Notice of Proposed Administrative Settlement Pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act, 52232 [E9-24465]
Download as PDF
mstockstill on DSKH9S0YB1PROD with NOTICES
52232
Federal Register / Vol. 74, No. 195 / Friday, October 9, 2009 / Notices
Agreement, San Joaquin River, CA,
Wait Period Ends: 11/09/2009,
Contact: Shauna McDonald 559–487–
5202.
EIS No. 20090342, Final EIS, AFS, CA,
Sequoia National Forest Motorized
Travel Management Project, Prohibit
Cross-Country Travel for Managing
Motorized Travel, Kern River,
Western Divide Ranger Districts,
Sequoia National Forest, Tulare
County, CA, Wait Period Ends: 11/09/
2009, Contact: Barbara Johnston 559–
784–1500 Ext. 1220.
EIS No. 20090343, Draft EIS, AFS, OR,
Deschutes and Ochoco National
Forest and the Crooked River National
Grassland Travel Management Project,
Implementation, Deschutes, Jefferson,
Crook, Klamath, Lake, Grant and
Wheeler County, OR, Comment
Period Ends: 11/23/2009, Contact:
Mollie Chaudet 541–383–5517.
EIS No. 20090344, Draft EIS, AFS, WY,
Rattlesnake Forest Management
Project, Proposes to Implement
Multiple Resource Management
Action, Bearlodge Ranger District,
Black Hills National Forest, Crook
County, WY, Comment Period Ends:
11/23/2009, Contact: Elizabeth
Krueger 307–283–1361.
EIS No. 20090345, Draft EIS, AFS, WI,
Honey Creek-Padus Project, Proposes
to Harvest Timber, Regenerate Stands,
Plant and Protect Tree Seedlings and
Manage Access on Approximately
6,702 Acres, Lakewood-Laona Ranger
District, Chequamegon-National
Forest, Forest County, WI, Comment
Period Ends: 11/23/2009, Contact:
Marilee Houlter 715–276–6333.
EIS No. 20090346, Draft EIS, TVA, 00,
Northeastern Tributary Reservoirs
Land Management Plan,
Implementation, Beaver Creek, Clear
Creek, Boone, Fort Patrick Henry,
South Holston, Watauga, and Wilbur
Reservoirs, Carter, Johnson, Sullivan,
and Washington Counties, TN and
Washington County, VA, Comment
Period Ends: 11/23/2009, Contact:
Amy Henry 856–632–4045.
EIS No. 20090347, Final EIS, AFS, MT,
Butte Lookout Project, Proposed
Timber Harvest, Prescribed Burning,
Road Work and Management
Activities, Missoula Ranger District,
Lola National Forest, Missoula
County, MT, Wait Period Ends: 11/09/
2009, Contact: Tami Paulson 406–
329–3731.
EIS No. 20090348, Final EIS, EPA, AK,
Red Dog Mine Extension—Aqqaluk
Project, Reissuance Permit
Applications for National Pollutant
Discharge Elimination System
(NPDES) Permit and New
Information, Chukchi Sea, AK, Wait
VerDate Nov<24>2008
16:05 Oct 08, 2009
Jkt 220001
Period Ends: 11/09/2009, Contact:
Patricia McGrath 206–553–0979.
Amended Notices
EIS No. 20090231, Draft EIS, BIA, CA,
Point Molate Mixed-Use Tribal
Destination Resort and Casino,
Proposed Project is to Strengthen the
Tribal Government and
Improve the Social economic Status,
Guidiville Band of Pomo
Indian of the Guidiville Rancheria
(Tribe), City of Richmond,
Contra Costa County, CA, Comment
Period Ends: 10/23/2009,
Contact: Larry Blevin 916–978–6037.
EIS No. 20090244, Draft EIS, BLM, CA,
Santa Ana River Wash Land Use Plan
Amendment and Land Exchange
Project, Proposes to Exchange Land
Located within Upper Santa
Ana River Wash, for District-Owned
Lands in San Bernardino
County, CA, Comment Period Ends:
10/21/2009, Contact: Michael
Bennett 760–833–7139.
Revision to FR Notice Published 07/24/
2009: Extending Comment Period from
09/8/2009 to 10/21/2009
EIS No. 20090252, Draft EIS, NPS, DC,
White-Tailed Deer Management Plan,
To Develop a White-Tailed
Deer Management that Supports LongTerm Protection, Preservation
and Restoration of Native Vegetation
and other Natural and
Cultural Resource in Rock Creek Park,
Washington, DC, Comment
Period Ends: 11/02/2009, Contact:
Ken Ferebee 202–895–6221
Revision to FR Notice Published 07/
31/2009: Extending Comment
Period from 09/14/2009 to 11/02/
2009.
Dated: October 6, 2009.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E9–24467 Filed 10–8–09; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
Environmental Response,
Compensation, and Liability Act, as
amended (‘‘CERCLA’’), 42 U.S.C.
9622(h)(1), notice is hereby given of a
proposed administrative settlement
concerning Doughty’s Treating Plant
Site, LaSalle Parish, Louisiana.
The settlement requires the Town of
Jena, settling party to pay a total of
$18,500, plus interest as payment of
response costs to the Hazardous
Substances Superfund.
For thirty (30) days following the date
of publication of this notice, the Agency
will receive written comments relating
to this notice and will receive written
comments relating to the settlement.
The Agency will consider all comments
received and may modify or withdraw
its consent to the settlement if
comments received disclose facts or
considerations which indicate that the
settlement is inappropriate, improper,
or inadequate. The Agency’s response to
any comments received will be available
for public inspection at 1445 Ross
Avenue, Dallas, Texas 75202–2733.
DATES: Comments must be submitted on
or before November 9, 2009.
ADDRESSES: The proposed settlement
and additional background information
relating to the settlement are available
for public inspection at 1445 Ross
Avenue, Dallas, Texas 75202–2733. A
copy of the proposed settlement may be
obtained from Kenneth Talton, 1445
Ross Avenue, Dallas, Texas 75202–2733
or by calling (214) 665–7475. Comments
should reference the Doughty’s Treating
Plant Site, Jena, LaSalle Parish,
Louisiana, and EPA Docket Number 06–
03–09, and should be addressed to
Kenneth Talton at the address listed
above.
FOR FURTHER INFORMATION CONTACT:
Amy Salinas, 1445 Ross Avenue, Dallas,
Texas 75202–2733 or call (214) 665–
8063.
Dated: September 29, 2009.
Lawrence E. Starfield,
Acting Regional Administrator, Region 6.
[FR Doc. E9–24465 Filed 10–8–09; 8:45 am]
BILLING CODE 6560–50–P
[FRL–8967–6]
Notice of Proposed Administrative
Settlement Pursuant to the
Comprehensive Environmental
Response, Compensation, and Liability
Act
AGENCY: Environmental Protection
Agency (EPA).
ACTION: Notice; request for public
comment.
SUMMARY: In accordance with Section
122(h)(1) of the Comprehensive
PO 00000
Frm 00059
Fmt 4703
Sfmt 4703
FEDERAL MARITIME COMMISSION
Notice of Agreements Filed
The Commission hereby gives notice
of the filing of the following agreements
under the Shipping Act of 1984.
Interested parties may submit comments
on the agreements to the Secretary,
Federal Maritime Commission,
Washington, DC 20573, within ten days
of the date this notice appears in the
Federal Register. Copies of the
E:\FR\FM\09OCN1.SGM
09OCN1
Agencies
[Federal Register Volume 74, Number 195 (Friday, October 9, 2009)]
[Notices]
[Page 52232]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-24465]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[FRL-8967-6]
Notice of Proposed Administrative Settlement Pursuant to the
Comprehensive Environmental Response, Compensation, and Liability Act
AGENCY: Environmental Protection Agency (EPA).
ACTION: Notice; request for public comment.
-----------------------------------------------------------------------
SUMMARY: In accordance with Section 122(h)(1) of the Comprehensive
Environmental Response, Compensation, and Liability Act, as amended
(``CERCLA''), 42 U.S.C. 9622(h)(1), notice is hereby given of a
proposed administrative settlement concerning Doughty's Treating Plant
Site, LaSalle Parish, Louisiana.
The settlement requires the Town of Jena, settling party to pay a
total of $18,500, plus interest as payment of response costs to the
Hazardous Substances Superfund.
For thirty (30) days following the date of publication of this
notice, the Agency will receive written comments relating to this
notice and will receive written comments relating to the settlement.
The Agency will consider all comments received and may modify or
withdraw its consent to the settlement if comments received disclose
facts or considerations which indicate that the settlement is
inappropriate, improper, or inadequate. The Agency's response to any
comments received will be available for public inspection at 1445 Ross
Avenue, Dallas, Texas 75202-2733.
DATES: Comments must be submitted on or before November 9, 2009.
ADDRESSES: The proposed settlement and additional background
information relating to the settlement are available for public
inspection at 1445 Ross Avenue, Dallas, Texas 75202-2733. A copy of the
proposed settlement may be obtained from Kenneth Talton, 1445 Ross
Avenue, Dallas, Texas 75202-2733 or by calling (214) 665-7475. Comments
should reference the Doughty's Treating Plant Site, Jena, LaSalle
Parish, Louisiana, and EPA Docket Number 06-03-09, and should be
addressed to Kenneth Talton at the address listed above.
FOR FURTHER INFORMATION CONTACT: Amy Salinas, 1445 Ross Avenue, Dallas,
Texas 75202-2733 or call (214) 665-8063.
Dated: September 29, 2009.
Lawrence E. Starfield,
Acting Regional Administrator, Region 6.
[FR Doc. E9-24465 Filed 10-8-09; 8:45 am]
BILLING CODE 6560-50-P