Indian River Power Supply, LLC; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests, 48726-48727 [E9-22994]
Download as PDF
48726
Federal Register / Vol. 74, No. 184 / Thursday, September 24, 2009 / Notices
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
e-mail FERCOnlineSupport@ferc.gov,
for TTY, call (202) 502–8659. A copy is
also available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Any filings must bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
p. Agency Comments: Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
q. Comments, protests and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov under the
‘‘e-Filing’’ link.
srobinson on DSKHWCL6B1PROD with NOTICES
Kimberly D. Bose,
Secretary.
[FR Doc. E9–22993 Filed 9–23–09; 8:45 am]
BILLING CODE 6717–01–P
VerDate Nov<24>2008
16:27 Sep 23, 2009
Jkt 217001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12462–020]
Indian River Power Supply, LLC;
Notice of Application for Amendment
of License and Soliciting Comments,
Motions To Intervene, and Protests
September 17, 2009.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Amendment
of License.
b. Project No.: 12462–020.
c. Date Filed: August 5, 2009.
d. Applicant: Indian River Power
Supply, LLC.
e. Name of Project: Indian River.
f. Location: Westfield River, in the
Town of Russell, Hampden County,
Massachusetts.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. Peter B.
Clark, Manager, P.O. Box 149, 823 Bay
Road, Hamilton, Massachusetts, (978)
468–3999.
i. FERC Contact: Jeremy Jessup,
Jeremy.Jessup@ferc.gov, (202) 502–6779.
j. Deadline for filing comments,
motions to intervene and protest:
October 17, 2009.
All documents (original and eight
copies) should be filed with: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency. A copy of any
motion to intervene must also be served
upon each representative of the
Applicant specified in the particular
application.
k. Description of Request: Indian
River Power Supply, LLC, proposes to
rehabilitate the project’s existing
generating Unit 1. The rehabilitated unit
would have an installed capacity of 800
kW and a hydraulic capacity of 428 cfs.
The rehabilitation would result in a
total installed capacity of 1,600 kW and
a total hydraulic capacity of 856 cfs for
the Indian River Project.
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
l. Location of the Application: The
filing is available for inspection and
reproduction at the Commission’s
Public Reference Room, located at 888
First Street, NE., Room 2A, Washington,
DC 20426 or by calling (202) 502–8371,
or by calling (202) 502–8371. This filing
may also be viewed on the
Commission’s Web site at https://ferc.gov
using the ‘‘eLibrary’’ link. Enter the
docket number excluding the last three
digits in the docket number field to
access the document. You may also
register online at https://www.ferc.gov/
docsfiling/esubscription.asp to be
notified via e-mail of new filings and
issuances related to this or other
pending projects. For assistance, call 1–
866–208–3676 or e-mail
FERCOnlineSupport@ferc.gov, for TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Any filing must bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
p. Agency Comments: Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
q. Comments, protests and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(I)(iii) and the
instructions on the Commission’s Web
E:\FR\FM\24SEN1.SGM
24SEN1
Federal Register / Vol. 74, No. 184 / Thursday, September 24, 2009 / Notices
site at https://www.ferc.gov under the
‘‘e-Filing’’ link.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–22994 Filed 9–23–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
srobinson on DSKHWCL6B1PROD with NOTICES
September 16, 2009.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG09–92–000.
Applicants: Eurus Combine Hills II
LLC.
Description: Eurus Combine Hills II
LLC submits notice of self-certification
as an exempt wholesale generator.
Filed Date: 09/14/2009.
Accession Number: 20090916–0077.
Comment Date: 5 p.m. Eastern Time
on Monday, October 05, 2009.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER00–2129–003;
ER04–944–007; ER99–1801–012.
Applicants: Orion Power Midwest,
L.P., RRI Energy Wholesale Generation,
LLC, RRI Energy Solutions East, LLC.
Description: Amendment to the
Triennial Report of RRI Central MBR
Entities.
Filed Date: 09/15/2009.
Accession Number: 20090915–5054.
Comment Date: 5 p.m. Eastern Time
on Tuesday, October 06, 2009.
Docket Numbers: ER03–1284–007;
ER05–1202–007; ER08–1225–004.
Applicants: Blue Canyon Windpower
II LLC, Cloud County Wind Farm, LLC,
Blue Canyon Windpower LLC.
Description: Blue Canyon Windpower
LLC et al submits notice of non-material
change in status in compliance with the
reporting requirements set forth in
section 35.42 of the regulations of the
FERC.
Filed Date: 09/15/2009.
Accession Number: 20090916–0076.
Comment Date: 5 p.m. Eastern Time
on Tuesday, October 06, 2009.
Docket Numbers: ER06–615–053;
ER09–556–002; ER08–367–007.
Applicants: California Independent
System Operator Corporation.
Description: Motion of the California
Independent System Operator
Corporation to Modify the Effective Date
of Certain Tariff Revisions.
Filed Date: 09/11/2009.
VerDate Nov<24>2008
16:27 Sep 23, 2009
Jkt 217001
Accession Number: 20090911–5108.
Comment Date: 5 p.m. Eastern Time
on Friday, October 02, 2009.
Docket Numbers: ER09–412–007.
Applicants: PJM Interconnection LLC.
Description: PJM Interconnection,
LLC submits revisions to the PJM Open
Access Transmission Tariff, FERC
Electric Tariff Sixth Revised Volume 1
to incorporate changes directed by the
Aug. 14 Order.
Filed Date: 09/14/2009.
Accession Number: 20090916–0015.
Comment Date: 5 p.m. Eastern Time
on Monday, October 05, 2009.
Docket Numbers: ER09–1574–001.
Applicants: MidAmerican Energy
Company.
Description: MidAmerican Energy
Company submits Substitute First
Revised Rate Schedule No 42 et al.
Filed Date: 09/14/2009.
Accession Number: 20090914–0077.
Comment Date: 5 p.m. Eastern Time
on Monday, October 05, 2009.
Docket Numbers: ER09–1618–000.
Applicants: Montana Alberta Tie Ltd.
Description: Supplemental
Information of Montana Alberta Tie Ltd,
and MATL LLP.
Filed Date: 09/10/2009.
Accession Number: 20090910–5107.
Comment Date: 5 p.m. Eastern Time
on September 21, 2009.
Docket Numbers: ER09–1695–000.
Applicants: Public Service Company
of New Mexico.
Description: Public Service Company
of New Mexico submits a transmission
service agreement with Third Planet
Windpower, LLC.
Filed Date: 09/11/2009.
Accession Number: 20090911–0055.
Comment Date: 5 p.m. Eastern Time
on Friday, October 02, 2009.
Docket Numbers: ER09–1699–000.
Applicants: Eurus Combine Hills II
LLC.
Description: Eurus Combine Hills II,
LLC submits application for market
based rate authority and associated
waivers and blanket approvals.
Filed Date: 09/14/2009.
Accession Number: 20090916–0014.
Comment Date: 5 p.m. Eastern Time
on Monday, October 05, 2009.
Docket Numbers: ER09–1706–000.
Applicants: Tampa Electric Company.
Description: Tampa Electric Company
submits contract for the purchase and
sale of economy energy between Tampa
Electric and The Energy Authority, Inc.
Filed Date: 09/14/2009.
Accession Number: 20090915–0062.
Comment Date: 5 p.m. Eastern Time
on Monday, October 05, 2009.
Docket Numbers: ER09–1707–000.
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
48727
Applicants: PacifiCorp.
Description: PacifiCorp Energy
submits notice of termination of Rate
Schedule No. 389 with Bonneville
Power Administration.
Filed Date: 09/14/2009.
Accession Number: 20090915–0061.
Comment Date: 5 p.m. Eastern Time
on Monday, October 05, 2009.
Docket Numbers: ER09–1708–000.
Applicants: New York Independent
System Operator, Inc.
Description: New York Independent
System Operator, Inc submits for
request for a one time waiver.
Filed Date: 09/15/2009.
Accession Number: 20090915–0060.
Comment Date: 5 p.m. Eastern Time
on Tuesday, October 06, 2009.
Docket Numbers: ER09–1709–000.
Applicants: Midwest Independent
Transmission System.
Description: Midwest Independent
Transmission System Operator, Inc
submits revisions to the Credit Policy in
Attachment L and Module A of the
Midwest ISO’s Open Access
Transmission, Energy and Operating
Reserves Market Tariff.
Filed Date: 09/15/2009.
Accession Number: 20090916–0018.
Comment Date: 5 p.m. Eastern Time
on Tuesday, October 06, 2009.
Take notice that the Commission
received the following open access
transmission tariff filings:
Docket Numbers: OA09–11–001.
Applicants: Black Hills Power, Inc.
Description: Transmission Providers
submits a revised version of Attachment
K to their joint open access transmission
tariff on file with FERC.
Filed Date: 09/15/2009.
Accession Number: 20090916–0017.
Comment Date: 5 p.m. Eastern Time
on Tuesday, October 06, 2009.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
E:\FR\FM\24SEN1.SGM
24SEN1
Agencies
[Federal Register Volume 74, Number 184 (Thursday, September 24, 2009)]
[Notices]
[Pages 48726-48727]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-22994]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12462-020]
Indian River Power Supply, LLC; Notice of Application for
Amendment of License and Soliciting Comments, Motions To Intervene, and
Protests
September 17, 2009.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Amendment of License.
b. Project No.: 12462-020.
c. Date Filed: August 5, 2009.
d. Applicant: Indian River Power Supply, LLC.
e. Name of Project: Indian River.
f. Location: Westfield River, in the Town of Russell, Hampden
County, Massachusetts.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Mr. Peter B. Clark, Manager, P.O. Box 149,
823 Bay Road, Hamilton, Massachusetts, (978) 468-3999.
i. FERC Contact: Jeremy Jessup, Jeremy.Jessup@ferc.gov, (202) 502-
6779.
j. Deadline for filing comments, motions to intervene and protest:
October 17, 2009.
All documents (original and eight copies) should be filed with:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency. A copy
of any motion to intervene must also be served upon each representative
of the Applicant specified in the particular application.
k. Description of Request: Indian River Power Supply, LLC, proposes
to rehabilitate the project's existing generating Unit 1. The
rehabilitated unit would have an installed capacity of 800 kW and a
hydraulic capacity of 428 cfs. The rehabilitation would result in a
total installed capacity of 1,600 kW and a total hydraulic capacity of
856 cfs for the Indian River Project.
l. Location of the Application: The filing is available for
inspection and reproduction at the Commission's Public Reference Room,
located at 888 First Street, NE., Room 2A, Washington, DC 20426 or by
calling (202) 502-8371, or by calling (202) 502-8371. This filing may
also be viewed on the Commission's Web site at https://ferc.gov using
the ``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. You may also
register online at https://www.ferc.gov/docsfiling/esubscription.asp to
be notified via e-mail of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or e-mail
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Any filing must bear in all capital letters the title
``COMMENTS'', ``PROTEST'', or ``MOTION TO INTERVENE'', as applicable,
and the Project Number of the particular application to which the
filing refers.
p. Agency Comments: Federal, state, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
q. Comments, protests and interventions may be filed electronically
via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(I)(iii) and
the instructions on the Commission's Web
[[Page 48727]]
site at https://www.ferc.gov under the ``e-Filing'' link.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-22994 Filed 9-23-09; 8:45 am]
BILLING CODE 6717-01-P