Sierra Energy Company; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 47935 [E9-22470]

Download as PDF erowe on DSK5CLS3C1PROD with NOTICES Federal Register / Vol. 74, No. 180 / Friday, September 18, 2009 / Notices Process for this project has ended. From this time forward, this proceeding will be conducted in Docket No. CP09–460– 000, as noted in the caption of this Notice. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 14 copies of filings made in the proceeding with the Commission and must mail a copy to the applicant and to every other party. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the VerDate Nov<24>2008 15:10 Sep 17, 2009 Jkt 217001 Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the eFiling link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the eLibrary link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: October 1, 2009. Kimberly D. Bose, Secretary. [FR Doc. E9–22465 Filed 9–17–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13560–000] Sierra Energy Company; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications September 10, 2009. On July 23, 2009, and revised on August 27, 2009, Sierra Energy Company filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the North Unit Diversion Dam Project, located on the Deschutes River in Deschutes County, Oregon. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would utilize the existing North Unit Diversion Dam; and would consist of the following new facilities: (1) A diversion structure PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 47935 approximately 100-foot-long, 15-footwide, and 6-foot-deep; (2) an 8- to 10foot-diameter, 150-foot-long penstock; (3) a powerhouse containing two generating units having an installed capacity of 1.8 megawatts; (4) a 500foot-long, 21-kilovolt transmission line; and (5) appurtenant facilities. The proposed project would have an average annual generation of 7.2 gigawatt-hours. Applicant Contact: Bradley Reeves, Sierra Energy Company, P.O. Box 4313, Auburn, CA 95604; phone: (530) 367– 4156. FERC Contact: Gina Krump, (202) 502–6704, gina.krump@ferc.gov. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https:// www.ferc.gov/docs-filing/ferconline.asp) under the ‘‘eFiling’’ link. For a simpler method of submitting text only comments, click on ‘‘Quick Comment.’’ For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY, contact (202) 502–8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and eight copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–13560) in the docket number field to access the document. For assistance, contact FERC Online Support. Kimberly D. Bose, Secretary. [FR Doc. E9–22470 Filed 9–17–09; 8:45 am] BILLING CODE 6717–01–P E:\FR\FM\18SEN1.SGM 18SEN1

Agencies

[Federal Register Volume 74, Number 180 (Friday, September 18, 2009)]
[Notices]
[Page 47935]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-22470]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13560-000]


Sierra Energy Company; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

September 10, 2009.
    On July 23, 2009, and revised on August 27, 2009, Sierra Energy 
Company filed an application for a preliminary permit, pursuant to 
section 4(f) of the Federal Power Act, proposing to study the 
feasibility of the North Unit Diversion Dam Project, located on the 
Deschutes River in Deschutes County, Oregon. The sole purpose of a 
preliminary permit, if issued, is to grant the permit holder priority 
to file a license application during the permit term. A preliminary 
permit does not authorize the permit holder to perform any land 
disturbing activities or otherwise enter upon lands or waters owned by 
others without the owners' express permission.
    The proposed project would utilize the existing North Unit 
Diversion Dam; and would consist of the following new facilities: (1) A 
diversion structure approximately 100-foot-long, 15-foot-wide, and 6-
foot-deep; (2) an 8- to 10-foot-diameter, 150-foot-long penstock; (3) a 
powerhouse containing two generating units having an installed capacity 
of 1.8 megawatts; (4) a 500-foot-long, 21-kilovolt transmission line; 
and (5) appurtenant facilities. The proposed project would have an 
average annual generation of 7.2 gigawatt-hours.
    Applicant Contact: Bradley Reeves, Sierra Energy Company, P.O. Box 
4313, Auburn, CA 95604; phone: (530) 367-4156.
    FERC Contact: Gina Krump, (202) 502-6704, gina.krump@ferc.gov.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Comments, motions to intervene, notices of intent, and competing 
applications may be filed electronically via the Internet. See 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
(https://www.ferc.gov/docs-filing/ferconline.asp) under the ``eFiling'' 
link. For a simpler method of submitting text only comments, click on 
``Quick Comment.'' For assistance, please contact FERC Online Support 
at FERCOnlineSupport@ferc.gov; call toll-free at (866) 208-3676; or, 
for TTY, contact (202) 502-8659. Although the Commission strongly 
encourages electronic filing, documents may also be paper-filed. To 
paper-file, mail an original and eight copies to: Kimberly D. Bose, 
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., 
Washington, DC 20426.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-13560) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

Kimberly D. Bose,
Secretary.
[FR Doc. E9-22470 Filed 9-17-09; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.