Download as PDF 48250 Federal Register / Vol. 74, No. 182 / Tuesday, September 22, 2009 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13508–000] Lock+TM Hydro Friends Fund XX, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications sroberts on DSKD5P82C1PROD with NOTICES September 15, 2009. On June 9, 2009, Lock+TM Hydro Friends Fund XX, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Muddy Waters Hydroelectric Project, located on the Kentucky River, in Jessamine and Madison Counties, Kentucky. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of the following: (1) 2 lock frame modules; (2) 18 hydropower turbines; (3) flow control doors; (4) a conduit; (5) transmission line; and (6) appurtenant facilities. The proposed Muddy Waters Project would have an average annual generation of 284,018,400 kilowatt-hours. Applicant Contact: Wayne F. Krause, Hydro Green Energy, LLC, Lock+TM Hydro Friends Fund, LLC, 5090 Richmond Avenue #390, Houston, TX 77056. FERC Contact: Allyson Conner, (202) 502–6082. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https:// www.ferc.gov/docs-filing/ferconline.asp) under the ‘‘eFiling’’ link. For a simpler method of submitting text only comments, click on ‘‘Quick Comment.’’ For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY, contact (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be VerDate Nov<24>2008 21:23 Sep 21, 2009 Jkt 217001 paper-filed. To paper-file, mail an original and eight copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of the Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–13508) in the docket number field to access the document. For assistance, contact FERC Online Support. Kimberly D. Bose, Secretary. [FR Doc. E9–22714 Filed 9–21–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings No. 2 September 10, 2009. Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Docket Numbers: RP09–423–003. Applicants: Columbia Gulf Transmission Company. Description: Columbia Gulf Transmission Company TRA Backhaul Errata Filing. Filed Date: 09/01/2009. Accession Number: 20090901–5168. Comment Date: 5 p.m. Eastern Time on Monday, September 14, 2009. Docket Numbers: RP96–320–115. Applicants: Gulf South Pipeline Company, LP. Description: Gulf South Pipeline Company, LP submits an amendment to a negotiated rate letter agreement executed by Gulf South and one of its customers in relation to the East Texas to Mississippi Expansion Project. Filed Date: 09/01/2009. Accession Number: 20090902–0161. Comment Date: 5 p.m. Eastern Time on Monday, September 14, 2009. Docket Numbers: RP06–200–062. Applicants: Rockies Express Pipeline LLC. Description: Rockies Express Pipeline LLC submits Twelfth Revised Sheet No. 9 et al to FERC Gas Tariff, Second Revised Volume No. 1. Filed Date: 09/03/2009. Accession Number: 20090904–0055. Comment Date: 5 p.m. Eastern Time on Tuesday, September 15, 2009. Docket Numbers: RP09–371–002. Applicants: Crossroads Pipeline Company. PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 Description: Crossroads Pipeline Company submits Twelfth Revised Sheet 6 to FERC Gas Tariff, First Revised Volume 1. Filed Date: 09/03/2009. Accession Number: 20090903–0201. Comment Date: 5 p.m. Eastern Time on Tuesday, September 15, 2009. Docket Numbers: RP09–845–001. Applicants: TransColorado Gas Transmission Company L. Description: TransColorado Gas Transmission Company LLC submits Sub. First Revised Sheet 248 to FERC Gas Tariff, Second Revised Volume 2. Filed Date: 09/03/2009. Accession Number: 20090904–0061. Comment Date: 5 p.m. Eastern Time on Tuesday, September 15, 2009. Docket Numbers: RP09–872–001. Applicants: Arlington Storage Company, LLC. Description: Arlington Storage Co, LLC submits Sub Original Sheet No. 2 et al to FERC Gas Tariff, Original Volume No. 1. Filed Date: 09/03/2009. Accession Number: 20090904–0056. Comment Date: 5 p.m. Eastern Time on Tuesday, September 15, 2009. Docket Numbers: RP00–425–008. Applicants: Southern Star Central Gas Pipeline, Inc. Description: Southern Star Central Gas Pipeline, Inc submits Second Revised Sheet 17 to FERC Gas Tariff, First Revised Volume 1. Filed Date: 09/08/2009. Accession Number: 20090908–0061. Comment Date: 5 p.m. Eastern Time on Monday, September 21, 2009. Docket Numbers: RP09–932–001. Applicants: Monroe Gas Storage Company, LLC. Description: Monroe Gas Storage Company, LLC submits Substitute First Revised Sheet No 182 et al to FERC Gas Tariff, Original Volume No 1. Filed Date: 09/08/2009. Accession Number: 20090909–0158. Comment Date: 5 p.m. Eastern Time on Monday, September 21, 2009. Any person desiring to protest this filing must file in accordance with Rule 211 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211). Protests to this filing will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Such protests must be filed on or before 5 p.m. Eastern time on the specified comment date. Anyone filing a protest must serve a copy of that document on all the parties to the proceeding. The Commission encourages electronic submission of protests in lieu E:\FR\FM\22SEN1.SGM 22SEN1

Agencies

[Federal Register Volume 74, Number 182 (Tuesday, September 22, 2009)]
[Notices]
[Page 48250]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-22714]



[[Page 48250]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13508-000]


Lock+\TM\ Hydro Friends Fund XX, LLC; Notice of Preliminary 
Permit Application Accepted for Filing and Soliciting Comments, Motions 
To Intervene, and Competing Applications

September 15, 2009.
    On June 9, 2009, Lock+\TM\ Hydro Friends Fund XX, LLC filed an 
application for a preliminary permit, pursuant to section 4(f) of the 
Federal Power Act, proposing to study the feasibility of the Muddy 
Waters Hydroelectric Project, located on the Kentucky River, in 
Jessamine and Madison Counties, Kentucky. The sole purpose of a 
preliminary permit, if issued, is to grant the permit holder priority 
to file a license application during the permit term. A preliminary 
permit does not authorize the permit holder to perform any land 
disturbing activities or otherwise enter upon lands or waters owned by 
others without the owners' express permission.
    The proposed project would consist of the following:
    (1) 2 lock frame modules; (2) 18 hydropower turbines; (3) flow 
control doors; (4) a conduit; (5) transmission line; and (6) 
appurtenant facilities. The proposed Muddy Waters Project would have an 
average annual generation of 284,018,400 kilowatt-hours.
    Applicant Contact: Wayne F. Krause, Hydro Green Energy, LLC, 
Lock+\TM\ Hydro Friends Fund, LLC, 5090 Richmond Avenue 390, 
Houston, TX 77056.
    FERC Contact: Allyson Conner, (202) 502-6082.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Comments, motions to intervene, notices of intent, and competing 
applications may be filed electronically via the Internet. See 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
(https://www.ferc.gov/docs-filing/ferconline.asp) under the ``eFiling'' 
link. For a simpler method of submitting text only comments, click on 
``Quick Comment.'' For assistance, please contact FERC Online Support 
at FERCOnlineSupport@ferc.gov; call toll-free at (866) 208-3676; or, 
for TTY, contact (202) 502-8659. Although the Commission strongly 
encourages electronic filing, documents may also be paper-filed. To 
paper-file, mail an original and eight copies to: Kimberly D. Bose, 
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., 
Washington, DC 20426.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of the 
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-13508) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

Kimberly D. Bose,
Secretary.
[FR Doc. E9-22714 Filed 9-21-09; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.