In the Matter of Earth Exploration, Inc.: Indianapolis, IN; Confirmatory Order (Effective Immediately), 52265-52267 [E9-24423]
Download as PDF
Federal Register / Vol. 74, No. 195 / Friday, October 9, 2009 / Notices
works, except for limited excerpts that
serve the purpose of the adjudicatory
filings and would constitute a Fair Use
application, participants are requested
not to include copyrighted materials in
their works.
If a person other than Mr. Christopher
Loyd requests a hearing, that person
shall set forth with particularity the
manner in which his interest is
adversely affected by this Order and
shall address the criteria set forth in 10
CFR 2.309(d) and (f).
If the hearing is requested by a person
whose interest is adversely affected, the
Commission will issue an Order
designating the time and place of any
hearing. If a hearing is held, the issue to
be considered at such hearing shall be
whether this Confirmatory Order should
be sustained. In the absence of any
request for hearing, or written approval
of an extension of time in which to
request a hearing, the provisions
specified in Section V above shall be
final 20 days from the date this Order
is published in the Federal Register
without further order or proceedings. If
an extension of time for requesting a
hearing has been approved, the
provisions specified in Section V shall
be final when the extension expires, if
a hearing request has not been received.
A request for hearing shall not stay the
immediate effectiveness of this order.
For the U.S. Nuclear Regulatory
Commission.
Dated this 1st day of October 2009.
Cynthia D. Pederson,
Deputy Regional Administrator, Region III.
[FR Doc. E9–24421 Filed 10–8–09; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2009–0445, Docket Number 030–
32764, License Number 13–26408–01, EA–
09–114]
In the Matter of Earth Exploration, Inc.:
Indianapolis, IN; Confirmatory Order
(Effective Immediately)
mstockstill on DSKH9S0YB1PROD with NOTICES
I
Earth Exploration, Inc., (Earth
Exploration or licensee) is the holder of
Materials License No. 13–26408–01
issued by the U.S. Nuclear Regulatory
Commission (NRC or Commission)
pursuant to 10 CFR Part 30 on June 3,
1992. The license authorizes Earth
Exploration to store portable gauges at
its permanent facilities in Indianapolis
and South Bend, Indiana, and to use
those portable gauges at temporary job
sites.
VerDate Nov<24>2008
16:05 Oct 08, 2009
Jkt 220001
This Confirmatory Order is the result
of an agreement reached during an
Alternative Dispute Resolution (ADR)
mediation session conducted on August
25, 2009.
II
On July 21, 2008, the NRC conducted
an onsite inspection at the Earth
Exploration main office in Indianapolis,
Indiana, and at two temporary job sites
in Indianapolis. Additional onsite
inspections were held on August 14 and
15, 2008, at the South Bend field office
and a temporary job site in South Bend,
Indiana. The purpose of the inspections
was to review licensee activities related
to radiation safety and to assess licensee
compliance with the Commission’s
rules and regulations and with the
conditions of the Earth Exploration
license. As a result of the inspection
observations, the NRC Office of
Investigations (OI) initiated an
investigation (OI Case No. 3–2008–026)
and on April 27, 2009, the NRC
preliminarily determined that apparent
violations of NRC requirements had
occurred at Earth Exploration. The
apparent violations included failure to:
(1) Perform annual reviews of the
radiation protection program as required
by 10 CFR 20.1101(c); (2) perform leak
testing of sealed sources as required by
License Condition 13; (3) perform
physical inventories every 6 months of
sealed sources as required by License
Condition 16; (4) ensure that dosimetry
provided to gauge users was processed
and evaluated by a processor approved
through the National Voluntary
Laboratory Accreditation Program as
required by License Condition 21; (5)
ensure through the Radiation Safety
Officer that required tests and
conditions of the NRC license are
performed as required by License
Condition 21; (6) secure, on multiple
occasions, portable gauges using two
independent physical barriers as
required by 10 CFR 30.34(i); and (7) lock
a gauge or gauge case when in storage
as required by License Condition 19.
Additionally, the NRC identified five
potential violations of 10 CFR 71.5 in
regard to transportation of radioactive
material in accordance with Department
of Transportation regulations in 49 CFR.
These potential violations included
failure to: (1) Ensure proper/legible
markings on packages as required by 49
CFR 178.3(a); (2) label transport
packages as required by 49 CFR
172.403(b); (3) block and brace two
packages as required by 49 CFR
177.842(b); (4) ensure the accessibility
of shipping papers as required by 49
CFR 177.817(e); and (5) provide an
emergency response telephone number
PO 00000
Frm 00092
Fmt 4703
Sfmt 4703
52265
which is monitored at all times when
radioactive material is in transportation
as required by 49 CFR 172.604(a)(1).
The results of the investigation were
sent to Earth Exploration in a letter
dated July 21, 2009. This letter offered
Earth Exploration the opportunity to
either participate in ADR mediation or
to attend a Predecisional Enforcement
Conference. In response to the NRC’s
offer, Earth Exploration requested use of
the NRC’s ADR process to resolve the
issues. On July 31, 2009, the NRC and
Earth Exploration agreed to mediation.
On August 25, 2009, the NRC and Earth
Exploration participated in an ADR
session mediated by a professional
mediator, arranged through Cornell
University’s Institute on Conflict
Resolution. As used by the NRC, ADR
is a process in which a neutral mediator
with no decision-making authority
assists the parties in reaching an
agreement on resolving any differences
regarding the dispute. This
Confirmatory Order is issued pursuant
to the agreement reached during the
ADR process.
III
During the August 25, 2009, ADR
session, a preliminary settlement
agreement was reached. The elements of
the agreement consisted of the
following:
1. Earth Exploration acknowledges the
above violations and confirms that the
violations have been corrected as of
August 31, 2008.
2. Earth Exploration agrees to retain a
qualified consultant to audit the
performance of its radiation safety
program on an annual basis for a period
of 5 years, with the first audit occurring
within 3 months of the date of the
Confirmatory Order. Copies of the
consultant’s audit reports will be
submitted to the Director for the
Division of Nuclear Materials Safety,
Region III, NRC, within 6 weeks
following completion of the audit.
3. Earth Exploration agrees that the
Radiation Safety Officer’s supervisor,
and two individuals acting as assistant
Radiation Safety Officers, one each from
the South Bend and Indianapolis
offices, will receive training on how to
manage a radiation safety program. The
training is to be scheduled within 3
months of the date of the Confirmatory
Order and the training is to be
conducted within 6 months of the date
of the Confirmatory Order. Within 2
weeks of completion of the training,
Earth Exploration will submit to the
Director for the Division of Nuclear
Materials Safety, Region III, NRC, the
course syllabus (to include the dates
E:\FR\FM\09OCN1.SGM
09OCN1
mstockstill on DSKH9S0YB1PROD with NOTICES
52266
Federal Register / Vol. 74, No. 195 / Friday, October 9, 2009 / Notices
and location of the course) and a list of
attendees.
4. Within 3 months of the date of the
Confirmatory Order, Earth Exploration
agrees to conduct ‘‘lessons learned’’
training, to be given by the Radiation
Safety Officer and to be attended by all
employees involved in gauge use, to
address oversight of the radiation safety
program; duties and responsibilities of
the Radiation Safety Officer; and
transportation, use, and security for
portable gauges. The training shall also
address employees’ responsibility to
report safety concerns to licensee
management and the availability of
informing the NRC of any concerns.
Within 2 weeks of completing this
internal training for all employees
involved in gauge use, Earth Exploration
will submit an outline of the
presentation and a list of attendees to
the Director for the Division of Nuclear
Materials Safety, Region III, NRC.
5. Within 30 days of the date of the
Confirmatory Order, Earth Exploration
agrees to have the Radiation Safety
Officer prepare and submit to the
Director for the Division of Nuclear
Materials Safety, Region III, NRC, a plan
to inform other organizations of the
lessons learned about the importance of
ensuring robust radiation safety program
requirements and developing the
necessary infrastructure and
communication paths to identify and
resolve competing priorities that may
preclude successful implementation. As
a part of the plan, Earth Exploration will
submit either the article or a
presentation outline to the Director for
the Division of Nuclear Materials Safety,
Region III, NRC, for review prior to its
use.
6. Earth Exploration, by signing the
Agreement in Principle, makes no
admission that any employee of Earth
Exploration deliberately violated any
NRC requirements and this agreement is
settlement of a disputed claim in order
to avoid further action by the NRC.
7. The NRC agrees to not pursue any
further enforcement action in
connection with the NRC’s July 21,
2009, letter to Earth Exploration. This
does not prohibit the NRC from taking
an enforcement action, in accordance
with the NRC Enforcement Policy, if
Earth Exploration commits a similar
violation in the future or violates the
Order.
On September 10, 2009, Earth
Exploration consented to issuing this
Order with the commitments, as
described in Section V below. Earth
Exploration further agreed that this
Order is to be effective upon issuance
and that it has waived its right to a
hearing.
VerDate Nov<24>2008
16:05 Oct 08, 2009
Jkt 220001
IV
Since Earth Exploration has agreed to
take additional actions to address NRC
concerns, as set forth in Item III above,
the NRC has concluded that its concerns
can be resolved through issuance of this
Order.
I find that the licensee’s commitments
as set forth in Section V are acceptable
and necessary and conclude that, with
these commitments, the public health
and safety are reasonably assured. In
view of the foregoing, I have determined
that public health and safety require
that Earth Exploration’s commitments
be confirmed by this Order. Based on
the above, and Earth Exploration’s
consent, this Order is immediately
effective upon issuance.
V
Accordingly, pursuant to Sections 81,
161b, 161i, 161o, 182 and 186 of the
Atomic Energy Act of 1954, as amended,
and the Commission’s regulations in 10
CFR 2.202 and 10 CFR Part 30, it is
hereby ordered, effective immediately:
1. Earth Exploration shall retain a
qualified consultant to audit the
performance of its radiation safety
program on an annual basis for a period
of 5 years, with the first audit occurring
within 3 months of the date of the
Confirmatory Order. Copies of the
consultant’s audit reports will be
submitted to the Director for the
Division of Nuclear Materials Safety,
Region III, NRC, within 6 weeks
following completion of the audit.
2. Earth Exploration shall ensure that
the Radiation Safety Officer’s
supervisor, and two individuals acting
as assistant Radiation Safety Officers,
one each from the South Bend and
Indianapolis offices, will receive
training on how to manage a radiation
safety program. The training shall be
scheduled within 3 months of the date
of the Confirmatory Order and the
training is to be conducted within 6
months of the date of the Confirmatory
Order. Within 2 weeks of completion of
the training, Earth Exploration shall
submit to the Director for the Division
of Nuclear Materials Safety, Region III,
NRC, the course syllabus (to include the
dates and location of the course) and a
list of attendees.
3. Earth Exploration shall, within 3
months of the date of the Confirmatory
Order, conduct ‘‘lessons learned’’
training, to be given by the Radiation
Safety Officer and to be attended by all
employees involved in gauge use. The
training shall address oversight of the
radiation safety program; duties and
responsibilities of the Radiation Safety
Officer; and transportation, use, and
PO 00000
Frm 00093
Fmt 4703
Sfmt 4703
security for portable gauges. The
training shall also address employees’
responsibility to report safety concerns
to licensee management and the
availability of informing the NRC of any
concerns. Within 2 weeks of completing
this internal training for all employees
involved in gauge use, Earth Exploration
shall submit an outline of the
presentation and a list of attendees to
the Director for the Division of Nuclear
Materials Safety, Region III, NRC.
4. Earth Exploration shall, within 30
days of the date of the Confirmatory
Order, prepare and submit to the
Director for the Division of Nuclear
Materials Safety, Region III, NRC, a plan
to inform other organizations of the
lessons learned about the importance of
ensuring robust radiation safety program
requirements and developing the
necessary infrastructure and
communication paths to identify and
resolve competing priorities that may
preclude successful implementation. As
a part of the plan, Earth Exploration
shall submit either the article or a
presentation outline, to the Director for
the Division of Nuclear Materials Safety,
Region III, NRC, for review prior to its
use.
The Regional Administrator, Region
III, NRC, may, in writing, relax or
rescind any of the above conditions
upon demonstration by Earth
Exploration of good cause.
VI
Any person adversely affected by this
Confirmatory Order, other than Earth
Exploration, may request a hearing
within 20 days of the Order’s
publication in the Federal Register.
Where good cause is shown,
consideration will be given to extending
the time to request a hearing. A request
for extension of time must be directed
to the Director, Office of Enforcement,
U.S. Nuclear Regulatory Commission,
Washington, DC 20555–0001, and
include a statement of good cause for
the extension.
A request for a hearing must be filed
in accordance with the NRC E-Filing
rule, which the NRC promulgated in
August 28, 2007, (72 FR 49139). The EFiling process requires participants to
submit and serve documents over the
internet or, in some cases, to mail copies
on electronic optical storage media.
Participants may not submit paper
copies of their filings unless they seek
a waiver in accordance with the
procedures described below.
To comply with the procedural
requirements associated with E-Filing,
at least five days prior to the filing
deadline the requestor must contact the
Office of the Secretary by e-mail at
E:\FR\FM\09OCN1.SGM
09OCN1
mstockstill on DSKH9S0YB1PROD with NOTICES
Federal Register / Vol. 74, No. 195 / Friday, October 9, 2009 / Notices
hearingdocket@nrc.gov, or by calling
(301) 415–1677, to request: (1) A digital
ID certificate, which allows the
participant (or its counsel or
representative) to digitally sign
documents and access the E-Submittal
server for any NRC proceeding in which
it is participating; and/or (2) creation of
an electronic docket for the proceeding
(even in instances when the requestor
(or its counsel or representative) already
holds an NRC-issued digital ID
certificate). Each requestor will need to
download the Workplace Forms ViewerJ
to access the Electronic Information
Exchange (EIE), a component of the EFiling system. The Workplace Forms
ViewerTM is free and is available at
https://www.nrc.gov/site-help/esubmittals/install-viewer.html.
Information about applying for a digital
ID certificate also is available on NRC’s
public Web site at https://www.nrc.gov/
site-help/e-submittals/applycertificates.html.
Once a requestor has obtained a
digital ID certificate, had a docket
created, and downloaded the EIE
viewer, it can then submit a request for
a hearing through EIE. Submissions
should be in Portable Document Format
(PDF) in accordance with NRC guidance
available on the NRC public Web site at
https://www.nrc.gov/site-help/esubmittals.html. A filing is considered
complete at the time the filer submits its
document through EIE. To be timely,
electronic filings must be submitted to
the EIE system no later than 11:59 p.m.
Eastern Time on the due date. Upon
receipt of a transmission, the E-Filing
system time-stamps the document and
sends the submitter an e-mail notice
confirming receipt of the document. The
EIE system also distributes an e-mail
notice that provides access to the
document to the NRC Office of the
General Counsel and any others who
have advised the Office of the Secretary
that they wish to participate in the
proceeding, so that the filer need not
serve the document on those
participants separately. Therefore, any
others who wish to participate in the
proceeding (or their counsel or
representative) must apply for and
receive a digital ID certificate before a
hearing request is filed so that they may
obtain access to the document via the EFiling system.
A person filing electronically using
the agency’s adjudicatory e-filing system
may seek assistance through the
‘‘Contact Us’’ link located on the NRC
Web site at https://www.nrc.gov/sitehelp/e-submittals.html or by calling the
NRC Meta-System Help Desk, which is
available between 8 a.m. and 8 p.m.,
Eastern Time, Monday through Friday,
VerDate Nov<24>2008
16:05 Oct 08, 2009
Jkt 220001
excluding government holidays. The
Meta-System Help Desk can be
contacted by telephone at 1–866–672–
7640 or by e-mail at
MSHD.Resource@nrc.gov.
Participants who believe that they
have good cause for not submitting
documents electronically must file a
motion, in accordance with 10 CFR
2.302(g), with their initial paper filing
requesting authorization to continue to
submit documents in paper format.
Such filings must be submitted by: (1)
first class mail addressed to the Office
of the Secretary of the Commission, U.S.
Nuclear Regulatory Commission,
Washington, DC 20555–0001, Attention:
Rulemaking and Adjudications Staff; or
(2) courier, express mail, or expedited
delivery service to the Office of the
Secretary, Sixteenth Floor, One White
Flint North, 11555 Rockville, Pike,
Rockville, Maryland, 20852, Attention:
Rulemaking and Adjudications Staff.
Participants filing a document in this
manner are responsible for serving the
document on all other participants.
Filing is considered complete by firstclass mail as of the time of deposit in
the mail, or by courier, express mail, or
expedited delivery service upon
depositing the document with the
provider of the service.
Documents submitted in adjudicatory
proceedings will appear in NRC’s
electronic hearing docket which is
available to the public at https://
ehd.nrc.gov/EHD_Proceeding/home.asp,
unless excluded pursuant to an order of
the Commission, an Atomic Safety and
Licensing Board, or a Presiding Officer.
Participants are requested not to include
personal privacy information, such as
social security numbers, home
addresses, or home phone numbers in
their filings. With respect to copyrighted
works, except for limited excerpts that
serve the purpose of the adjudicatory
filings and would constitute a Fair Use
application, participants are requested
not to include copyrighted materials in
their works.
If a person other than Earth
Exploration requests a hearing, that
person shall set forth with particularity
the manner in which his interest is
adversely affected by this Order and
shall address the criteria set forth in 10
CFR 2.309(d) and (f).
If the hearing is requested by a person
whose interest is adversely affected, the
Commission will issue an Order
designating the time and place of any
hearing. If a hearing is held, the issue to
be considered at such hearing shall be
whether this Confirmatory Order should
be sustained. In the absence of any
request for hearing, or written approval
of an extension of time in which to
PO 00000
Frm 00094
Fmt 4703
Sfmt 4703
52267
request a hearing, the provisions
specified in Section V above shall be
final 20 days from the date this Order
is published in the Federal Register
without further order or proceedings. If
an extension of time for requesting a
hearing has been approved, the
provisions specified in Section V shall
be final when the extension expires, if
a hearing request has not been received.
A request for hearing shall not stay
the immediate effectiveness of this
order.
For the U.S. Nuclear Regulatory
Commission.
Dated this 1st day of October 2009.
Cynthia D. Pederson,
Deputy Regional Administrator, Region III.
[FR Doc. E9–24423 Filed 10–8–09; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2008–0439]
Office of New Reactors; Final Interim
Staff Guidance on Evaluation and
Acceptance Criteria for 10 CFR 20.1406
To Support Design Certification and
Combined License Applications
AGENCY: Nuclear Regulatory
Commission (NRC).
ACTION: Notice of availability.
SUMMARY: The NRC is issuing its Final
Interim Staff Guidance (ISG) DC/COL–
ISG–06 (Agencywide Documents Access
and Management System (ADAMS)
Accession No. ML092470100). The
purpose of this ISG is to clarify NRC
position on what is an acceptable level
of detail and content for demonstrating
compliance with Title 10 of the Code of
Federal Regulations, Section 20.1406
(10 CFR 20.1406). Regulatory Guide
4.21, ‘‘Minimization of Contamination
and Waste Generation: Life Cycle
Planning,’’ provides an acceptable
method of demonstrating compliance.
This ISG provides further clarification
on the evaluation and acceptance
criteria that will be used by NRC staff
in reaching a reasonable assurance
finding that a design certification (DC)
or combined license (COL) applicant
has complied with the requirements of
10 CFR 20.1406. The NRC staff issues
DC/COL–ISGs to facilitate timely
implementation of current staff
guidance and to facilitate activities
associated with review of applications
for DCs and COLs by the Office of New
Reactors. The NRC staff will also
incorporate the approved DC/COL–ISG–
06 into the next revision of the SRP and
related guidance documents.
E:\FR\FM\09OCN1.SGM
09OCN1
Agencies
[Federal Register Volume 74, Number 195 (Friday, October 9, 2009)]
[Notices]
[Pages 52265-52267]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-24423]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[NRC-2009-0445, Docket Number 030-32764, License Number 13-26408-01,
EA-09-114]
In the Matter of Earth Exploration, Inc.: Indianapolis, IN;
Confirmatory Order (Effective Immediately)
I
Earth Exploration, Inc., (Earth Exploration or licensee) is the
holder of Materials License No. 13-26408-01 issued by the U.S. Nuclear
Regulatory Commission (NRC or Commission) pursuant to 10 CFR Part 30 on
June 3, 1992. The license authorizes Earth Exploration to store
portable gauges at its permanent facilities in Indianapolis and South
Bend, Indiana, and to use those portable gauges at temporary job sites.
This Confirmatory Order is the result of an agreement reached
during an Alternative Dispute Resolution (ADR) mediation session
conducted on August 25, 2009.
II
On July 21, 2008, the NRC conducted an onsite inspection at the
Earth Exploration main office in Indianapolis, Indiana, and at two
temporary job sites in Indianapolis. Additional onsite inspections were
held on August 14 and 15, 2008, at the South Bend field office and a
temporary job site in South Bend, Indiana. The purpose of the
inspections was to review licensee activities related to radiation
safety and to assess licensee compliance with the Commission's rules
and regulations and with the conditions of the Earth Exploration
license. As a result of the inspection observations, the NRC Office of
Investigations (OI) initiated an investigation (OI Case No. 3-2008-026)
and on April 27, 2009, the NRC preliminarily determined that apparent
violations of NRC requirements had occurred at Earth Exploration. The
apparent violations included failure to: (1) Perform annual reviews of
the radiation protection program as required by 10 CFR 20.1101(c); (2)
perform leak testing of sealed sources as required by License Condition
13; (3) perform physical inventories every 6 months of sealed sources
as required by License Condition 16; (4) ensure that dosimetry provided
to gauge users was processed and evaluated by a processor approved
through the National Voluntary Laboratory Accreditation Program as
required by License Condition 21; (5) ensure through the Radiation
Safety Officer that required tests and conditions of the NRC license
are performed as required by License Condition 21; (6) secure, on
multiple occasions, portable gauges using two independent physical
barriers as required by 10 CFR 30.34(i); and (7) lock a gauge or gauge
case when in storage as required by License Condition 19. Additionally,
the NRC identified five potential violations of 10 CFR 71.5 in regard
to transportation of radioactive material in accordance with Department
of Transportation regulations in 49 CFR. These potential violations
included failure to: (1) Ensure proper/legible markings on packages as
required by 49 CFR 178.3(a); (2) label transport packages as required
by 49 CFR 172.403(b); (3) block and brace two packages as required by
49 CFR 177.842(b); (4) ensure the accessibility of shipping papers as
required by 49 CFR 177.817(e); and (5) provide an emergency response
telephone number which is monitored at all times when radioactive
material is in transportation as required by 49 CFR 172.604(a)(1).
The results of the investigation were sent to Earth Exploration in
a letter dated July 21, 2009. This letter offered Earth Exploration the
opportunity to either participate in ADR mediation or to attend a
Predecisional Enforcement Conference. In response to the NRC's offer,
Earth Exploration requested use of the NRC's ADR process to resolve the
issues. On July 31, 2009, the NRC and Earth Exploration agreed to
mediation. On August 25, 2009, the NRC and Earth Exploration
participated in an ADR session mediated by a professional mediator,
arranged through Cornell University's Institute on Conflict Resolution.
As used by the NRC, ADR is a process in which a neutral mediator with
no decision-making authority assists the parties in reaching an
agreement on resolving any differences regarding the dispute. This
Confirmatory Order is issued pursuant to the agreement reached during
the ADR process.
III
During the August 25, 2009, ADR session, a preliminary settlement
agreement was reached. The elements of the agreement consisted of the
following:
1. Earth Exploration acknowledges the above violations and confirms
that the violations have been corrected as of August 31, 2008.
2. Earth Exploration agrees to retain a qualified consultant to
audit the performance of its radiation safety program on an annual
basis for a period of 5 years, with the first audit occurring within 3
months of the date of the Confirmatory Order. Copies of the
consultant's audit reports will be submitted to the Director for the
Division of Nuclear Materials Safety, Region III, NRC, within 6 weeks
following completion of the audit.
3. Earth Exploration agrees that the Radiation Safety Officer's
supervisor, and two individuals acting as assistant Radiation Safety
Officers, one each from the South Bend and Indianapolis offices, will
receive training on how to manage a radiation safety program. The
training is to be scheduled within 3 months of the date of the
Confirmatory Order and the training is to be conducted within 6 months
of the date of the Confirmatory Order. Within 2 weeks of completion of
the training, Earth Exploration will submit to the Director for the
Division of Nuclear Materials Safety, Region III, NRC, the course
syllabus (to include the dates
[[Page 52266]]
and location of the course) and a list of attendees.
4. Within 3 months of the date of the Confirmatory Order, Earth
Exploration agrees to conduct ``lessons learned'' training, to be given
by the Radiation Safety Officer and to be attended by all employees
involved in gauge use, to address oversight of the radiation safety
program; duties and responsibilities of the Radiation Safety Officer;
and transportation, use, and security for portable gauges. The training
shall also address employees' responsibility to report safety concerns
to licensee management and the availability of informing the NRC of any
concerns. Within 2 weeks of completing this internal training for all
employees involved in gauge use, Earth Exploration will submit an
outline of the presentation and a list of attendees to the Director for
the Division of Nuclear Materials Safety, Region III, NRC.
5. Within 30 days of the date of the Confirmatory Order, Earth
Exploration agrees to have the Radiation Safety Officer prepare and
submit to the Director for the Division of Nuclear Materials Safety,
Region III, NRC, a plan to inform other organizations of the lessons
learned about the importance of ensuring robust radiation safety
program requirements and developing the necessary infrastructure and
communication paths to identify and resolve competing priorities that
may preclude successful implementation. As a part of the plan, Earth
Exploration will submit either the article or a presentation outline to
the Director for the Division of Nuclear Materials Safety, Region III,
NRC, for review prior to its use.
6. Earth Exploration, by signing the Agreement in Principle, makes
no admission that any employee of Earth Exploration deliberately
violated any NRC requirements and this agreement is settlement of a
disputed claim in order to avoid further action by the NRC.
7. The NRC agrees to not pursue any further enforcement action in
connection with the NRC's July 21, 2009, letter to Earth Exploration.
This does not prohibit the NRC from taking an enforcement action, in
accordance with the NRC Enforcement Policy, if Earth Exploration
commits a similar violation in the future or violates the Order.
On September 10, 2009, Earth Exploration consented to issuing this
Order with the commitments, as described in Section V below. Earth
Exploration further agreed that this Order is to be effective upon
issuance and that it has waived its right to a hearing.
IV
Since Earth Exploration has agreed to take additional actions to
address NRC concerns, as set forth in Item III above, the NRC has
concluded that its concerns can be resolved through issuance of this
Order.
I find that the licensee's commitments as set forth in Section V
are acceptable and necessary and conclude that, with these commitments,
the public health and safety are reasonably assured. In view of the
foregoing, I have determined that public health and safety require that
Earth Exploration's commitments be confirmed by this Order. Based on
the above, and Earth Exploration's consent, this Order is immediately
effective upon issuance.
V
Accordingly, pursuant to Sections 81, 161b, 161i, 161o, 182 and 186
of the Atomic Energy Act of 1954, as amended, and the Commission's
regulations in 10 CFR 2.202 and 10 CFR Part 30, it is hereby ordered,
effective immediately:
1. Earth Exploration shall retain a qualified consultant to audit
the performance of its radiation safety program on an annual basis for
a period of 5 years, with the first audit occurring within 3 months of
the date of the Confirmatory Order. Copies of the consultant's audit
reports will be submitted to the Director for the Division of Nuclear
Materials Safety, Region III, NRC, within 6 weeks following completion
of the audit.
2. Earth Exploration shall ensure that the Radiation Safety
Officer's supervisor, and two individuals acting as assistant Radiation
Safety Officers, one each from the South Bend and Indianapolis offices,
will receive training on how to manage a radiation safety program. The
training shall be scheduled within 3 months of the date of the
Confirmatory Order and the training is to be conducted within 6 months
of the date of the Confirmatory Order. Within 2 weeks of completion of
the training, Earth Exploration shall submit to the Director for the
Division of Nuclear Materials Safety, Region III, NRC, the course
syllabus (to include the dates and location of the course) and a list
of attendees.
3. Earth Exploration shall, within 3 months of the date of the
Confirmatory Order, conduct ``lessons learned'' training, to be given
by the Radiation Safety Officer and to be attended by all employees
involved in gauge use. The training shall address oversight of the
radiation safety program; duties and responsibilities of the Radiation
Safety Officer; and transportation, use, and security for portable
gauges. The training shall also address employees' responsibility to
report safety concerns to licensee management and the availability of
informing the NRC of any concerns. Within 2 weeks of completing this
internal training for all employees involved in gauge use, Earth
Exploration shall submit an outline of the presentation and a list of
attendees to the Director for the Division of Nuclear Materials Safety,
Region III, NRC.
4. Earth Exploration shall, within 30 days of the date of the
Confirmatory Order, prepare and submit to the Director for the Division
of Nuclear Materials Safety, Region III, NRC, a plan to inform other
organizations of the lessons learned about the importance of ensuring
robust radiation safety program requirements and developing the
necessary infrastructure and communication paths to identify and
resolve competing priorities that may preclude successful
implementation. As a part of the plan, Earth Exploration shall submit
either the article or a presentation outline, to the Director for the
Division of Nuclear Materials Safety, Region III, NRC, for review prior
to its use.
The Regional Administrator, Region III, NRC, may, in writing, relax
or rescind any of the above conditions upon demonstration by Earth
Exploration of good cause.
VI
Any person adversely affected by this Confirmatory Order, other
than Earth Exploration, may request a hearing within 20 days of the
Order's publication in the Federal Register. Where good cause is shown,
consideration will be given to extending the time to request a hearing.
A request for extension of time must be directed to the Director,
Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington,
DC 20555-0001, and include a statement of good cause for the extension.
A request for a hearing must be filed in accordance with the NRC E-
Filing rule, which the NRC promulgated in August 28, 2007, (72 FR
49139). The E-Filing process requires participants to submit and serve
documents over the internet or, in some cases, to mail copies on
electronic optical storage media. Participants may not submit paper
copies of their filings unless they seek a waiver in accordance with
the procedures described below.
To comply with the procedural requirements associated with E-
Filing, at least five days prior to the filing deadline the requestor
must contact the Office of the Secretary by e-mail at
[[Page 52267]]
hearingdocket@nrc.gov, or by calling (301) 415-1677, to request: (1) A
digital ID certificate, which allows the participant (or its counsel or
representative) to digitally sign documents and access the E-Submittal
server for any NRC proceeding in which it is participating; and/or (2)
creation of an electronic docket for the proceeding (even in instances
when the requestor (or its counsel or representative) already holds an
NRC-issued digital ID certificate). Each requestor will need to
download the Workplace Forms ViewerJ to access the Electronic
Information Exchange (EIE), a component of the E-Filing system. The
Workplace Forms ViewerTM is free and is available at https://www.nrc.gov/site-help/e-submittals/install-viewer.html. Information
about applying for a digital ID certificate also is available on NRC's
public Web site at https://www.nrc.gov/site-help/e-submittals/apply-certificates.html.
Once a requestor has obtained a digital ID certificate, had a
docket created, and downloaded the EIE viewer, it can then submit a
request for a hearing through EIE. Submissions should be in Portable
Document Format (PDF) in accordance with NRC guidance available on the
NRC public Web site at https://www.nrc.gov/site-help/e-submittals.html.
A filing is considered complete at the time the filer submits its
document through EIE. To be timely, electronic filings must be
submitted to the EIE system no later than 11:59 p.m. Eastern Time on
the due date. Upon receipt of a transmission, the E-Filing system time-
stamps the document and sends the submitter an e-mail notice confirming
receipt of the document. The EIE system also distributes an e-mail
notice that provides access to the document to the NRC Office of the
General Counsel and any others who have advised the Office of the
Secretary that they wish to participate in the proceeding, so that the
filer need not serve the document on those participants separately.
Therefore, any others who wish to participate in the proceeding (or
their counsel or representative) must apply for and receive a digital
ID certificate before a hearing request is filed so that they may
obtain access to the document via the E-Filing system.
A person filing electronically using the agency's adjudicatory e-
filing system may seek assistance through the ``Contact Us'' link
located on the NRC Web site at https://www.nrc.gov/site-help/e-submittals.html or by calling the NRC Meta-System Help Desk, which is
available between 8 a.m. and 8 p.m., Eastern Time, Monday through
Friday, excluding government holidays. The Meta-System Help Desk can be
contacted by telephone at 1-866-672-7640 or by e-mail at
MSHD.Resource@nrc.gov.
Participants who believe that they have good cause for not
submitting documents electronically must file a motion, in accordance
with 10 CFR 2.302(g), with their initial paper filing requesting
authorization to continue to submit documents in paper format. Such
filings must be submitted by: (1) first class mail addressed to the
Office of the Secretary of the Commission, U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, Attention: Rulemaking and
Adjudications Staff; or (2) courier, express mail, or expedited
delivery service to the Office of the Secretary, Sixteenth Floor, One
White Flint North, 11555 Rockville, Pike, Rockville, Maryland, 20852,
Attention: Rulemaking and Adjudications Staff. Participants filing a
document in this manner are responsible for serving the document on all
other participants. Filing is considered complete by first-class mail
as of the time of deposit in the mail, or by courier, express mail, or
expedited delivery service upon depositing the document with the
provider of the service.
Documents submitted in adjudicatory proceedings will appear in
NRC's electronic hearing docket which is available to the public at
https://ehd.nrc.gov/EHD_Proceeding/home.asp, unless excluded pursuant
to an order of the Commission, an Atomic Safety and Licensing Board, or
a Presiding Officer. Participants are requested not to include personal
privacy information, such as social security numbers, home addresses,
or home phone numbers in their filings. With respect to copyrighted
works, except for limited excerpts that serve the purpose of the
adjudicatory filings and would constitute a Fair Use application,
participants are requested not to include copyrighted materials in
their works.
If a person other than Earth Exploration requests a hearing, that
person shall set forth with particularity the manner in which his
interest is adversely affected by this Order and shall address the
criteria set forth in 10 CFR 2.309(d) and (f).
If the hearing is requested by a person whose interest is adversely
affected, the Commission will issue an Order designating the time and
place of any hearing. If a hearing is held, the issue to be considered
at such hearing shall be whether this Confirmatory Order should be
sustained. In the absence of any request for hearing, or written
approval of an extension of time in which to request a hearing, the
provisions specified in Section V above shall be final 20 days from the
date this Order is published in the Federal Register without further
order or proceedings. If an extension of time for requesting a hearing
has been approved, the provisions specified in Section V shall be final
when the extension expires, if a hearing request has not been received.
A request for hearing shall not stay the immediate effectiveness of
this order.
For the U.S. Nuclear Regulatory Commission.
Dated this 1st day of October 2009.
Cynthia D. Pederson,
Deputy Regional Administrator, Region III.