Download as PDF srobinson on DSKHWCL6B1PROD with NOTICES 49372 Federal Register / Vol. 74, No. 186 / Monday, September 28, 2009 / Notices Filed Date: 09/15/2009. Accession Number: 20090917–0006. Comment Date: 5 p.m. Eastern Time on Tuesday, October 06, 2009. Docket Numbers: ER09–1431–000. Applicants: Midwest Independent Transmission System Operator, Inc. Description: The Midwest Independent Transmission System Operator, Inc submits response to the Commission’s letter dated 9/2/09 seeking additional information. Filed Date: 09/17/2009. Accession Number: 20090918–0091. Comment Date: 5 p.m. Eastern Time on Thursday, September 24, 2009. Docket Numbers: ER09–1710–000. Applicants: KEB Trading LLC. Description: KEB Trading LLC submits application for Market-Based Rate Authorization and Request for Waivers and Blanket Authorizations and Request for Expedited Treatment. Filed Date: 09/17/2009. Accession Number: 20090917–0070. Comment Date: 5 p.m. Eastern Time on Thursday, October 08, 2009. Docket Numbers: ER09–1713–000. Applicants: PJM Interconnection, L.L.C. Description: PJM Interconnection, LLC submits two executed interconnection service agreements among PJM, Commonwealth Edison Company, Blackstone Wind Farm, LLC, et al. Filed Date: 09/16/2009. Accession Number: 20090917–0073. Comment Date: 5 p.m. Eastern Time on Wednesday, October 07, 2009. Docket Numbers: ER09–1714–000. Applicants: Southwest Power Pool, Inc. Description: Southwest Power Pool, Inc (SPP) submits executed Large Generator Interconnection Agreement among SPP, Elk City Wind, et al. Filed Date: 09/16/2009. Accession Number: 20090917–0072. Comment Date: 5 p.m. Eastern Time on Wednesday, October 07, 2009. Docket Numbers: ER09–1715–000; ER09–1715–001. Applicants: Employers’ Energy Alliance of Pennsylvania. Description: The Energy Cooperative of Pennsylvania, Inc (EEA–PA) notifies the Commission of the name change of The Energy Cooperative of Pennsylvania, Inc. to reflect EEA–PA’s rate schedule. Filed Date: 09/17/2009. Accession Number: 20090917–0069. Comment Date: 5 p.m. Eastern Time on Thursday, October 08, 2009. Take notice that the Commission received the following open access transmission tariff filings: VerDate Nov<24>2008 16:33 Sep 25, 2009 Jkt 217001 Docket Numbers: OA07–100–001. Applicants: Black Hills Power, Inc. Description: Black Hills Power, Inc submits Third Revised Sheet 147 et al to FERC Electric Tariff, Second Substitute First Revised Volume 4, Order 890 Attachment C compliance filing. Filed Date: 09/14/2009. Accession Number: 20090917–0005. Comment Date: 5 p.m. Eastern Time on Monday, October 05, 2009. Any person desiring to intervene or to protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. It is not necessary to separately intervene again in a subdocket related to a compliance filing if you have previously intervened in the same docket. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. In reference to filings initiating a new proceeding, interventions or protests submitted on or before the comment deadline need not be served on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St. NE., Washington, DC 20426. The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed dockets(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov. or call PO 00000 Frm 00013 Fmt 4703 Sfmt 4703 (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. E9–23349 Filed 9–25–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 September 22, 2009. Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC09–103–000. Applicants: Dynegy Arlington Valley, LLC, Dynegy Inc., Dynegy Midwest Generation, Inc., Bluegrass Generation Company, L.L.C., Renaissance Power, L.L.C, Griffith Energy LLC, Rocky Road Power, LLC, Riverside Generating Company, LLC, Bridgeport Energy, LLC, LS Power Development, LLC, Tilton Energy LLC. Description: Supplemental Information Clarifying Application for Approval under Section 203 of Federal Power Act of LS Power Development, LLC, et. al. Filed Date: 09/21/2009. Accession Number: 20090921–5078. Comment Date: 5 p.m. Eastern Time on Thursday, October 01, 2009. Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG09–94–000. Applicants: Dry Lake Wind Power, LLC. Description: Notice of SelfCertification of Exempt Wholesale Generator Status of Dry Lake Wind Power, LLC. Filed Date: 09/22/2009. Accession Number: 20090922–5046. Comment Date: 5 p.m. Eastern Time on Tuesday, October 13, 2009. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER98–1643–015. Applicants: Portland General Electric Company. Description: Portland General Electric Company Notification of Non-Material Change in Status. Filed Date: 09/21/2009. Accession Number: 20090921–5107. Comment Date: 5 p.m. Eastern Time on Tuesday, October 13, 2009. Docket Numbers: ER08–378–002; ER03–1085–007; ER05–1398–004; ER06–1257–003; ER07–426–003; ER09– E:\FR\FM\28SEN1.SGM 28SEN1 srobinson on DSKHWCL6B1PROD with NOTICES Federal Register / Vol. 74, No. 186 / Monday, September 28, 2009 / Notices 1028–002; ER09–560–001; ER09–826– 001. Applicants: Covanta Hempstead Company Covanta Union, Inc.; Covanta Niagara, L.P.; Covanta Essex Company; Covanta Delaware Valley, L.P.; Covanta Delano, Inc.; Covanta Maine, LLC; Michigan Waste Energy, Inc. Description: Covanta MBR Entities submits notice of non material change is status. Filed Date: 09/18/2009. Accession Number: 20090921–0121. Comment Date: 5 p.m. Eastern Time on Friday, October 09, 2009. Docket Numbers: ER08–394–024. Applicants: Midwest Independent Transmission System Operator, Inc. Description: Midwest Independent Transmission System Operator, Inc submits a compliance filing addressing congestion that may limit aggregate deliverability of Planning Resources etc. Filed Date: 08/18/2009. Accession Number: 20090819–0624. Comment Date: 5 p.m. Eastern Time on Friday, October 02, 2009. Docket Numbers: ER08–1317–005; ER09–1722–000. Applicants: California Independent System Operator Corporation. Description: California Independent System Operator Corporation submits amendment to the ISO tariff provisions on generator interconnection process reform. Filed Date: 09/18/2009. Accession Number: 20090921–0123. Comment Date: 5 p.m. Eastern Time on Friday, October 09, 2009. Docket Numbers: ER09–1312–001; ER09–1313–001. Applicants: Riverside Energy Center, LLC; RockGen Energy, LLC. Description: Riverside Energy Center, LLC et al submits settlement materials. Filed Date: 09/18/2009. Accession Number: 20090921–0120. Comment Date: 5 p.m. Eastern Time on Friday, October 09, 2009. Docket Numbers: ER09–1645–001. Applicants: Devonshire Energy LLC. Description: Devonshire Energy LLC submits amended and restated application for authorization to make wholesale sales of energy and capacity at negotiated, market based rates. Filed Date: 09/21/2009. Accession Number: 20090921–0133. Comment Date: 5 p.m. Eastern Time on Tuesday, October 13, 2009. Take notice that the Commission received the following open access transmission tariff filings: Docket Numbers: OA08–81–001. Applicants: NorthWestern Corporation. VerDate Nov<24>2008 16:33 Sep 25, 2009 Jkt 217001 49373 Description: NorthWestern Corporations submits Substitute First Revised Sheet 15 et al to its FERC Electric Tariff, Second Revised Volume 2. Filed Date: 09/18/2009. Accession Number: 20090921–0122. Comment Date: 5 p.m. Eastern Time on Friday, October 09, 2009. (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Any person desiring to intervene or to protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. It is not necessary to separately intervene again in a subdocket related to a compliance filing if you have previously intervened in the same docket. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. In reference to filings initiating a new proceeding, interventions or protests submitted on or before the comment deadline need not be served on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St., NE., Washington, DC 20426. The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed dockets(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov. or call Federal Energy Regulatory Commission PO 00000 Frm 00014 Fmt 4703 Sfmt 4703 Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. E9–23347 Filed 9–25–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY [Docket No. EL09–73–000] Californians for Renewable Energy, Inc. (CARE), Complainant v. Pacific Gas and Electric Company (PG&E) and California Energy Commission (CEC), Respondents; Notice of Complaint September 18, 2009. Take notice that on September 8, 2009, pursuant to sections 206 and 212 of the Rules and Practice and Procedure, 18 CFR 385.206 and 385.212 and sections 205 and 306 of the Federal Power Act, 16 U.S.C. 824(e) and 825(e), CAlifornians for Renewable Energy, Inc. (CARE) (Complainant) filed a formal complaint against Pacific Gas and Electric Company (Respondents) for operating its Gateway Generating Station without permits that limit emissions regulated by the Clean Air Act and the California Energy Commission (CEC). The Complainant states that a copy of the complaint has been served upon Respondents and CEC and other interested parties. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondent’s answer and all interventions, or protests must be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. E:\FR\FM\28SEN1.SGM 28SEN1

Agencies

[Federal Register Volume 74, Number 186 (Monday, September 28, 2009)]
[Notices]
[Pages 49372-49373]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-23347]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings 1

September 22, 2009.
    Take notice that the Commission received the following electric 
corporate filings:

    Docket Numbers: EC09-103-000.
    Applicants: Dynegy Arlington Valley, LLC, Dynegy Inc., Dynegy 
Midwest Generation, Inc., Bluegrass Generation Company, L.L.C., 
Renaissance Power, L.L.C, Griffith Energy LLC, Rocky Road Power, LLC, 
Riverside Generating Company, LLC, Bridgeport Energy, LLC, LS Power 
Development, LLC, Tilton Energy LLC.
    Description: Supplemental Information Clarifying Application for 
Approval under Section 203 of Federal Power Act of LS Power 
Development, LLC, et. al.
    Filed Date: 09/21/2009.
    Accession Number: 20090921-5078.
    Comment Date: 5 p.m. Eastern Time on Thursday, October 01, 2009.

    Take notice that the Commission received the following exempt 
wholesale generator filings:

    Docket Numbers: EG09-94-000.
    Applicants: Dry Lake Wind Power, LLC.
    Description: Notice of Self-Certification of Exempt Wholesale 
Generator Status of Dry Lake Wind Power, LLC.
    Filed Date: 09/22/2009.
    Accession Number: 20090922-5046.
    Comment Date: 5 p.m. Eastern Time on Tuesday, October 13, 2009.

    Take notice that the Commission received the following electric 
rate filings:

    Docket Numbers: ER98-1643-015.
    Applicants: Portland General Electric Company.
    Description: Portland General Electric Company Notification of Non-
Material Change in Status.
    Filed Date: 09/21/2009.
    Accession Number: 20090921-5107.
    Comment Date: 5 p.m. Eastern Time on Tuesday, October 13, 2009.

    Docket Numbers: ER08-378-002; ER03-1085-007; ER05-1398-004; ER06-
1257-003; ER07-426-003; ER09-

[[Page 49373]]

1028-002; ER09-560-001; ER09-826-001.
    Applicants: Covanta Hempstead Company Covanta Union, Inc.; Covanta 
Niagara, L.P.; Covanta Essex Company; Covanta Delaware Valley, L.P.; 
Covanta Delano, Inc.; Covanta Maine, LLC; Michigan Waste Energy, Inc.
    Description: Covanta MBR Entities submits notice of non material 
change is status.
    Filed Date: 09/18/2009.
    Accession Number: 20090921-0121.
    Comment Date: 5 p.m. Eastern Time on Friday, October 09, 2009.

    Docket Numbers: ER08-394-024.
    Applicants: Midwest Independent Transmission System Operator, Inc.
    Description: Midwest Independent Transmission System Operator, Inc 
submits a compliance filing addressing congestion that may limit 
aggregate deliverability of Planning Resources etc.
    Filed Date: 08/18/2009.
    Accession Number: 20090819-0624.
    Comment Date: 5 p.m. Eastern Time on Friday, October 02, 2009.

    Docket Numbers: ER08-1317-005; ER09-1722-000.
    Applicants: California Independent System Operator Corporation.
    Description: California Independent System Operator Corporation 
submits amendment to the ISO tariff provisions on generator 
interconnection process reform.
    Filed Date: 09/18/2009.
    Accession Number: 20090921-0123.
    Comment Date: 5 p.m. Eastern Time on Friday, October 09, 2009.

    Docket Numbers: ER09-1312-001; ER09-1313-001.
    Applicants: Riverside Energy Center, LLC; RockGen Energy, LLC.
    Description: Riverside Energy Center, LLC et al submits settlement 
materials.
    Filed Date: 09/18/2009.
    Accession Number: 20090921-0120.
    Comment Date: 5 p.m. Eastern Time on Friday, October 09, 2009.

    Docket Numbers: ER09-1645-001.
    Applicants: Devonshire Energy LLC.
    Description: Devonshire Energy LLC submits amended and restated 
application for authorization to make wholesale sales of energy and 
capacity at negotiated, market based rates.
    Filed Date: 09/21/2009.
    Accession Number: 20090921-0133.
    Comment Date: 5 p.m. Eastern Time on Tuesday, October 13, 2009.

    Take notice that the Commission received the following open access 
transmission tariff filings:

    Docket Numbers: OA08-81-001.
    Applicants: NorthWestern Corporation.
    Description: NorthWestern Corporations submits Substitute First 
Revised Sheet 15 et al to its FERC Electric Tariff, Second Revised 
Volume 2.
    Filed Date: 09/18/2009.
    Accession Number: 20090921-0122.
    Comment Date: 5 p.m. Eastern Time on Friday, October 09, 2009.

    Any person desiring to intervene or to protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Rules of Practice and Procedure (18 CFR 385.211 and 
385.214) on or before 5 p.m. Eastern time on the specified comment 
date. It is not necessary to separately intervene again in a subdocket 
related to a compliance filing if you have previously intervened in the 
same docket. Protests will be considered by the Commission in 
determining the appropriate action to be taken, but will not serve to 
make protestants parties to the proceeding. Anyone filing a motion to 
intervene or protest must serve a copy of that document on the 
Applicant. In reference to filings initiating a new proceeding, 
interventions or protests submitted on or before the comment deadline 
need not be served on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper, using the FERC Online links at https://www.ferc.gov. To facilitate electronic service, persons with Internet 
access who will eFile a document and/or be listed as a contact for an 
intervenor must create and validate an eRegistration account using the 
eRegistration link. Select the eFiling link to log on and submit the 
intervention or protests.
    Persons unable to file electronically should submit an original and 
14 copies of the intervention or protest to the Federal Energy 
Regulatory Commission, 888 First St., NE., Washington, DC 20426.
    The filings in the above proceedings are accessible in the 
Commission's eLibrary system by clicking on the appropriate link in the 
above list. They are also available for review in the Commission's 
Public Reference Room in Washington, DC. There is an eSubscription link 
on the Web site that enables subscribers to receive e-mail notification 
when a document is added to a subscribed dockets(s). For assistance 
with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov. 
or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.

Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E9-23347 Filed 9-25-09; 8:45 am]
BILLING CODE 6717-01-P