Indian River Power Supply, LLC; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests, 48726-48727 [E9-22994]

Download as PDF 48726 Federal Register / Vol. 74, No. 184 / Thursday, September 24, 2009 / Notices related to this or other pending projects. For assistance, call 1–866–208–3676 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’, as applicable, and the Project Number of the particular application to which the filing refers. p. Agency Comments: Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. q. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov under the ‘‘e-Filing’’ link. srobinson on DSKHWCL6B1PROD with NOTICES Kimberly D. Bose, Secretary. [FR Doc. E9–22993 Filed 9–23–09; 8:45 am] BILLING CODE 6717–01–P VerDate Nov<24>2008 16:27 Sep 23, 2009 Jkt 217001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12462–020] Indian River Power Supply, LLC; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests September 17, 2009. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Amendment of License. b. Project No.: 12462–020. c. Date Filed: August 5, 2009. d. Applicant: Indian River Power Supply, LLC. e. Name of Project: Indian River. f. Location: Westfield River, in the Town of Russell, Hampden County, Massachusetts. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Mr. Peter B. Clark, Manager, P.O. Box 149, 823 Bay Road, Hamilton, Massachusetts, (978) 468–3999. i. FERC Contact: Jeremy Jessup, Jeremy.Jessup@ferc.gov, (202) 502–6779. j. Deadline for filing comments, motions to intervene and protest: October 17, 2009. All documents (original and eight copies) should be filed with: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. k. Description of Request: Indian River Power Supply, LLC, proposes to rehabilitate the project’s existing generating Unit 1. The rehabilitated unit would have an installed capacity of 800 kW and a hydraulic capacity of 428 cfs. The rehabilitation would result in a total installed capacity of 1,600 kW and a total hydraulic capacity of 856 cfs for the Indian River Project. PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 l. Location of the Application: The filing is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426 or by calling (202) 502–8371, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/ docsfiling/esubscription.asp to be notified via e-mail of new filings and issuances related to this or other pending projects. For assistance, call 1– 866–208–3676 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Any filing must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’, as applicable, and the Project Number of the particular application to which the filing refers. p. Agency Comments: Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. q. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(I)(iii) and the instructions on the Commission’s Web E:\FR\FM\24SEN1.SGM 24SEN1 Federal Register / Vol. 74, No. 184 / Thursday, September 24, 2009 / Notices site at https://www.ferc.gov under the ‘‘e-Filing’’ link. Kimberly D. Bose, Secretary. [FR Doc. E9–22994 Filed 9–23–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 srobinson on DSKHWCL6B1PROD with NOTICES September 16, 2009. Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG09–92–000. Applicants: Eurus Combine Hills II LLC. Description: Eurus Combine Hills II LLC submits notice of self-certification as an exempt wholesale generator. Filed Date: 09/14/2009. Accession Number: 20090916–0077. Comment Date: 5 p.m. Eastern Time on Monday, October 05, 2009. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER00–2129–003; ER04–944–007; ER99–1801–012. Applicants: Orion Power Midwest, L.P., RRI Energy Wholesale Generation, LLC, RRI Energy Solutions East, LLC. Description: Amendment to the Triennial Report of RRI Central MBR Entities. Filed Date: 09/15/2009. Accession Number: 20090915–5054. Comment Date: 5 p.m. Eastern Time on Tuesday, October 06, 2009. Docket Numbers: ER03–1284–007; ER05–1202–007; ER08–1225–004. Applicants: Blue Canyon Windpower II LLC, Cloud County Wind Farm, LLC, Blue Canyon Windpower LLC. Description: Blue Canyon Windpower LLC et al submits notice of non-material change in status in compliance with the reporting requirements set forth in section 35.42 of the regulations of the FERC. Filed Date: 09/15/2009. Accession Number: 20090916–0076. Comment Date: 5 p.m. Eastern Time on Tuesday, October 06, 2009. Docket Numbers: ER06–615–053; ER09–556–002; ER08–367–007. Applicants: California Independent System Operator Corporation. Description: Motion of the California Independent System Operator Corporation to Modify the Effective Date of Certain Tariff Revisions. Filed Date: 09/11/2009. VerDate Nov<24>2008 16:27 Sep 23, 2009 Jkt 217001 Accession Number: 20090911–5108. Comment Date: 5 p.m. Eastern Time on Friday, October 02, 2009. Docket Numbers: ER09–412–007. Applicants: PJM Interconnection LLC. Description: PJM Interconnection, LLC submits revisions to the PJM Open Access Transmission Tariff, FERC Electric Tariff Sixth Revised Volume 1 to incorporate changes directed by the Aug. 14 Order. Filed Date: 09/14/2009. Accession Number: 20090916–0015. Comment Date: 5 p.m. Eastern Time on Monday, October 05, 2009. Docket Numbers: ER09–1574–001. Applicants: MidAmerican Energy Company. Description: MidAmerican Energy Company submits Substitute First Revised Rate Schedule No 42 et al. Filed Date: 09/14/2009. Accession Number: 20090914–0077. Comment Date: 5 p.m. Eastern Time on Monday, October 05, 2009. Docket Numbers: ER09–1618–000. Applicants: Montana Alberta Tie Ltd. Description: Supplemental Information of Montana Alberta Tie Ltd, and MATL LLP. Filed Date: 09/10/2009. Accession Number: 20090910–5107. Comment Date: 5 p.m. Eastern Time on September 21, 2009. Docket Numbers: ER09–1695–000. Applicants: Public Service Company of New Mexico. Description: Public Service Company of New Mexico submits a transmission service agreement with Third Planet Windpower, LLC. Filed Date: 09/11/2009. Accession Number: 20090911–0055. Comment Date: 5 p.m. Eastern Time on Friday, October 02, 2009. Docket Numbers: ER09–1699–000. Applicants: Eurus Combine Hills II LLC. Description: Eurus Combine Hills II, LLC submits application for market based rate authority and associated waivers and blanket approvals. Filed Date: 09/14/2009. Accession Number: 20090916–0014. Comment Date: 5 p.m. Eastern Time on Monday, October 05, 2009. Docket Numbers: ER09–1706–000. Applicants: Tampa Electric Company. Description: Tampa Electric Company submits contract for the purchase and sale of economy energy between Tampa Electric and The Energy Authority, Inc. Filed Date: 09/14/2009. Accession Number: 20090915–0062. Comment Date: 5 p.m. Eastern Time on Monday, October 05, 2009. Docket Numbers: ER09–1707–000. PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 48727 Applicants: PacifiCorp. Description: PacifiCorp Energy submits notice of termination of Rate Schedule No. 389 with Bonneville Power Administration. Filed Date: 09/14/2009. Accession Number: 20090915–0061. Comment Date: 5 p.m. Eastern Time on Monday, October 05, 2009. Docket Numbers: ER09–1708–000. Applicants: New York Independent System Operator, Inc. Description: New York Independent System Operator, Inc submits for request for a one time waiver. Filed Date: 09/15/2009. Accession Number: 20090915–0060. Comment Date: 5 p.m. Eastern Time on Tuesday, October 06, 2009. Docket Numbers: ER09–1709–000. Applicants: Midwest Independent Transmission System. Description: Midwest Independent Transmission System Operator, Inc submits revisions to the Credit Policy in Attachment L and Module A of the Midwest ISO’s Open Access Transmission, Energy and Operating Reserves Market Tariff. Filed Date: 09/15/2009. Accession Number: 20090916–0018. Comment Date: 5 p.m. Eastern Time on Tuesday, October 06, 2009. Take notice that the Commission received the following open access transmission tariff filings: Docket Numbers: OA09–11–001. Applicants: Black Hills Power, Inc. Description: Transmission Providers submits a revised version of Attachment K to their joint open access transmission tariff on file with FERC. Filed Date: 09/15/2009. Accession Number: 20090916–0017. Comment Date: 5 p.m. Eastern Time on Tuesday, October 06, 2009. Any person desiring to intervene or to protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. It is not necessary to separately intervene again in a subdocket related to a compliance filing if you have previously intervened in the same docket. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. In reference to filings initiating a new proceeding, interventions or protests submitted on or before the comment deadline need not be served on persons other than the Applicant. E:\FR\FM\24SEN1.SGM 24SEN1

Agencies

[Federal Register Volume 74, Number 184 (Thursday, September 24, 2009)]
[Notices]
[Pages 48726-48727]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-22994]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 12462-020]


Indian River Power Supply, LLC; Notice of Application for 
Amendment of License and Soliciting Comments, Motions To Intervene, and 
Protests

September 17, 2009.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Amendment of License.
    b. Project No.: 12462-020.
    c. Date Filed: August 5, 2009.
    d. Applicant: Indian River Power Supply, LLC.
    e. Name of Project: Indian River.
    f. Location: Westfield River, in the Town of Russell, Hampden 
County, Massachusetts.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Mr. Peter B. Clark, Manager, P.O. Box 149, 
823 Bay Road, Hamilton, Massachusetts, (978) 468-3999.
    i. FERC Contact: Jeremy Jessup, Jeremy.Jessup@ferc.gov, (202) 502-
6779.
    j. Deadline for filing comments, motions to intervene and protest: 
October 17, 2009.
    All documents (original and eight copies) should be filed with: 
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 
First Street, NE., Washington, DC 20426.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person whose name appears on the official service 
list for the project. Further, if an intervenor files comments or 
documents with the Commission relating to the merits of an issue that 
may affect the responsibilities of a particular resource agency, they 
must also serve a copy of the document on that resource agency. A copy 
of any motion to intervene must also be served upon each representative 
of the Applicant specified in the particular application.
    k. Description of Request: Indian River Power Supply, LLC, proposes 
to rehabilitate the project's existing generating Unit 1. The 
rehabilitated unit would have an installed capacity of 800 kW and a 
hydraulic capacity of 428 cfs. The rehabilitation would result in a 
total installed capacity of 1,600 kW and a total hydraulic capacity of 
856 cfs for the Indian River Project.
    l. Location of the Application: The filing is available for 
inspection and reproduction at the Commission's Public Reference Room, 
located at 888 First Street, NE., Room 2A, Washington, DC 20426 or by 
calling (202) 502-8371, or by calling (202) 502-8371. This filing may 
also be viewed on the Commission's Web site at https://ferc.gov using 
the ``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. You may also 
register online at https://www.ferc.gov/docsfiling/esubscription.asp to 
be notified via e-mail of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3676 or e-mail 
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Any filing must bear in all capital letters the title 
``COMMENTS'', ``PROTEST'', or ``MOTION TO INTERVENE'', as applicable, 
and the Project Number of the particular application to which the 
filing refers.
    p. Agency Comments: Federal, state, and local agencies are invited 
to file comments on the described application. A copy of the 
application may be obtained by agencies directly from the Applicant. If 
an agency does not file comments within the time specified for filing 
comments, it will be presumed to have no comments. One copy of an 
agency's comments must also be sent to the Applicant's representatives.
    q. Comments, protests and interventions may be filed electronically 
via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(I)(iii) and 
the instructions on the Commission's Web

[[Page 48727]]

site at https://www.ferc.gov under the ``e-Filing'' link.

Kimberly D. Bose,
Secretary.
[FR Doc. E9-22994 Filed 9-23-09; 8:45 am]
BILLING CODE 6717-01-P