Upper Peninsula Power Company; Notice of Availability of Environmental Assessment, 48729 [E9-22996]
Download as PDF
Federal Register / Vol. 74, No. 184 / Thursday, September 24, 2009 / Notices
srobinson on DSKHWCL6B1PROD with NOTICES
the U.S. Department of Agriculture,
Forest Service. Eugene Water and
Electric Board proposes no new
capacity.
Staff prepared an environmental
assessment (EA), which analyzes the
potential environmental effects of
relicensing the project, and concludes
that licensing the project, with
appropriate environmental protective
measures, would not constitute a major
Federal action that would significantly
affect the quality of the human
environment.
A copy of the EA is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
202–502–8659.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
Any comments should be filed within
30 days from the date of this notice and
should be addressed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Please affix Project No. 2242–078 to all
comments. Comments may be filed
electronically via the Internet in lieu of
paper. The Commission strongly
encourages electronic filings. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site (https://www.ferc.gov) under the
‘‘e-Filing’’ link.
For further information, contact
Robert Easton by telephone at 202–502–
6045 or by e-mail at
Robert.Easton@ferc.gov.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–22995 Filed 9–23–09; 8:45 am]
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. ER09–1699–000]
[Project No. 10855–000]
Upper Peninsula Power Company;
Notice of Availability of Environmental
Assessment
September 17, 2009.
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s regulations, 18 CFR part
380, Commission staff have prepared an
environmental assessment (EA)
regarding Upper Peninsula Power
Company’s request to replace the
penstock at the McClure development of
the Dead River Hydroelectric Project
(FERC No. 10855) located on the Dead
River in Marquette County, Michigan.
The EA contains the Commission
staff’s analysis of the potential
environmental effects of the proposed
replacement of the McClure Penstock
and concludes that the proposed
penstock replacement, with appropriate
environmental protective measures,
would not constitute a major Federal
action that would significantly affect the
quality of the human environment.
Copies of the EA are available for
review in the Public Reference Room 2–
A of the Commission’s offices at 888
First Street, NE., Washington, DC 20426.
The EA may also be viewed on the
Commission’s Internet Web site (https://
www.ferc.gov) using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. Additional
information about the project is
available from the Commission’s Office
of External Affairs, at (202) 502–6088, or
on the Commission’s Web site using the
eLibrary link. For assistance with
eLibrary, contact
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676; for TTY contact
(202) 502–8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–22996 Filed 9–23–09; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
VerDate Nov<24>2008
17:40 Sep 23, 2009
Jkt 217001
48729
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
Eurus Combine Hills II, LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
September 17, 2009.
This is a supplemental notice in the
above-referenced proceeding of Eurus
Combine Hills II, LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
Part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR Part 34, of
future issuances of securities and
assumptions of liability, is September
17, 2009.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
E:\FR\FM\24SEN1.SGM
24SEN1
Agencies
[Federal Register Volume 74, Number 184 (Thursday, September 24, 2009)]
[Notices]
[Page 48729]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-22996]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 10855-000]
Upper Peninsula Power Company; Notice of Availability of
Environmental Assessment
September 17, 2009.
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's regulations, 18 CFR part
380, Commission staff have prepared an environmental assessment (EA)
regarding Upper Peninsula Power Company's request to replace the
penstock at the McClure development of the Dead River Hydroelectric
Project (FERC No. 10855) located on the Dead River in Marquette County,
Michigan.
The EA contains the Commission staff's analysis of the potential
environmental effects of the proposed replacement of the McClure
Penstock and concludes that the proposed penstock replacement, with
appropriate environmental protective measures, would not constitute a
major Federal action that would significantly affect the quality of the
human environment.
Copies of the EA are available for review in the Public Reference
Room 2-A of the Commission's offices at 888 First Street, NE.,
Washington, DC 20426. The EA may also be viewed on the Commission's
Internet Web site (https://www.ferc.gov) using the ``eLibrary'' link.
Enter the docket number excluding the last three digits in the docket
number field to access the document. Additional information about the
project is available from the Commission's Office of External Affairs,
at (202) 502-6088, or on the Commission's Web site using the eLibrary
link. For assistance with eLibrary, contact FERCOnlineSupport@ferc.gov
or toll-free at (866) 208-3676; for TTY contact (202) 502-8659.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-22996 Filed 9-23-09; 8:45 am]
BILLING CODE 6717-01-P