Clayton Silver Mines, Inc.; Notice of Petition for Declaratory Order and Soliciting Comments, Protests, and/or Motions To Intervene, 49376 [E9-23284]

Download as PDF 49376 Federal Register / Vol. 74, No. 186 / Monday, September 28, 2009 / Notices Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on October 6, 2009. Kimberly D. Bose, Secretary. [FR Doc. E9–23282 Filed 9–25–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. DI09–13–000] Clayton Silver Mines, Inc.; Notice of Petition for Declaratory Order and Soliciting Comments, Protests, and/or Motions To Intervene srobinson on DSKHWCL6B1PROD with NOTICES September 18, 2009. Take notice that the following application has been filed with the Commission and is available for public inspection: a. Application Type: Petition for Declaratory Order. b. Docket No: DI09–13–000. c. Date Filed: September 2, 2009. d. Applicant: Clayton Silver Mines, Inc. e. Name of Project: Clayton Silver Mine Hydro Project. f. Location: The Clayton Silver Mine Hydro Project is located on Kinnikinic Creek, near Clayton, in Custer County, Idaho, affecting T. 11 N, R. 17 E, sec. 13, Boise Meridian. g. Filed Pursuant to: Section 23(b)(1) of the Federal Power Act, 16 U.S.C. 817(b). h. Applicant Contact: Robert B. Corrigan, 59 N. Sierra View Way, Eagle, ID 83622; telephone: (208) 761–8492; Fax: (208) 938–0193; e-mail: www.ppaidco@msn.com. i. FERC Contact: Any questions on this notice should be addressed to Henry Ecton, (202) 502–8768, or E-mail address: henry.ecton@ferc.gov. j. Deadline for filing comments, protests, and/or motions: October 19, 2009. All documents (original and eight copies) should be filed with: Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, D.C. 20426. Comments, protests, and/or interventions may be filed electronically via the Internet in lieu of paper. Any questions, please contact the Secretary’s VerDate Nov<24>2008 16:33 Sep 25, 2009 Jkt 217001 Office. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https:// www.ferc.gov under the ‘‘e-Filing link. Please include the docket number (DI09–13–000) on any comments, protests, and/or motions filed. k. Description of Project: The Clayton Silver Mines Hydro project consists of: (1) A powerhouse containing a 600-kW Pelton wheel and generator; (2) an 18inch-diameter, 9,500-foot-long penstock; (3) a 15-foot-long tailrace, emptying into Kinnikinic Creek; and (4) appurtenant facilities. The proposed project will be connected to an interstate grid. The project will not occupy federal lands. When a Petition for Declaratory Order is filed with the Federal Energy Regulatory Commission, the Federal Power Act requires the Commission to investigate and determine if the interests of interstate or foreign commerce would be affected by the project. The Commission also determines whether or not the project: (1) Would be located on a navigable waterway; (2) would occupy or affect public lands or reservations of the United States; (3) would utilize surplus water or water power from a government dam; or (4) if applicable, has involved or would involve any construction subsequent to 1935 that may have increased or would increase the project’s head or generating capacity, or have otherwise significantly modified the project’s pre-1935 design or operation. l. Locations of the Application: Copies of this filing are on file with the Commission and are available for public inspection. This filing may be viewed on the Web at https://www.ferc.gov using the ‘‘eLibrary’’ link, select ‘‘Docket#’’ and follow the instructions. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3372, or TTY, contact (202) 502–8659. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents — Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTESTS’’, AND/OR ‘‘MOTIONS TO INTERVENE’’, as applicable, and the Docket Number of the particular application to which the filing refers. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. p. Agency Comments—Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Kimberly D. Bose, Secretary. [FR Doc. E9–23284 Filed 9–25–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AD09–10–000] National Action Plan on Demand Response; Notice of Technical Conferences September 18, 2009. Take notice that Commission Staff will hold two technical conferences to support the development of the National Action Plan on Demand Response. The first technical conference will take place on October 22, 2009, from 9 a.m. to 5 p.m. Eastern Time in the Commission Meeting Room at the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. The second technical conference will take place on October 27, 2009, from 9 a.m. to 5 p.m. Pacific Time in Portland, OR. Commissioners may attend. The conferences will be open to the public, and all interested persons are invited to participate. For logistical purposes, staff requests those planning to attend preregister via an electronic form: for Washington, https://www.ferc.gov/ whats-new/registration/nap-10–22form.asp; for Portland, https:// www.ferc.gov/whats-new/registration/ nap-10–27-form.asp. Advance registration is not required to participate. E:\FR\FM\28SEN1.SGM 28SEN1

Agencies

[Federal Register Volume 74, Number 186 (Monday, September 28, 2009)]
[Notices]
[Page 49376]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-23284]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. DI09-13-000]


Clayton Silver Mines, Inc.; Notice of Petition for Declaratory 
Order and Soliciting Comments, Protests, and/or Motions To Intervene

September 18, 2009.
    Take notice that the following application has been filed with the 
Commission and is available for public inspection:
    a. Application Type: Petition for Declaratory Order.
    b. Docket No: DI09-13-000.
    c. Date Filed: September 2, 2009.
    d. Applicant: Clayton Silver Mines, Inc.
    e. Name of Project: Clayton Silver Mine Hydro Project.
    f. Location: The Clayton Silver Mine Hydro Project is located on 
Kinnikinic Creek, near Clayton, in Custer County, Idaho, affecting T. 
11 N, R. 17 E, sec. 13, Boise Meridian.
    g. Filed Pursuant to: Section 23(b)(1) of the Federal Power Act, 16 
U.S.C. 817(b).
    h. Applicant Contact: Robert B. Corrigan, 59 N. Sierra View Way, 
Eagle, ID 83622; telephone: (208) 761-8492; Fax: (208) 938-0193; e-
mail: www.ppaidco@msn.com.
    i. FERC Contact: Any questions on this notice should be addressed 
to Henry Ecton, (202) 502-8768, or E-mail address: 
henry.ecton@ferc.gov.
    j. Deadline for filing comments, protests, and/or motions: October 
19, 2009.
    All documents (original and eight copies) should be filed with: 
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., 
Washington, D.C. 20426. Comments, protests, and/or interventions may be 
filed electronically via the Internet in lieu of paper. Any questions, 
please contact the Secretary's Office. See, 18 CFR 385.2001(a)(1)(iii) 
and the instructions on the Commission's Web site at https://www.ferc.gov under the ``e-Filing link.
    Please include the docket number (DI09-13-000) on any comments, 
protests, and/or motions filed.
    k. Description of Project: The Clayton Silver Mines Hydro project 
consists of: (1) A powerhouse containing a 600-kW Pelton wheel and 
generator; (2) an 18-inch-diameter, 9,500-foot-long penstock; (3) a 15-
foot-long tailrace, emptying into Kinnikinic Creek; and (4) appurtenant 
facilities. The proposed project will be connected to an interstate 
grid. The project will not occupy federal lands.
    When a Petition for Declaratory Order is filed with the Federal 
Energy Regulatory Commission, the Federal Power Act requires the 
Commission to investigate and determine if the interests of interstate 
or foreign commerce would be affected by the project. The Commission 
also determines whether or not the project: (1) Would be located on a 
navigable waterway; (2) would occupy or affect public lands or 
reservations of the United States; (3) would utilize surplus water or 
water power from a government dam; or (4) if applicable, has involved 
or would involve any construction subsequent to 1935 that may have 
increased or would increase the project's head or generating capacity, 
or have otherwise significantly modified the project's pre-1935 design 
or operation.
    l. Locations of the Application: Copies of this filing are on file 
with the Commission and are available for public inspection. This 
filing may be viewed on the Web at https://www.ferc.gov using the 
``eLibrary'' link, select ``Docket'' and follow the 
instructions. For assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov or toll-free at (866) 208-3372, or TTY, 
contact (202) 502-8659.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene--Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents -- Any filings must 
bear in all capital letters the title ``COMMENTS'', ``PROTESTS'', AND/
OR ``MOTIONS TO INTERVENE'', as applicable, and the Docket Number of 
the particular application to which the filing refers. A copy of any 
motion to intervene must also be served upon each representative of the 
Applicant specified in the particular application.
    p. Agency Comments--Federal, state, and local agencies are invited 
to file comments on the described application. A copy of the 
application may be obtained by agencies directly from the Applicant. If 
an agency does not file comments within the time specified for filing 
comments, it will be presumed to have no comments. One copy of an 
agency's comments must also be sent to the Applicant's representatives.

Kimberly D. Bose,
Secretary.
[FR Doc. E9-23284 Filed 9-25-09; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.