[FR Doc. E9-25171 Filed 10-19-09; 8:45 am]