Environmental Impacts Statements; Notice of Availability, 48951 [E9-23228]
Download as PDF
Federal Register / Vol. 74, No. 185 / Friday, September 25, 2009 / Notices
information on these issues, additional
mitigation, financial assurance for
reclamation and post-closure
monitoring. Rating EC2.
Final EISs
EIS No. 20090206, ERP No. F–NOA–
E91026–00, Programmatic EIS—
Fishery Management Plan for
Regulating Offshore Marine
Aquaculture in the Gulf of Mexico, To
Increase the Maximum Sustainable
Yield (MSY) and Optimum Yield
(OY), Implementation.
Summary: EPA expressed
environmental concern about the
potential for excess nutrients to cause
organic loading within the water
column.
EIS No. 20090228, ERP No. F–CGD–
E03019–FL, Port Dolphin LLC
Liquefied Natural Gas Deepwater Port
License Application, Proposes to
Own, Construct and Operate a
Deepwater Port, Outer Continental
Shelf, Manatee County, FL.
Summary: EPA does not object to the
proposed action.
Dated: September 22, 2009.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E9–23227 Filed 9–24–09; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8597–6]
jlentini on DSKJ8SOYB1PROD with NOTICES
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–1399 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 09/14/2009 through 09/18/2009.
Pursuant to 40 CFR 1506.9.
EIS No. 20090324, Draft EIS, AFS, 00,
Nebraska National Forests and
Grassland Travel Management Project,
Proposes to Designate Routes and
Areas Open to Motorized Travel,
Buffalo Gap National Grassland,
Oglala National Grassland, Samuel R.
McKelvie National Forest, and the
Pine Ridge and Bessey Units of the
Nebraska National Forest, Fall River,
Custer, Pennington, Jackson Counties;
SD and Sioux, Dawes, Cherry,
Thomas and Blaine Counties, NE,
Comment Period Ends: 11/09/2009,
Contact: Mark Reichert, 530–841–
4422.
VerDate Nov<24>2008
18:52 Sep 24, 2009
Jkt 217001
EIS No. 20090325, Draft EIS, NHT, 00,
Corporate Average Fuel Economy
´
(CAFE) Standards Passenger Car and
Light Trucks Model Years 2012–2016,
To Reduce National Energy
Consumption by Increasing the Fuel
Economy of Passenger Car and Light
Trucks sold in the United States,
Implementation, Comment Period
Ends: 11/09/2009, Contact: Jessica GT
Wilson, 202–366–0176.
EIS No. 20090326, Final EIS, USN, FL,
Naval Surface Warfare Center Panama
City Division (NSWC PCD),
Capabilities to Conduct New and
Increased Mission Operations for the
Department of Navy (DON) and
Customers within the three Military
Operating Area and St. Andrew Bay
(SAB), Gulf of Mexico, FL, Wait
Period Ends: 10/26/2009, Contact:
Carmen Ferrer, 850–234–4146.
EIS No. 20090327, Final EIS, STB, AK,
Northern Rail Extension Project,
Construct and Operate a Rail Line
between North Pole and Delta
Junction, AK, Wait Period Ends: 10/
26/2009, Contact: Dave Navecky, 202–
245–0294.
EIS No. 20090328, Final EIS, FRC, 00,
Phase VIII Expansion Project,
Proposed to Construct, Own, Operate,
and Maintain New Interstate National
Gas Pipeline, Compressor, and
Ancillary Facilities in Alabama and
Florida, Wait Period Ends: 10/26/
2009, Contact: Julia Bovey 1–866–
208–3372.
EIS No. 20090329, Draft EIS, DOE, KS,
Abengoa Biorefinery Project, To
Support the Design, Construction, and
Startup of a Commercial-Scale
Integrated Biorefinery, Federal
Funding, Located near the City
Hugoton, Stevens County, KS,
Comment Period Ends: 11/09/2009,
Contact: Kristin Kerwin, 303–275–
4968.
EIS No. 20090330, Draft EIS, USN, CA,
Marine Corps Base Camp Pendleton
Basewide Utilities Infrastructure
Construct and Operate Six Utility
Infrastructure Project, San Diego
County, CA, Comment Period Ends:
11/09/2009, Contact: Jesse Martinez,
619–532–3844.
EIS No. 20090331, Final EIS, COE, CA,
San Pedro Waterfront Project,
Proposed Specific Development
Project and Associated Infrastructure
Improvements on Approximately 400
Acres, Currently Operated by Los
Angeles Harbor Department (LAHD),
Located along the West Side of Los
Angeles Harbor’s Main Channel, from
the Vincent Thomas Bridge to Cabrillo
Beach, US Army Section 10 and 404
and Section 103 Marine Protection,
Research, and Sanctuaries Act
PO 00000
Frm 00051
Fmt 4703
Sfmt 4703
48951
Permits, (MPRSA) City of Los
Angeles, CA, Wait Period Ends: 10/
26/2009, Contact: Dr. Spencer D.
MacNeil, 805–585–2152.
Amended Notices
EIS No. 20090267, Draft EIS, AFS, MT,
Bitterroot National Forest Travel
Management Planning, To Address
Conflicts between Motorized and
Non-Motorized Users, Ravalli County,
MT, Comment Period Ends: 11/09/
2009, Contact: Dan Ritter, 406–777–
5461. Revision to FR Notice Published
08/07/2009: Extending Comment
Period from 09/21/2009 to 11/09/
2009.
EIS No. 20090272, Draft EIS, UAF, 00,
Modification of the Condor 1 and
Condor 2 Military Operation Areas,
104th Fighter Wing of the
Massachusetts Air National Guard
Base (ANG) Proposes to Combine the
Condor 1 and Condor 2 MOA, ME and
NH, Comment Period Ends: 01/01/
2010, Contact: Jay Nash, 703–614–
0346. Revision to FR Notice Published
08/07/2009: Extending Comment
Period from 09/21/2009 to 11/09/
2009.
EIS No. 20090277, Draft EIS, AFS, CO,
Hermosa Park/Mitchell Lakes Land
Exchange Project, Proposed Land
Exchange between Federal and NonFederal Lands, Implementation,
Federal Land in LaPlata County and
Non-Federal Land in San Juan
County, CO, Comment Period Ends:
10/30/2009, Contact: Cindy
Hockelberg, 970–884–1418. Revision
to Federal Register Notice Published
08/17/2009: Extending Comment
Period from 10/01/2009 to 10/30/
2009.
EIS No. 20090311, Final EIS, USN, WA,
Naval Base Kitsap—Bangor, Construct
and Operate a Swimmer Interdiction
Security System (SISS), Silverdale
Kitsap County, WA, Wait Period
Ends: 10/13/2009, Contact: Shannon
Kasa, 619–553–3889. Revision to FR
Notice Published 09/11/2009:
Correction to Telephone Number.
Dated: September 22, 2009.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E9–23228 Filed 9–24–09; 8:45 am]
BILLING CODE 6560–50–P
E:\FR\FM\25SEN1.SGM
25SEN1
Agencies
[Federal Register Volume 74, Number 185 (Friday, September 25, 2009)]
[Notices]
[Page 48951]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-23228]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8597-6]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 09/14/2009 through 09/18/2009.
Pursuant to 40 CFR 1506.9.
EIS No. 20090324, Draft EIS, AFS, 00, Nebraska National Forests and
Grassland Travel Management Project, Proposes to Designate Routes and
Areas Open to Motorized Travel, Buffalo Gap National Grassland, Oglala
National Grassland, Samuel R. McKelvie National Forest, and the Pine
Ridge and Bessey Units of the Nebraska National Forest, Fall River,
Custer, Pennington, Jackson Counties; SD and Sioux, Dawes, Cherry,
Thomas and Blaine Counties, NE, Comment Period Ends: 11/09/2009,
Contact: Mark Reichert, 530-841-4422.
EIS No. 20090325, Draft EIS, NHT, 00, Corporate Average Fuel Economy
(CAF[Eacute]) Standards Passenger Car and Light Trucks Model Years
2012-2016, To Reduce National Energy Consumption by Increasing the Fuel
Economy of Passenger Car and Light Trucks sold in the United States,
Implementation, Comment Period Ends: 11/09/2009, Contact: Jessica GT
Wilson, 202-366-0176.
EIS No. 20090326, Final EIS, USN, FL, Naval Surface Warfare Center
Panama City Division (NSWC PCD), Capabilities to Conduct New and
Increased Mission Operations for the Department of Navy (DON) and
Customers within the three Military Operating Area and St. Andrew Bay
(SAB), Gulf of Mexico, FL, Wait Period Ends: 10/26/2009, Contact:
Carmen Ferrer, 850-234-4146.
EIS No. 20090327, Final EIS, STB, AK, Northern Rail Extension Project,
Construct and Operate a Rail Line between North Pole and Delta
Junction, AK, Wait Period Ends: 10/26/2009, Contact: Dave Navecky, 202-
245-0294.
EIS No. 20090328, Final EIS, FRC, 00, Phase VIII Expansion Project,
Proposed to Construct, Own, Operate, and Maintain New Interstate
National Gas Pipeline, Compressor, and Ancillary Facilities in Alabama
and Florida, Wait Period Ends: 10/26/2009, Contact: Julia Bovey 1-866-
208-3372.
EIS No. 20090329, Draft EIS, DOE, KS, Abengoa Biorefinery Project, To
Support the Design, Construction, and Startup of a Commercial-Scale
Integrated Biorefinery, Federal Funding, Located near the City Hugoton,
Stevens County, KS, Comment Period Ends: 11/09/2009, Contact: Kristin
Kerwin, 303-275-4968.
EIS No. 20090330, Draft EIS, USN, CA, Marine Corps Base Camp Pendleton
Basewide Utilities Infrastructure Construct and Operate Six Utility
Infrastructure Project, San Diego County, CA, Comment Period Ends: 11/
09/2009, Contact: Jesse Martinez, 619-532-3844.
EIS No. 20090331, Final EIS, COE, CA, San Pedro Waterfront Project,
Proposed Specific Development Project and Associated Infrastructure
Improvements on Approximately 400 Acres, Currently Operated by Los
Angeles Harbor Department (LAHD), Located along the West Side of Los
Angeles Harbor's Main Channel, from the Vincent Thomas Bridge to
Cabrillo Beach, US Army Section 10 and 404 and Section 103 Marine
Protection, Research, and Sanctuaries Act Permits, (MPRSA) City of Los
Angeles, CA, Wait Period Ends: 10/26/2009, Contact: Dr. Spencer D.
MacNeil, 805-585-2152.
Amended Notices
EIS No. 20090267, Draft EIS, AFS, MT, Bitterroot National Forest Travel
Management Planning, To Address Conflicts between Motorized and Non-
Motorized Users, Ravalli County, MT, Comment Period Ends: 11/09/2009,
Contact: Dan Ritter, 406-777-5461. Revision to FR Notice Published 08/
07/2009: Extending Comment Period from 09/21/2009 to 11/09/2009.
EIS No. 20090272, Draft EIS, UAF, 00, Modification of the Condor 1 and
Condor 2 Military Operation Areas, 104th Fighter Wing of the
Massachusetts Air National Guard Base (ANG) Proposes to Combine the
Condor 1 and Condor 2 MOA, ME and NH, Comment Period Ends: 01/01/2010,
Contact: Jay Nash, 703-614-0346. Revision to FR Notice Published 08/07/
2009: Extending Comment Period from 09/21/2009 to 11/09/2009.
EIS No. 20090277, Draft EIS, AFS, CO, Hermosa Park/Mitchell Lakes Land
Exchange Project, Proposed Land Exchange between Federal and Non-
Federal Lands, Implementation, Federal Land in LaPlata County and Non-
Federal Land in San Juan County, CO, Comment Period Ends: 10/30/2009,
Contact: Cindy Hockelberg, 970-884-1418. Revision to Federal Register
Notice Published 08/17/2009: Extending Comment Period from 10/01/2009
to 10/30/2009.
EIS No. 20090311, Final EIS, USN, WA, Naval Base Kitsap--Bangor,
Construct and Operate a Swimmer Interdiction Security System (SISS),
Silverdale Kitsap County, WA, Wait Period Ends: 10/13/2009, Contact:
Shannon Kasa, 619-553-3889. Revision to FR Notice Published 09/11/2009:
Correction to Telephone Number.
Dated: September 22, 2009.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E9-23228 Filed 9-24-09; 8:45 am]
BILLING CODE 6560-50-P