Combined Notice of Filings No. 2, 48250-48251 [E9-22726]

Download as PDF 48250 Federal Register / Vol. 74, No. 182 / Tuesday, September 22, 2009 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13508–000] Lock+TM Hydro Friends Fund XX, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications sroberts on DSKD5P82C1PROD with NOTICES September 15, 2009. On June 9, 2009, Lock+TM Hydro Friends Fund XX, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Muddy Waters Hydroelectric Project, located on the Kentucky River, in Jessamine and Madison Counties, Kentucky. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) 2 lock frame modules; (2) 18 hydropower turbines; (3) flow control doors; (4) a conduit; (5) transmission line; and (6) appurtenant facilities. The proposed Muddy Waters Project would have an average annual generation of 284,018,400 kilowatt-hours. Applicant Contact: Wayne F. Krause, Hydro Green Energy, LLC, Lock+TM Hydro Friends Fund, LLC, 5090 Richmond Avenue #390, Houston, TX 77056. FERC Contact: Allyson Conner, (202) 502–6082. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https:// www.ferc.gov/docs-filing/ferconline.asp) under the ‘‘eFiling’’ link. For a simpler method of submitting text only comments, click on ‘‘Quick Comment.’’ For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY, contact (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be VerDate Nov<24>2008 21:23 Sep 21, 2009 Jkt 217001 paper-filed. To paper-file, mail an original and eight copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of the Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–13508) in the docket number field to access the document. For assistance, contact FERC Online Support. Kimberly D. Bose, Secretary. [FR Doc. E9–22714 Filed 9–21–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings No. 2 September 10, 2009. Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Docket Numbers: RP09–423–003. Applicants: Columbia Gulf Transmission Company. Description: Columbia Gulf Transmission Company TRA Backhaul Errata Filing. Filed Date: 09/01/2009. Accession Number: 20090901–5168. Comment Date: 5 p.m. Eastern Time on Monday, September 14, 2009. Docket Numbers: RP96–320–115. Applicants: Gulf South Pipeline Company, LP. Description: Gulf South Pipeline Company, LP submits an amendment to a negotiated rate letter agreement executed by Gulf South and one of its customers in relation to the East Texas to Mississippi Expansion Project. Filed Date: 09/01/2009. Accession Number: 20090902–0161. Comment Date: 5 p.m. Eastern Time on Monday, September 14, 2009. Docket Numbers: RP06–200–062. Applicants: Rockies Express Pipeline LLC. Description: Rockies Express Pipeline LLC submits Twelfth Revised Sheet No. 9 et al to FERC Gas Tariff, Second Revised Volume No. 1. Filed Date: 09/03/2009. Accession Number: 20090904–0055. Comment Date: 5 p.m. Eastern Time on Tuesday, September 15, 2009. Docket Numbers: RP09–371–002. Applicants: Crossroads Pipeline Company. PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 Description: Crossroads Pipeline Company submits Twelfth Revised Sheet 6 to FERC Gas Tariff, First Revised Volume 1. Filed Date: 09/03/2009. Accession Number: 20090903–0201. Comment Date: 5 p.m. Eastern Time on Tuesday, September 15, 2009. Docket Numbers: RP09–845–001. Applicants: TransColorado Gas Transmission Company L. Description: TransColorado Gas Transmission Company LLC submits Sub. First Revised Sheet 248 to FERC Gas Tariff, Second Revised Volume 2. Filed Date: 09/03/2009. Accession Number: 20090904–0061. Comment Date: 5 p.m. Eastern Time on Tuesday, September 15, 2009. Docket Numbers: RP09–872–001. Applicants: Arlington Storage Company, LLC. Description: Arlington Storage Co, LLC submits Sub Original Sheet No. 2 et al to FERC Gas Tariff, Original Volume No. 1. Filed Date: 09/03/2009. Accession Number: 20090904–0056. Comment Date: 5 p.m. Eastern Time on Tuesday, September 15, 2009. Docket Numbers: RP00–425–008. Applicants: Southern Star Central Gas Pipeline, Inc. Description: Southern Star Central Gas Pipeline, Inc submits Second Revised Sheet 17 to FERC Gas Tariff, First Revised Volume 1. Filed Date: 09/08/2009. Accession Number: 20090908–0061. Comment Date: 5 p.m. Eastern Time on Monday, September 21, 2009. Docket Numbers: RP09–932–001. Applicants: Monroe Gas Storage Company, LLC. Description: Monroe Gas Storage Company, LLC submits Substitute First Revised Sheet No 182 et al to FERC Gas Tariff, Original Volume No 1. Filed Date: 09/08/2009. Accession Number: 20090909–0158. Comment Date: 5 p.m. Eastern Time on Monday, September 21, 2009. Any person desiring to protest this filing must file in accordance with Rule 211 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211). Protests to this filing will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Such protests must be filed on or before 5 p.m. Eastern time on the specified comment date. Anyone filing a protest must serve a copy of that document on all the parties to the proceeding. The Commission encourages electronic submission of protests in lieu E:\FR\FM\22SEN1.SGM 22SEN1 Federal Register / Vol. 74, No. 182 / Tuesday, September 22, 2009 / Notices of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. E9–22726 Filed 9–21–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings sroberts on DSKD5P82C1PROD with NOTICES September 11, 2009. Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Docket Numbers: RP09–1032–000. Applicants: Tennessee Gas Pipeline Company. Description: Tennessee Gas Pipeline Company submits Gas Transportation Agreements with MGI Supply, Ltd, Second Revised Sheet 413B et al. to FERC Gas Tariff, Fifth Revised Volume 1, to be effective 10/1/09. Filed Date: 09/03/2009. Accession Number: 20090903–0203. Comment Date: 5 p.m. Eastern Time on Tuesday, September 15, 2009. Docket Numbers: RP09–1033–000. Applicants: Texas Eastern Transmission, L.P. Description: Texas Eastern Transmission, LP submits Second Revised Sheet 3 et al. to FERC Gas Tariff, Seventh Revised Volume 1 et al. Filed Date: 09/03/2009. Accession Number: 20090903–0202. Comment Date: 5 p.m. Eastern Time on Tuesday, September 15, 2009. Docket Numbers: RP09–1034–000. Applicants: Enbridge Pipelines (Midla) L.L.C. Description: Enbridge Pipelines (Midla) LLC submits First Revised Sheet No. 5 to FERC Gas Tariff, Fifth Revised Volume No. 1, to be effective 9/4/09. VerDate Nov<24>2008 21:23 Sep 21, 2009 Jkt 217001 Filed Date: 09/03/2009. Accession Number: 20090904–0057. Comment Date: 5 p.m. Eastern Time on Tuesday, September 15, 2009. Docket Numbers: RP09–1038–000. Applicants: Viking Gas Transmission Company. Description: Viking Gas Transmission Company submits nonconforming firm Transportation Agreement, a service agreement entered into with Northern States Power Company, a Minnesota corporation under RP09–1038. Filed Date: 09/09/2009. Accession Number: 20090910–0456. Comment Date: 5 p.m. Eastern Time on Monday, September 21, 2009. Docket Numbers: RP09–1039–000. Applicants: Columbia Gulf Transmission Company. Description: Columbia Gulf Transmission Company submits petition for limited waivers of sections 19.5(g) et al. of the General Terms and Conditions of Columbia Gulf’s FERC Gas Tariff, Second Revised Volume 1 under RP09– 1039. Filed Date: 09/09/2009. Accession Number: 20090910–0454. Comment Date: 5 p.m. Eastern Time on Monday, September 21, 2009. Docket Numbers: RP09–1040–000. Applicants: Ozark Gas Transmission, L.L.C. Description: Ozark Gas Transmission, LLC submits First Revised Sheet 1 et al. to FERC Gas Tariff, First Revised Volume 1 to be effective 11/16/09 under RP09–1040. 1 of 2. Filed Date: 09/09/2009. Accession Number: 20090910–0452. Comment Date: 5 p.m. Eastern Time on Monday, September 21, 2009. Any person desiring to intervene or to protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. It is not necessary to separately intervene again in a subdocket related to a compliance filing if you have previously intervened in the same docket. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. In reference to filings initiating a new proceeding, interventions or protests submitted on or before the comment deadline need not be served on persons other than the Applicant. The Commission encourages electronic submission of protests and PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 48251 interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St. NE., Washington, DC 20426. The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. E9–22725 Filed 9–21–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #1 September 14, 2009. Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC09–108–000. Applicants: ALLETE, Inc. Description: Allete submits Application for Authorization to Acquire Transmission Facilities. Filed Date: 09/04/2009. Accession Number: 20090909–0146. Comment Date: 5 p.m. Eastern Time on Friday, September 25, 2009. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER06–1367–005; ER06–745–004; ER07–239–004; ER99– 1714–008. Applicants: BG Dighton Power, LLC, BG Energy Merchants, LLC, MASSPOWER, Lake Road Generating Company, L.P. E:\FR\FM\22SEN1.SGM 22SEN1

Agencies

[Federal Register Volume 74, Number 182 (Tuesday, September 22, 2009)]
[Notices]
[Pages 48250-48251]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-22726]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings No. 2

September 10, 2009.
    Take notice that the Commission has received the following Natural 
Gas Pipeline Rate and Refund Report filings:

    Docket Numbers: RP09-423-003.
    Applicants: Columbia Gulf Transmission Company.
    Description: Columbia Gulf Transmission Company TRA Backhaul Errata 
Filing.
    Filed Date: 09/01/2009.
    Accession Number: 20090901-5168.
    Comment Date: 5 p.m. Eastern Time on Monday, September 14, 2009.

    Docket Numbers: RP96-320-115.
    Applicants: Gulf South Pipeline Company, LP.
    Description: Gulf South Pipeline Company, LP submits an amendment 
to a negotiated rate letter agreement executed by Gulf South and one of 
its customers in relation to the East Texas to Mississippi Expansion 
Project.
    Filed Date: 09/01/2009.
    Accession Number: 20090902-0161.
    Comment Date: 5 p.m. Eastern Time on Monday, September 14, 2009.

    Docket Numbers: RP06-200-062.
    Applicants: Rockies Express Pipeline LLC.
    Description: Rockies Express Pipeline LLC submits Twelfth Revised 
Sheet No. 9 et al to FERC Gas Tariff, Second Revised Volume No. 1.
    Filed Date: 09/03/2009.
    Accession Number: 20090904-0055.
    Comment Date: 5 p.m. Eastern Time on Tuesday, September 15, 2009.

    Docket Numbers: RP09-371-002.
    Applicants: Crossroads Pipeline Company.
    Description: Crossroads Pipeline Company submits Twelfth Revised 
Sheet 6 to FERC Gas Tariff, First Revised Volume 1.
    Filed Date: 09/03/2009.
    Accession Number: 20090903-0201.
    Comment Date: 5 p.m. Eastern Time on Tuesday, September 15, 2009.

    Docket Numbers: RP09-845-001.
    Applicants: TransColorado Gas Transmission Company L.
    Description: TransColorado Gas Transmission Company LLC submits 
Sub. First Revised Sheet 248 to FERC Gas Tariff, Second Revised Volume 
2.
    Filed Date: 09/03/2009.
    Accession Number: 20090904-0061.
    Comment Date: 5 p.m. Eastern Time on Tuesday, September 15, 2009.

    Docket Numbers: RP09-872-001.
    Applicants: Arlington Storage Company, LLC.
    Description: Arlington Storage Co, LLC submits Sub Original Sheet 
No. 2 et al to FERC Gas Tariff, Original Volume No. 1.
    Filed Date: 09/03/2009.
    Accession Number: 20090904-0056.
    Comment Date: 5 p.m. Eastern Time on Tuesday, September 15, 2009.

    Docket Numbers: RP00-425-008.
    Applicants: Southern Star Central Gas Pipeline, Inc.
    Description: Southern Star Central Gas Pipeline, Inc submits Second 
Revised Sheet 17 to FERC Gas Tariff, First Revised Volume 1.
    Filed Date: 09/08/2009.
    Accession Number: 20090908-0061.
    Comment Date: 5 p.m. Eastern Time on Monday, September 21, 2009.

    Docket Numbers: RP09-932-001.
    Applicants: Monroe Gas Storage Company, LLC.
    Description: Monroe Gas Storage Company, LLC submits Substitute 
First Revised Sheet No 182 et al to FERC Gas Tariff, Original Volume No 
1.
    Filed Date: 09/08/2009.
    Accession Number: 20090909-0158.
    Comment Date: 5 p.m. Eastern Time on Monday, September 21, 2009.
    Any person desiring to protest this filing must file in accordance 
with Rule 211 of the Commission's Rules of Practice and Procedure (18 
CFR 385.211). Protests to this filing will be considered by the 
Commission in determining the appropriate action to be taken, but will 
not serve to make protestants parties to the proceeding. Such protests 
must be filed on or before 5 p.m. Eastern time on the specified comment 
date. Anyone filing a protest must serve a copy of that document on all 
the parties to the proceeding.
    The Commission encourages electronic submission of protests in lieu

[[Page 48251]]

of paper using the ``eFiling'' link at https://www.ferc.gov. Persons 
unable to file electronically should submit an original and 14 copies 
of the protest to the Federal Energy Regulatory Commission, 888 First 
Street, NE., Washington, DC 20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E9-22726 Filed 9-21-09; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.