Notice of Intent, Pursuant to the Authority in Section 2(h)(7) of the Commodity Exchange Act and Commission Rule 36.3(c)(3), To Undertake a Determination Whether the PG&E Citygate Financial Basis Contract, Offered for Trading on the IntercontinentalExchange, Inc., Performs a Significant Price Discovery Function, 52210-52212 [E9-24390]

Download as PDF 52210 Federal Register / Vol. 74, No. 195 / Friday, October 9, 2009 / Notices assigned OMB control number 3038– 0060 to this collection of information. COMMODITY FUTURES TRADING COMMISSION B. Cost-Benefit Analysis Notice of Intent, Pursuant to the Authority in Section 2(h)(7) of the Commodity Exchange Act and Commission Rule 36.3(c)(3), To Undertake a Determination Whether the PG&E Citygate Financial Basis Contract, Offered for Trading on the IntercontinentalExchange, Inc., Performs a Significant Price Discovery Function Section 15(a) of the CEA 9 requires the Commission to consider the costs and benefits of its actions before issuing an order under the Act. By its terms, section 15(a) does not require the Commission to quantify the costs and benefits of such an order or to determine whether the benefits of such an order outweigh its costs; rather, it requires that the Commission ‘‘consider’’ the costs and benefits of its action. Section 15(a) further specifies that the costs and benefits shall be evaluated in light of five broad areas of market and public concern: (1) Protection of market participants and the public; (2) efficiency, competitiveness, and financial integrity of futures markets; (3) price discovery; (4) sound risk management practices; and (5) other public interest considerations. The bulk of the costs imposed by the requirements of Commission Rule 36.3 relate to significant and increased information-submission and reporting requirements adopted in response to the Reauthorization Act’s directive that the Commission take an active role in determining whether contracts listed by ECMs qualify as SPDCs. The enhanced requirements for ECMs will permit the Commission to acquire the information it needs to discharge its newlymandated responsibilities and to ensure that ECMs with SPDCs are identified as entities with the elevated status of registered entity under the CEA and are in compliance with the statutory terms of the core principles of section 2(h)(7)(C) of the Act. The primary benefit to the public is to enable the Commission to discharge its statutory obligation to monitor for the presence of SPDCs and extend its oversight to the trading of SPDCs. Issued in Washington, DC on October 5, 2009 by the Commission. David A. Stawick, Secretary of the Commission. [FR Doc. E9–24386 Filed 10–8–09; 8:45 am] mstockstill on DSKH9S0YB1PROD with NOTICES BILLING CODE 6351–01–P 97 U.S.C.19(a). VerDate Nov<24>2008 16:05 Oct 08, 2009 Jkt 220001 AGENCY: Commodity Futures Trading Commission. ACTION: Notice of action and request for comment. SUMMARY: The Commodity Futures Trading Commission (‘‘CFTC’’ or ‘‘Commission’’) is undertaking a review to determine whether the PG&E Citygate Financial Basis (‘‘PGE’’) contract, offered for trading on the IntercontinentalExchange, Inc. (‘‘ICE’’), an exempt commercial market (‘‘ECM’’) under Sections 2(h)(3)–(5) of the Commodity Exchange Act (‘‘CEA’’ or the ‘‘Act’’), performs a significant price discovery function. Authority for this action is found in section 2(h)(7) of the CEA and Commission rule 36.3(c) promulgated thereunder. In connection with this evaluation, the Commission invites comment from interested parties. DATES: Comments must be received on or before October 26, 2009. ADDRESSES: Comments may be submitted by any of the following methods: • Follow the instructions for submitting comments. Federal eRulemaking Portal: https:// www.regulations.gov • E-mail: secretary@cftc.gov. Include PG&E Citygate Financial Basis (PGE) Contract in the subject line of the message. • Fax: (202) 418–5521 • Mail: Send to David A. Stawick, Secretary, Commodity Futures Trading Commission, Three Lafayette Centre, 1155 21st Street, NW., Washington, DC 20581 • Courier: Same as mail above. All comments received will be posted without change to https:// www.CFTC.gov/. FOR FURTHER INFORMATION CONTACT: Gregory K. Price, Industry Economist, Division of Market Oversight, Commodity Futures Trading Commission, Three Lafayette Centre, 1155 21st Street, NW., Washington, DC 20581. Telephone: (202) 418–5515. Email: gprice@cftc.gov; or Susan Nathan, Senior Special Counsel, Division of Market Oversight, same address. PO 00000 Frm 00037 Fmt 4703 Sfmt 4703 Telephone: (202) 418–5133. E-mail: snathan@cftc.gov. SUPPLEMENTARY INFORMATION: I. Introduction On March 16, 2009, the CFTC promulgated final rules implementing provisions of the CFTC Reauthorization Act of 2008 (‘‘Reauthorization Act’’) 1 which subjects ECMs with significant price discovery contracts (‘‘SPDCs’’) to self-regulatory and reporting requirements, as well as certain Commission oversight authorities, with respect to those contracts. Among other things, these rules and rule amendments revise the information-submission requirements applicable to ECMs, establish procedures and standards by which the Commission will determine whether an ECM contract performs a significant price discovery function, and provide guidance with respect to compliance with nine statutory core principles applicable to ECMs with SPDCs. These rules became effective on April 22, 2009. In determining whether an ECM’s contract is or is not a SPDC, the Commission will evaluate the contract’s material liquidity, price linkage to other contracts, potential for arbitrage with other contracts traded on designated contract markets or derivatives transaction execution facilities, use of the ECM contract’s prices to execute or settle other transactions, and other factors. In order to facilitate the Commission’s identification of possible SPDCs, Commission rule 36.3(c)(2) requires that an ECM operating in reliance on section 2(h)(3) promptly notify the Commission and provide supporting information or data concerning any contract: (i) That averaged five trades per day or more over the most recent calendar quarter; and (ii)(A) for which the ECM sells price information regarding the contract to market participants or industry publications; or (B) whose daily closing or settlement prices on 95 percent or more of the days in the most recent quarter were within 2.5 percent of the contemporaneously determined closing, settlement, or other daily price of another agreement. II. Determination of a SPDC A. The SPDC Determination Process Commission rule 36.3(c)(3) establishes the procedures by which the Commission makes and announces its determination on whether a specific ECM contract serves a significant price 1 74 FR 12178 (Mar. 23, 2009); these rules became effective on April 22, 2009. E:\FR\FM\09OCN1.SGM 09OCN1 Federal Register / Vol. 74, No. 195 / Friday, October 9, 2009 / Notices discovery function. Under those procedures, the Commission will publish a notice in the Federal Register that it intends to undertake a determination as to whether the specified agreement, contract, or transaction performs a significant price discovery function and to receive written data, views, and arguments relevant to its determination from the ECM and other interested persons.2 After prompt consideration of all relevant information,3 the Commission will, within a reasonable period of time after the close of the comment period, issue an order explaining its determination. Following the issuance of an order by the Commission that the ECM executes or trades an agreement, contract, or transaction that performs a significant price discovery function, the ECM must demonstrate, with respect to that agreement, contract, or transaction, compliance with the core principles under section 2(h)(7)(C) of the CEA 4 and the applicable provisions of Part 36. If the Commission’s order represents the first time it has determined that one of the ECM’s contracts performs a significant price discovery function, the ECM must submit a written demonstration of its compliance with the core principles within 90 calendar days of the date of the Commission’s order. For each subsequent determination by the Commission that the ECM has an additional SPDC, the ECM must submit a written demonstration of its compliance with the core principles within 30 calendar days of the Commission’s order. mstockstill on DSKH9S0YB1PROD with NOTICES B. PG&E Citygate Financial Basis Contract The PGE contract is cash settled based on the difference between the bidweek price index for a particular calendar month at the PG&E Citygate hub, as published by Intelligence Press, Inc. (IPI), in NGI’s Bidweek Survey, and the final settlement price of the New York Mercantile Exchange’s (NYMEX’s) physically-delivered Henry Hub natural 2 The Commission may commence this process on its own initiative or on the basis of information provided to it by an ECM pursuant to the notification provisions of Commission rule 36.3(c)(2). 3 Where appropriate, the Commission may choose to interview market participants regarding their impressions of a particular contract. Further, while they may not provide direct evidentiary support with respect to a particular contract, the Commission may rely for background and context on resources such as its October 2007 Report on the Oversight of Trading on Regulated Futures Exchanges and Exempt Commercial Markets (‘‘ECM Study’’). https://www.cftc.gov/stellent/groups/ public/@newsroom/documents/file/ pr5403-07_ecmreport.pdf. 4 7 U.S.C. 2(h)(7)(C). VerDate Nov<24>2008 16:05 Oct 08, 2009 Jkt 220001 gas futures contract for the same calendar month. The bidweek price is computed from fixed-price, bilateral transactions executed during the last five business days of a given month, where the transactions specify the delivery of natural gas at the PG&E hub during the following calendar month. The price index is computed as the volume-weighted average of the applicable natural gas transactions. Bidweek prices are published on the first business day of the month in which the gas flows. The size of the PGE contract is 2,500 mmBtu, and the unit of trading is any multiple of 2,500 mmBtu. The PGE contract is listed for up to 72 calendar months commencing with the next calendar month. Based upon a required quarterly notification filed on July 27, 2009 (mandatory under Rule 36.3(c)(2)), the ICE reported that, with respect to its PGE contract, the total number of trades was 1,142 in the second quarter of 2009, resulting in a daily average of 17.8 trades. During the same period, the PGE contract had a total trading volume of 99,418 contracts and an average daily trading volume of 1,553.4 contracts. Moreover, the open interest as of June 30, 2009, was 150,299 contracts. It appears that the PGE contract may satisfy the material liquidity, price linkage, and material price reference factors for SPDC determination. With respect to material liquidity, trading in the ICE PGE contract averaged more than 1,500 contracts on a daily basis, with more than 15 separate transactions each day. In addition, the open interest in the subject contract was substantial. In regard to price linkage, the final settlement price of the PGE contract is based, in part, on the final settlement price of the NYMEX’s physicallydelivered natural gas contract, where the NYMEX is registered with the Commission as a designated contract market (‘‘DCM’’). In terms of material price reference, the ICE maintains exclusive rights over IPI’s bidweek price indices. As a result, no other exchange can offer such a basis contract based on IPI’s PG&E bidweek index. While other third-party price providers produce natural gas price indices for a variety of trading centers, those indices may not have the same values or quality as IPI’s price indices; each company’s bidweek indices are based on transactions that are consummated during the last five days of the month prior to delivery and are voluntarily submitted by traders. In addition, the ICE sells its price data to market participants in a number of different packages which vary in terms of the hubs covered, time periods, and whether the data are daily only or PO 00000 Frm 00038 Fmt 4703 Sfmt 4703 52211 historical. For example, the ICE offers ‘‘West Gas End of Day’’ and ‘‘OTC Gas End of Day’’ data packages with access to all price data or just 12, 24, 36, or 48 months of historical data. III. Request for Comment In evaluating whether an ECM’s agreement, contract, or transaction performs a significant price discovery function, section 2(h)(7) of the CEA directs the Commission to consider, as appropriate, four specific criteria: Price linkage, arbitrage, material price reference, and material liquidity. As it explained in Appendix A to the Part 36 rules,5 the Commission, in making SPDC determinations, will apply and weigh each factor, as appropriate, to the specific contract and circumstances under consideration. As part of its evaluation, the Commission will consider the written data, views, and arguments from any ECM that lists the potential SPDC and from any other interested parties. Accordingly, the Commission requests comment on whether the ICE’s PGE contract performs a significant price discovery function. Commenters’ attention is directed particularly to Appendix A of the Commission’s Part 36 rules for a detailed discussion of the factors relevant to a SPDC determination. The Commission notes that comments which analyze the contract in terms of these factors will be especially helpful to the determination process. In order to determine the relevance of comments received, the Commission requests that commenters explain in what capacity are they knowledgeable about the subject contract. IV. Related Matters A. Paperwork Reduction Act The Paperwork Reduction Act of 1995 (‘‘PRA’’) 6 imposes certain requirements on federal agencies, including the Commission, in connection with their conducting or sponsoring any collection of information, as defined by the PRA. Certain provisions of final Commission rule 36.3 impose new regulatory and reporting requirements on ECMs, resulting in information collection requirements within the meaning of the PRA; OMB previously has approved and assigned OMB control number 3038– 0060 to this collection of information. 5 17 6 44 E:\FR\FM\09OCN1.SGM CFR Part 36, Appendix A. U.S.C. 3507(d). 09OCN1 52212 Federal Register / Vol. 74, No. 195 / Friday, October 9, 2009 / Notices B. Cost-Benefit Analysis Section 15(a) of the CEA 7 requires the Commission to consider the costs and benefits of its actions before issuing an order under the Act. By its terms, section 15(a) does not require the Commission to quantify the costs and benefits of such an order or to determine whether the benefits of such an order outweigh its costs; rather, it requires that the Commission ‘‘consider’’ the costs and benefits of its action. Section 15(a) further specifies that the costs and benefits shall be evaluated in light of five broad areas of market and public concern: (1) Protection of market participants and the public; (2) efficiency, competitiveness, and financial integrity of futures markets; (3) price discovery; (4) sound risk management practices; and (5) other public interest considerations. The bulk of the costs imposed by the requirements of Commission Rule 36.3 relate to significant and increased information-submission and reporting requirements adopted in response to the Reauthorization Act’s directive that the Commission take an active role in determining whether contracts listed by ECMs qualify as SPDCs. The enhanced requirements for ECMs will permit the Commission to acquire the information it needs to discharge its newlymandated responsibilities and to ensure that ECMs with SPDCs are identified as entities with the elevated status of registered entity under the CEA and are in compliance with the statutory terms of the core principles of section 2(h)(7)(C) of the Act. The primary benefit to the public is to enable the Commission to discharge its statutory obligation to monitor for the presence of SPDCs and extend its oversight to the trading of SPDCs. Issued in Washington, DC, on October 5, 2009 by the Commission. David A. Stawick, Secretary of the Commission. [FR Doc. E9–24390 Filed 10–8–09; 8:45 am] BILLING CODE 6351–01–P COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meetings mstockstill on DSKH9S0YB1PROD with NOTICES AGENCY HOLDING THE MEETING: Commodity Futures Trading Commission. Sunshine Act Meetings TIME AND DATE: 11 a.m., Tuesday, October 27, 2009. 77 U.S.C. 19(a). VerDate Nov<24>2008 16:05 Oct 08, 2009 Jkt 220001 PLACE: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. STATUS: Closed. MATTERS TO BE CONSIDERED: Rule Enforcement Review Meeting. CONTACT PERSON FOR MORE INFORMATION: Sauntia S. Warfield, 202–418–5084. Sauntia S. Warfield, Assistant Secretary of the Commission. [FR Doc. E9–24560 Filed 10–7–09; 4:15 pm] BILLING CODE 6351–01–P DEPARTMENT OF DEFENSE Department of the Army; Corps of Engineers Intent To Prepare a Draft Environmental Impact Statement for the Proposed Dallas Floodway Project, a Multipurpose Project Containing Levee Remediation, Flood Risk Management, Ecosystem Restoration, Recreation Enhancement, and Other Proposed Projects Along the Trinity River Within and Adjacent to the Existing Dallas Floodway in Dallas County, Dallas TX AGENCY: Department of the Army, U.S. Army Corps of Engineers, DoD. ACTION: Notice of intent. SUMMARY: The U.S. Army Corps of Engineers (USACE), Fort Worth District, in partnership with the City of Dallas, intends to prepare a Draft Environmental Impact Statement (DEIS), pursuant to Section 102 of the National Environmental Policy Act (NEPA) as implemented by the regulations promulgated by the Council on Environmental Quality (40 Code of Federal Regulations Parts 1500–1508 and USACE Engineering Regulation 200–2–2) to analyze the potential comprehensive environmental consequences resulting from the implementation of proposed levee remediation, flood risk management, ecosystem restoration, recreation enhancement, and other proposed projects in and around the Dallas Floodway, in Dallas, TX. The USACE is preparing the DEIS in response to the authority contained in the United States Senate Committee on Environment and Public Works Resolution dated April 22, 1988, and Section 5141 of the Water Resources Development Act WRDA of 2007. The USACE must determine the technical soundness and environmental acceptability of the authorized project, levee remediation plans and other PO 00000 Frm 00039 Fmt 4703 Sfmt 4703 projects that are being proposed within and adjacent to the Dallas Floodway. The study area is located in and adjacent to the Dallas Floodway along the Trinity River, in Dallas, TX. The study area includes the area bound by the Loop 12 crossing of the Elm Fork and the I–30 crossing of the West Fork (river mile 505.50) to the southeastern edge of the Central Wastewater Treatment Plant on the Trinity River (river mile 494.63), as well as areas to the east and west of the Dallas Floodway to incorporate drainage basins associated with the east and west levee interior drainage systems. The study area encompasses approximately 36,292 acres. FOR FURTHER INFORMATION CONTACT: For questions regarding the Dallas Floodway Projects EIS, please contact Mr. Jeffry Tripe, Regional Technical Specialist, U.S. Army Corps of Engineers, Fort Worth District, P.O. Box 17300, Fort Worth, TX, 76102–0300, (817) 886– 1716, or via e-mail at Jeffry.A.Tripe@usace.army.mil. SUPPLEMENTARY INFORMATION: The Dallas County Levee Improvement District (DCLID) constructed the original Dallas Floodway levees between 1928 and 1931. The DCLID rerouted the Trinity River by constructing a channel within the leveed floodway and filled the original river channel or used it for sump storage. In the mid-forties, major floods, compounded by continued urbanization in the watershed, resulted in increased drainage into the Dallas Floodway and severe flooding. To reduce flooding within the Dallas Floodway project area, Congress authorized the Dallas Floodway flood control project in 1945 and 1950. This resulted in several USACE improvements to the Dallas Floodway, completed in 1958. The existing Upper Trinity River Feasibility Study (UTRFS) serves as an umbrella study to all USACE projects in the basin. The USACE initiated the UTRFS in response to the authority contained in the United States Senate Committee on Environment and Public Works Resolution dated April 22, 1988. This authorizing legislation for the overall study defines the area of investigations as the Upper Trinity River Basin, with specific emphasis on the Dallas-Fort Worth Metroplex. The UTRFS identified approximately 90 potential projects addressing flood risk management, ecosystem restoration, and recreation within the study area. In May 1996, acting as the nonFederal sponsor on the on-going UTRFS, the North Central Texas Council of Governments coordinated with the E:\FR\FM\09OCN1.SGM 09OCN1

Agencies

[Federal Register Volume 74, Number 195 (Friday, October 9, 2009)]
[Notices]
[Pages 52210-52212]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-24390]


-----------------------------------------------------------------------

COMMODITY FUTURES TRADING COMMISSION


Notice of Intent, Pursuant to the Authority in Section 2(h)(7) of 
the Commodity Exchange Act and Commission Rule 36.3(c)(3), To Undertake 
a Determination Whether the PG&E Citygate Financial Basis Contract, 
Offered for Trading on the IntercontinentalExchange, Inc., Performs a 
Significant Price Discovery Function

AGENCY: Commodity Futures Trading Commission.

ACTION: Notice of action and request for comment.

-----------------------------------------------------------------------

SUMMARY: The Commodity Futures Trading Commission (``CFTC'' or 
``Commission'') is undertaking a review to determine whether the PG&E 
Citygate Financial Basis (``PGE'') contract, offered for trading on the 
IntercontinentalExchange, Inc. (``ICE''), an exempt commercial market 
(``ECM'') under Sections 2(h)(3)-(5) of the Commodity Exchange Act 
(``CEA'' or the ``Act''), performs a significant price discovery 
function. Authority for this action is found in section 2(h)(7) of the 
CEA and Commission rule 36.3(c) promulgated thereunder. In connection 
with this evaluation, the Commission invites comment from interested 
parties.

DATES: Comments must be received on or before October 26, 2009.

ADDRESSES: Comments may be submitted by any of the following methods:
     Follow the instructions for submitting comments. Federal 
eRulemaking Portal: https://www.regulations.gov
     E-mail: secretary@cftc.gov. Include PG&E Citygate 
Financial Basis (PGE) Contract in the subject line of the message.
     Fax: (202) 418-5521
     Mail: Send to David A. Stawick, Secretary, Commodity 
Futures Trading Commission, Three Lafayette Centre, 1155 21st Street, 
NW., Washington, DC 20581
     Courier: Same as mail above.
    All comments received will be posted without change to https://www.CFTC.gov/.

FOR FURTHER INFORMATION CONTACT: Gregory K. Price, Industry Economist, 
Division of Market Oversight, Commodity Futures Trading Commission, 
Three Lafayette Centre, 1155 21st Street, NW., Washington, DC 20581. 
Telephone: (202) 418-5515. E-mail: gprice@cftc.gov; or Susan Nathan, 
Senior Special Counsel, Division of Market Oversight, same address. 
Telephone: (202) 418-5133. E-mail: snathan@cftc.gov.

SUPPLEMENTARY INFORMATION: 

I. Introduction

    On March 16, 2009, the CFTC promulgated final rules implementing 
provisions of the CFTC Reauthorization Act of 2008 (``Reauthorization 
Act'') \1\ which subjects ECMs with significant price discovery 
contracts (``SPDCs'') to self-regulatory and reporting requirements, as 
well as certain Commission oversight authorities, with respect to those 
contracts. Among other things, these rules and rule amendments revise 
the information-submission requirements applicable to ECMs, establish 
procedures and standards by which the Commission will determine whether 
an ECM contract performs a significant price discovery function, and 
provide guidance with respect to compliance with nine statutory core 
principles applicable to ECMs with SPDCs. These rules became effective 
on April 22, 2009.
---------------------------------------------------------------------------

    \1\ 74 FR 12178 (Mar. 23, 2009); these rules became effective on 
April 22, 2009.
---------------------------------------------------------------------------

    In determining whether an ECM's contract is or is not a SPDC, the 
Commission will evaluate the contract's material liquidity, price 
linkage to other contracts, potential for arbitrage with other 
contracts traded on designated contract markets or derivatives 
transaction execution facilities, use of the ECM contract's prices to 
execute or settle other transactions, and other factors.
    In order to facilitate the Commission's identification of possible 
SPDCs, Commission rule 36.3(c)(2) requires that an ECM operating in 
reliance on section 2(h)(3) promptly notify the Commission and provide 
supporting information or data concerning any contract: (i) That 
averaged five trades per day or more over the most recent calendar 
quarter; and (ii)(A) for which the ECM sells price information 
regarding the contract to market participants or industry publications; 
or (B) whose daily closing or settlement prices on 95 percent or more 
of the days in the most recent quarter were within 2.5 percent of the 
contemporaneously determined closing, settlement, or other daily price 
of another agreement.

II. Determination of a SPDC

A. The SPDC Determination Process

    Commission rule 36.3(c)(3) establishes the procedures by which the 
Commission makes and announces its determination on whether a specific 
ECM contract serves a significant price

[[Page 52211]]

discovery function. Under those procedures, the Commission will publish 
a notice in the Federal Register that it intends to undertake a 
determination as to whether the specified agreement, contract, or 
transaction performs a significant price discovery function and to 
receive written data, views, and arguments relevant to its 
determination from the ECM and other interested persons.\2\ After 
prompt consideration of all relevant information,\3\ the Commission 
will, within a reasonable period of time after the close of the comment 
period, issue an order explaining its determination. Following the 
issuance of an order by the Commission that the ECM executes or trades 
an agreement, contract, or transaction that performs a significant 
price discovery function, the ECM must demonstrate, with respect to 
that agreement, contract, or transaction, compliance with the core 
principles under section 2(h)(7)(C) of the CEA \4\ and the applicable 
provisions of Part 36. If the Commission's order represents the first 
time it has determined that one of the ECM's contracts performs a 
significant price discovery function, the ECM must submit a written 
demonstration of its compliance with the core principles within 90 
calendar days of the date of the Commission's order. For each 
subsequent determination by the Commission that the ECM has an 
additional SPDC, the ECM must submit a written demonstration of its 
compliance with the core principles within 30 calendar days of the 
Commission's order.
---------------------------------------------------------------------------

    \2\ The Commission may commence this process on its own 
initiative or on the basis of information provided to it by an ECM 
pursuant to the notification provisions of Commission rule 
36.3(c)(2).
    \3\ Where appropriate, the Commission may choose to interview 
market participants regarding their impressions of a particular 
contract. Further, while they may not provide direct evidentiary 
support with respect to a particular contract, the Commission may 
rely for background and context on resources such as its October 
2007 Report on the Oversight of Trading on Regulated Futures 
Exchanges and Exempt Commercial Markets (``ECM Study''). https://www.cftc.gov/stellent/groups/public/@newsroom/documents/file/pr5403-07_ecmreport.pdf.
    \4\ 7 U.S.C. 2(h)(7)(C).
---------------------------------------------------------------------------

B. PG&E Citygate Financial Basis Contract

    The PGE contract is cash settled based on the difference between 
the bidweek price index for a particular calendar month at the PG&E 
Citygate hub, as published by Intelligence Press, Inc. (IPI), in NGI's 
Bidweek Survey, and the final settlement price of the New York 
Mercantile Exchange's (NYMEX's) physically-delivered Henry Hub natural 
gas futures contract for the same calendar month. The bidweek price is 
computed from fixed-price, bilateral transactions executed during the 
last five business days of a given month, where the transactions 
specify the delivery of natural gas at the PG&E hub during the 
following calendar month. The price index is computed as the volume-
weighted average of the applicable natural gas transactions. Bidweek 
prices are published on the first business day of the month in which 
the gas flows. The size of the PGE contract is 2,500 mmBtu, and the 
unit of trading is any multiple of 2,500 mmBtu. The PGE contract is 
listed for up to 72 calendar months commencing with the next calendar 
month.
    Based upon a required quarterly notification filed on July 27, 2009 
(mandatory under Rule 36.3(c)(2)), the ICE reported that, with respect 
to its PGE contract, the total number of trades was 1,142 in the second 
quarter of 2009, resulting in a daily average of 17.8 trades. During 
the same period, the PGE contract had a total trading volume of 99,418 
contracts and an average daily trading volume of 1,553.4 contracts. 
Moreover, the open interest as of June 30, 2009, was 150,299 contracts.
    It appears that the PGE contract may satisfy the material 
liquidity, price linkage, and material price reference factors for SPDC 
determination. With respect to material liquidity, trading in the ICE 
PGE contract averaged more than 1,500 contracts on a daily basis, with 
more than 15 separate transactions each day. In addition, the open 
interest in the subject contract was substantial. In regard to price 
linkage, the final settlement price of the PGE contract is based, in 
part, on the final settlement price of the NYMEX's physically-delivered 
natural gas contract, where the NYMEX is registered with the Commission 
as a designated contract market (``DCM''). In terms of material price 
reference, the ICE maintains exclusive rights over IPI's bidweek price 
indices. As a result, no other exchange can offer such a basis contract 
based on IPI's PG&E bidweek index. While other third-party price 
providers produce natural gas price indices for a variety of trading 
centers, those indices may not have the same values or quality as IPI's 
price indices; each company's bidweek indices are based on transactions 
that are consummated during the last five days of the month prior to 
delivery and are voluntarily submitted by traders. In addition, the ICE 
sells its price data to market participants in a number of different 
packages which vary in terms of the hubs covered, time periods, and 
whether the data are daily only or historical. For example, the ICE 
offers ``West Gas End of Day'' and ``OTC Gas End of Day'' data packages 
with access to all price data or just 12, 24, 36, or 48 months of 
historical data.

III. Request for Comment

    In evaluating whether an ECM's agreement, contract, or transaction 
performs a significant price discovery function, section 2(h)(7) of the 
CEA directs the Commission to consider, as appropriate, four specific 
criteria: Price linkage, arbitrage, material price reference, and 
material liquidity. As it explained in Appendix A to the Part 36 
rules,\5\ the Commission, in making SPDC determinations, will apply and 
weigh each factor, as appropriate, to the specific contract and 
circumstances under consideration.
---------------------------------------------------------------------------

    \5\ 17 CFR Part 36, Appendix A.
---------------------------------------------------------------------------

    As part of its evaluation, the Commission will consider the written 
data, views, and arguments from any ECM that lists the potential SPDC 
and from any other interested parties. Accordingly, the Commission 
requests comment on whether the ICE's PGE contract performs a 
significant price discovery function. Commenters' attention is directed 
particularly to Appendix A of the Commission's Part 36 rules for a 
detailed discussion of the factors relevant to a SPDC determination. 
The Commission notes that comments which analyze the contract in terms 
of these factors will be especially helpful to the determination 
process. In order to determine the relevance of comments received, the 
Commission requests that commenters explain in what capacity are they 
knowledgeable about the subject contract.

IV. Related Matters

A. Paperwork Reduction Act

    The Paperwork Reduction Act of 1995 (``PRA'') \6\ imposes certain 
requirements on federal agencies, including the Commission, in 
connection with their conducting or sponsoring any collection of 
information, as defined by the PRA. Certain provisions of final 
Commission rule 36.3 impose new regulatory and reporting requirements 
on ECMs, resulting in information collection requirements within the 
meaning of the PRA; OMB previously has approved and assigned OMB 
control number 3038-0060 to this collection of information.
---------------------------------------------------------------------------

    \6\ 44 U.S.C. 3507(d).

---------------------------------------------------------------------------

[[Page 52212]]

B. Cost-Benefit Analysis

    Section 15(a) of the CEA \7\ requires the Commission to consider 
the costs and benefits of its actions before issuing an order under the 
Act. By its terms, section 15(a) does not require the Commission to 
quantify the costs and benefits of such an order or to determine 
whether the benefits of such an order outweigh its costs; rather, it 
requires that the Commission ``consider'' the costs and benefits of its 
action. Section 15(a) further specifies that the costs and benefits 
shall be evaluated in light of five broad areas of market and public 
concern: (1) Protection of market participants and the public; (2) 
efficiency, competitiveness, and financial integrity of futures 
markets; (3) price discovery; (4) sound risk management practices; and 
(5) other public interest considerations.
---------------------------------------------------------------------------

    \7\ 7 U.S.C. 19(a).
---------------------------------------------------------------------------

    The bulk of the costs imposed by the requirements of Commission 
Rule 36.3 relate to significant and increased information-submission 
and reporting requirements adopted in response to the Reauthorization 
Act's directive that the Commission take an active role in determining 
whether contracts listed by ECMs qualify as SPDCs. The enhanced 
requirements for ECMs will permit the Commission to acquire the 
information it needs to discharge its newly-mandated responsibilities 
and to ensure that ECMs with SPDCs are identified as entities with the 
elevated status of registered entity under the CEA and are in 
compliance with the statutory terms of the core principles of section 
2(h)(7)(C) of the Act. The primary benefit to the public is to enable 
the Commission to discharge its statutory obligation to monitor for the 
presence of SPDCs and extend its oversight to the trading of SPDCs.

    Issued in Washington, DC, on October 5, 2009 by the Commission.
David A. Stawick,
Secretary of the Commission.
[FR Doc. E9-24390 Filed 10-8-09; 8:45 am]
BILLING CODE 6351-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.