Dillon Dam Hydroelectric Project; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 50178-50179 [E9-23517]
Download as PDF
CPrice-Sewell on DSKGBLS3C1PROD with NOTICES
50178
Federal Register / Vol. 74, No. 188 / Wednesday, September 30, 2009 / Notices
section 7(c) of the Natural Gas Act
(NGA), and Part 157 of the
Commission’s regulations for an order
granting a certificate of public
convenience to construct and operate
the new North Raton Lateral, with
appurtenances, in southern Colorado.
The project is hereafter referred to as the
Raton 2010 Expansion Project. CIG
proposes to construct approximately
118 miles of 16-inch diameter pipeline
with a total capacity of approximately
130,000 dekatherms per day, all as more
fully set forth in the application which
is on file with the Commission and open
to public inspection. The filing may also
be viewed on the Web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or TTY, contact
(202) 502–8659.
Specifically, the Raton 2010
Expansion Project consists of (i)
approximately 118.6 miles of 16-inch
diameter pipeline in Las Animas,
Huerfano, Pueblo, and El Paso Counties,
Colorado; (ii) new incremental rates
related to the cost of service on the new
lateral; and (iii) minor modifications to
existing compressor and meter stations
to allow CIG to transport the additional
volumes from the proposed expansion.
The Raton 2010 Expansion Project has
a design capacity of approximately
130,000 Dth per day subject to long-term
firm transportation agreements to move
the gas from the Raton Basin to an
interconnect with CIG’s mainline in El
Paso County, Colorado. The estimated
costs of the project are approximately
$132 million.
Any questions concerning this
application may be directed to Richard
Derryberry, Director, Regulatory Affairs,
Colorado Interstate Gas Company, P.O.
Box 1087, Colorado Springs, Colorado
80944, by phone at (719) 520–3788, or
by fax at (719) 520–4898.
On June 24, 2008 the Commission
staff granted CIG’s request to utilize the
National Environmental Policy Act
(NEPA) Pre-Filling Process and assigned
Docket No. PF08–25–000 to staff
activities involving the Raton 2010
Expansion Project. Now, as of the filing
of CIG’s application on September 10,
2009, the NEPA Pre-Filling Process for
this project has ended. From this time
forward, CIG’s proceeding will be
conducted in Docket No. CP09–464–
000, as noted in the caption of this
Notice.
Pursuant to Section 157.9 of the
Commission’s rules, 18 CFR 157.9,
VerDate Nov<24>2008
14:56 Sep 29, 2009
Jkt 217001
within 90 days of this Notice the
Commission staff will either: complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
Federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
14 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 14 copies of the protest or
intervention to the Federal Energy
regulatory Commission, 888 First Street,
NE., Washington, DC 20426.
Comment Date: October 14, 2009.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–23518 Filed 9–29–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13421–000]
Dillon Dam Hydroelectric Project;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
September 23, 2009.
On April 2, 2009, Muskingum Valley
Hydro (Muskingum) filed an
application, pursuant to section 4(f) of
the Federal Power Act, proposing to
study the feasibility of developing the
Dillon Dam Hydroelectric Project, to be
located on the Licking River in
Muskingum County, near Zanesville,
Ohio. The proposed project would be
located at the U.S. Army Corps of
Engineers Dillon Dam consisting of the
existing 1,560-acre impoundment with a
normal water surface elevation of 735
feet mean sea level.
The proposed project would consist
of: (1) A new powerhouse to be located
on the downstream side of Dillon dam
E:\FR\FM\30SEN1.SGM
30SEN1
Federal Register / Vol. 74, No. 188 / Wednesday, September 30, 2009 / Notices
below the outlet works; (2) a new 50foot-long, 96-inch penstock; (3) a new
turbine generator unit with an installed
capacity of 1.59 MW; and (4) a new 300foot-long, 14.7-kV transmission line.
The project would have an estimated
average annual generation of 9,700
megawatt-hours. Muskingum states that
it will investigate various other types of
hydroelectric generation at the site
including Very Low Head Turbine
technology.
Applicant Contact: Randall Smith,
Muskingum Valley Hydro, 4950
Frazeysburg Road, Zanesville, Ohio
43701 (740) 891–5424.
FERC Contact: Patrick Murphy, (202)
502–8755.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of the Commission’s
Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–13421) in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–23517 Filed 9–29–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
CPrice-Sewell on DSKGBLS3C1PROD with NOTICES
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
September 23, 2009.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER07–509–002.
Applicants: California Power
Holdings, LLC.
VerDate Nov<24>2008
14:56 Sep 29, 2009
Jkt 217001
Description: California Power
Holdings, LLC submits revised
amendment to market based rate tariff.
Filed Date: 09/18/2009.
Accession Number: 20090922–0066.
Comment Date: 5 p.m. Eastern Time
on Friday, October 09, 2009.
Docket Numbers: ER09–32–004.
Applicants: Barton Windpower LLC.
Description: Notice of Non-Material
Change in Status of Barton Windpower
LLC.
Filed Date: 09/23/2009.
Accession Number: 20090923–5048.
Comment Date: 5 p.m. Eastern Time
on Wednesday, October 14, 2009.
Docket Numbers: ER09–1479–001.
Applicants: Kansas Energy LLC.
Description: Kansas Energy LLC
submits its amended Petition.
Filed Date: 09/21/2009.
Accession Number: 20090922–0070.
Comment Date: 5 p.m. Eastern Time
on Tuesday, October 13, 2009.
Docket Numbers: ER09–1643–001.
Applicants: E.ON U.S., LLC.
Description: Louisville Gas and
Electric Co et al. submits Substitute
First Revised Sheet 104 et al. to FERC
Electric Tariff, Fourth Revised Volume
1.
Filed Date: 09/21/2009.
Accession Number: 20090922–0036.
Comment Date: 5 p.m. Eastern Time
on Tuesday, October 13, 2009.
Docket Numbers: ER09–1677–001.
Applicants: Big Sky Wind, LLC.
Description: Big Sky Wind, LLC
submits Sub. Original Sheet 3 to its
proposed tariff to correct an inadvertent
error in the tariff submitted on Sept. 3.
Filed Date: 09/21/2009.
Accession Number: 20090922–0071.
Comment Date: 5 p.m. Eastern Time
on Tuesday, October 13, 2009.
Docket Numbers: ER09–1711–000.
Applicants: California Independent
System Operator Corporation.
Description: California Independent
System Operator Corporation submits
an informational filing that is intended
to provide notice re the ISO’s revised
transmission access charges effective 5/
1/09.
Filed Date: 09/15/2009.
Accession Number: 20090916–0092.
Comment Date: 5 p.m. Eastern Time
on Tuesday, October 06, 2009.
Docket Numbers: ER09–1723–000.
Applicants: Dry Lake Wind Power,
LLC.
Description: Application of Dry Lake
Wind Power, LLC for order accepting
initial tariff, Waiving 60 day prior notice
requirement and granting Blanket
Approvals etc.
Filed Date: 09/22/2009.
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
50179
Accession Number: 20090923–0008.
Comment Date: 5 p.m. Eastern Time
on Tuesday, October 13, 2009.
Docket Numbers: ER09–1724–000.
Applicants: Cleco Power LLC.
Description: Cleco Power, LLC
submits an amendment to the Electric
System Interconnection Agreement with
Southwestern Electric Power Co.
Filed Date: 09/21/2009.
Accession Number: 20090922–0037.
Comment Date: 5 p.m. Eastern Time
on Tuesday, October 13, 2009.
Docket Numbers: ER09–1726–000.
Applicants: ALLETE, Inc.
Description: Allete, Inc submits
Schedule 2 to its Open Access
Transmission Tariff in order to govern
the provision of reactive power and
voltage support over certain highvoltage direct-current transmission
facilities etc.
Filed Date: 09/21/2009.
Accession Number: 20090922–0072.
Comment Date: 5 p.m. Eastern Time
on Tuesday, October 13, 2009.
Docket Numbers: ER09–1727–000.
Applicants: Midwest Independent
Transmission System Operator, Inc.;
ALLETE, Inc.
Description: Midwest Independent
Transmission System Operator, Inc. et
al. submits agency agreement and
revisions to the Midwest ISO’s open
access transmission, energy and
operating reserve markets tariff.
Filed Date: 09/21/2009.
Accession Number: 20090922–0073.
Comment Date: 5 p.m. Eastern Time
on Tuesday, October 13, 2009.
Docket Numbers: ER09–1728–000.
Applicants: ALLETE, Inc.
Description: Allete, Inc. submits
Interconnection and Operating
Agreement.
Filed Date: 09/21/2009.
Accession Number: 20090922–0068.
Comment Date: 5 p.m. Eastern Time
on Tuesday, October 13, 2009.
Docket Numbers: ER09–1732–000.
Applicants: Southwest Power Pool,
Inc.
Description: Southwest Power Pool,
Inc. submits Original Service Agreement
1806 to FERC Electric Tariff, Fifth
Revised Volume 1.
Filed Date: 09/22/2009.
Accession Number: 20090923–0007.
Comment Date: 5 p.m. Eastern Time
on Tuesday, October 13, 2009.
Docket Numbers: ER09–1733–000.
Applicants: Southwest Power Pool,
Inc.
Description: Southwest Power Pool,
Inc. submits revisions to an executed
Meter Agent Services Agreement
between Dodwood Energy, LLC as the
E:\FR\FM\30SEN1.SGM
30SEN1
Agencies
[Federal Register Volume 74, Number 188 (Wednesday, September 30, 2009)]
[Notices]
[Pages 50178-50179]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-23517]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13421-000]
Dillon Dam Hydroelectric Project; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
September 23, 2009.
On April 2, 2009, Muskingum Valley Hydro (Muskingum) filed an
application, pursuant to section 4(f) of the Federal Power Act,
proposing to study the feasibility of developing the Dillon Dam
Hydroelectric Project, to be located on the Licking River in Muskingum
County, near Zanesville, Ohio. The proposed project would be located at
the U.S. Army Corps of Engineers Dillon Dam consisting of the existing
1,560-acre impoundment with a normal water surface elevation of 735
feet mean sea level.
The proposed project would consist of: (1) A new powerhouse to be
located on the downstream side of Dillon dam
[[Page 50179]]
below the outlet works; (2) a new 50-foot-long, 96-inch penstock; (3) a
new turbine generator unit with an installed capacity of 1.59 MW; and
(4) a new 300-foot-long, 14.7-kV transmission line. The project would
have an estimated average annual generation of 9,700 megawatt-hours.
Muskingum states that it will investigate various other types of
hydroelectric generation at the site including Very Low Head Turbine
technology.
Applicant Contact: Randall Smith, Muskingum Valley Hydro, 4950
Frazeysburg Road, Zanesville, Ohio 43701 (740) 891-5424.
FERC Contact: Patrick Murphy, (202) 502-8755.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Comments, motions to intervene, notices of intent, and competing
applications may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and eight
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For
more information on how to submit these types of filings please go to
the Commission's Web site located at https://www.ferc.gov/filing-comments.asp. More information about this project can be viewed or
printed on the ``eLibrary'' link of the Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-
13421) in the docket number field to access the document. For
assistance, call toll-free 1-866-208-3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-23517 Filed 9-29-09; 8:45 am]