Download as PDF Federal Register / Vol. 74, No. 177 / Tuesday, September 15, 2009 / Notices appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on October 5, 2009. Kimberly D. Bose, Secretary. [FR Doc. E9–22088 Filed 9–14–09; 8:45 am] BILLING CODE 6717–01–P 47243 document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on September 15, 2009. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EF09–2011–000] Bonneville Power Administration; Notice of Filing September 8, 2009. Take notice that on September 4, 2009, Bonneville Power Administration (BPA) filed errata corrections to Table E of the General Rate Schedule Provisions of BPA’s 2010 Wholesale Power and Transmission Rate Case filing, WP–10 Wholesale Power Rates, pursuant to the Commission’s regulations, 18 CFR 300.10(h). Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible online at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a Kimberly D. Bose, Secretary. [FR Doc. E9–22086 Filed 9–14–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Sunshine Act Meeting Notice September 10, 2009. The following notice of meeting is published pursuant to section 3(a) of the government in the Sunshine Act (Pub. L. No. 94–409), 5 U.S.C. 552b: AGENCY HOLDING MEETING: Federal Energy Regulatory Commission. DATE AND TIME: September 17, 2009. 10 a.m. PLACE: Room 2C, 888 First Street, NE., Washington, DC 20426. STATUS: Open. MATTERS TO BE CONSIDERED: Agenda. Note—Items listed on the agenda may be deleted without further notice. CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary, Telephone (202) 502–8400. For a recorded message listing items struck from or added to the meeting, call (202) 502–8627. This is a list of matters to be considered by the Commission. It does not include a listing of all documents relevant to the items on the agenda. All public documents, however, may be viewed on line at the Commission’s Web site at https://www.ferc.gov using the eLibrary link, or may be examined in the Commission’s Public Reference Room. 951st—Meeting REGULAR MEETING [September 17, 2009, 10 a.m.] sroberts on DSKD5P82C1PROD with NOTICES Item No. Docket No. Company ADMINISTRATIVE A–1 ............................................................. A–2 ............................................................. AD02–1–000 ............................................. AD02–7–000 ............................................. A–3 ............................................................. AD06–3–000 ............................................. VerDate Nov<24>2008 19:12 Sep 14, 2009 Jkt 217001 PO 00000 Frm 00059 Fmt 4703 Sfmt 4703 Agency Administrative Matters. Customer Matters, Reliability, Security and Market Operations. Energy Market Update. E:\FR\FM\15SEN1.SGM 15SEN1 47244 Federal Register / Vol. 74, No. 177 / Tuesday, September 15, 2009 / Notices REGULAR MEETING—Continued [September 17, 2009, 10 a.m.] Item No. Docket No. Company ELECTRIC E–1 ............................................................. RM05–5–017 ............................................. E–2 ............................................................. E–3 ............................................................. E–4 ............................................................. E–5 ............................................................. E–6 ............................................................. ................................................................ E–7 ............................................................. E–8 ............................................................. E–9 ............................................................. E–10 ........................................................... ................................................................ E–11 ........................................................... E–12 ........................................................... E–13 ........................................................... E–14 ........................................................... OMITTED OMITTED RR09–4–000 ............................................. ER09–1192–000 ....................................... ER09–1247–000 ....................................... ER09–1247–001 ....................................... ER09–240–001 ......................................... NJ09–3–000 .............................................. OMITTED .................................................. ER09–650–001 ......................................... ER09–650–002 ER09–497–001 ......................................... ER08–1317–002 ....................................... ER08–53–000 ........................................... EL08–14–002 ............................................ E–15 ........................................................... ER09–730–002 ......................................... Standards for Business Practices and Communication Protocols for Public Utilities. North American Electric Reliability Corporation. Southwest Power Pool, Inc. California Independent System Operator Corporation. California Independent System Operator Corporation. Big Rivers Electric Corporation. PJM Interconnection, L.L.C. PJM Interconnection, L.L.C. California Independent System Operator Corporation. Termoelectrica U.S., LLC. Black Oak Energy, L.L.C. EPIC Merchant Energy, L.P. and SESCO Enterprises, L.L.C. v. PJM Interconnection, L.L.C. PJM Interconnection, L.L.C. GAS G–1 ............................................................ RM09–21–000 ........................................... G–2 ............................................................ RP08–479–002 ......................................... RP08–479–003 RP08–487–002 ......................................... RP08–487–003 RP07–139–006 ......................................... RP07–139–007 Revised Filing Requirements for Centralized Service Companies Under the Public Utility Holding Company Act of 2005, the Federal Power Act, and the Natural Gas Act. Saltville Gas Storage Company, L.L.C. East Tennessee Natural Gas, LLC. Algonquin Gas Transmission, LLC. HYDRO H–1 ............................................................. H–2 ............................................................. P–2835–031 .............................................. RM09–6–001 ............................................. H–3 ............................................................. H–4 ............................................................. P–12514–029 ............................................ HB131–08–1–000 ..................................... H–5 ............................................................. P–2630–037 .............................................. New York State Electric & Gas Corporation. Update of the Federal Energy Regulatory Commission’s Fees Schedule for Annual Charges for the Use of Government Lands. Northern Indiana Public Service Company. PPL Maine, LLC. PPL Great Works, LLC and Bangor Pacific Hydro Associates. PacifiCorp. CERTIFICATES C–1 ............................................................. sroberts on DSKD5P82C1PROD with NOTICES C–2 ............................................................. C–3 ............................................................. C–4 ............................................................. CP08–6–002 ............................................. CP09–56–000 CP09–110–000 ......................................... CP09–88–000 ........................................... CP08–96–001 ........................................... A free Web cast of this event is available through https://www.ferc.gov. Anyone with Internet access who desires to view this event can do so by navigating to https://www.ferc.gov’s Calendar of Events and locating this event in the Calendar. The event will contain a link to its Web cast. The Capitol Connection provides technical support for the free Web casts. It also offers access to this event via television VerDate Nov<24>2008 19:12 Sep 14, 2009 Jkt 217001 Midcontinent Express Pipeline LLC. Mississippi Hub, LLC. Transcontinental Gas Pipe Line Company, LLC. Arlington Storage Company, LLC. in the DC area and via phone bridge for a fee. If you have any questions, visit https://www.CapitolConnection.org or contact Danelle Springer or David Reininger at 703–993–3100. Immediately following the conclusion of the Commission Meeting, a press briefing will be held in the Commission Meeting Room. Members of the public may view this briefing in the designated overflow room. This statement is PO 00000 Frm 00060 Fmt 4703 Sfmt 4703 intended to notify the public that the press briefings that follow Commission meetings may now be viewed remotely at Commission headquarters, but will not be telecast through the Capitol Connection service. Kimberly D. Bose, Secretary. [FR Doc. E9–22228 Filed 9–11–09; 11:15 am] BILLING CODE P E:\FR\FM\15SEN1.SGM 15SEN1

Agencies

[Federal Register Volume 74, Number 177 (Tuesday, September 15, 2009)]
[Notices]
[Pages 47243-47244]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-22228]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Sunshine Act Meeting Notice

September 10, 2009.
    The following notice of meeting is published pursuant to section 
3(a) of the government in the Sunshine Act (Pub. L. No. 94-409), 5 
U.S.C. 552b:

Agency Holding Meeting:  Federal Energy Regulatory Commission.

Date and Time:  September 17, 2009. 10 a.m.

Place:  Room 2C, 888 First Street, NE., Washington, DC 20426.

Status:  Open.

Matters to be Considered:  Agenda.
 Note--Items listed on the agenda may be deleted without further 
notice.

CONTACT PERSON FOR MORE INFORMATION:  Kimberly D. Bose, Secretary, 
Telephone (202) 502-8400.
    For a recorded message listing items struck from or added to the 
meeting, call (202) 502-8627.
    This is a list of matters to be considered by the Commission. It 
does not include a listing of all documents relevant to the items on 
the agenda. All public documents, however, may be viewed on line at the 
Commission's Web site at https://www.ferc.gov using the eLibrary link, 
or may be examined in the Commission's Public Reference Room.

951st--Meeting

                                                                     Regular Meeting
                                                              [September 17, 2009, 10 a.m.]
--------------------------------------------------------------------------------------------------------------------------------------------------------
                 Item No.                           Docket No.                                               Company
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                     ADMINISTRATIVE
--------------------------------------------------------------------------------------------------------------------------------------------------------
A-1......................................  AD02-1-000..................  Agency Administrative Matters.
A-2......................................  AD02-7-000..................  Customer Matters, Reliability, Security and Market Operations.
A-3......................................  AD06-3-000..................  Energy Market Update.
--------------------------------------------------------------------------------------------------------------------------------------------------------

[[Page 47244]]

 
                                                                        ELECTRIC
--------------------------------------------------------------------------------------------------------------------------------------------------------
E-1......................................  RM05-5-017..................  Standards for Business Practices and Communication Protocols for Public
                                                                          Utilities.
E-2......................................  OMITTED
E-3......................................  OMITTED
E-4......................................  RR09-4-000..................  North American Electric Reliability Corporation.
E-5......................................  ER09-1192-000...............  Southwest Power Pool, Inc.
E-6......................................  ER09-1247-000...............  California Independent System Operator Corporation.
                                           ER09-1247-001...............
E-7......................................  ER09-240-001................  California Independent System Operator Corporation.
E-8......................................  NJ09-3-000..................  Big Rivers Electric Corporation.
E-9......................................  OMITTED.....................
E-10.....................................  ER09-650-001................  PJM Interconnection, L.L.C.
                                           ER09-650-002
E-11.....................................  ER09-497-001................  PJM Interconnection, L.L.C.
E-12.....................................  ER08-1317-002...............  California Independent System Operator Corporation.
E-13.....................................  ER08-53-000.................  Termoelectrica U.S., LLC.
E-14.....................................  EL08-14-002.................  Black Oak Energy, L.L.C.
                                                                         EPIC Merchant Energy, L.P. and SESCO Enterprises, L.L.C. v. PJM
                                                                          Interconnection, L.L.C.
E-15.....................................  ER09-730-002................  PJM Interconnection, L.L.C.
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                           GAS
--------------------------------------------------------------------------------------------------------------------------------------------------------
G-1......................................  RM09-21-000.................  Revised Filing Requirements for Centralized Service Companies Under the Public
                                                                          Utility Holding Company Act of 2005, the Federal Power Act, and the Natural
                                                                          Gas Act.
G-2......................................  RP08-479-002................  Saltville Gas Storage Company, L.L.C.
                                           RP08-479-003
                                           RP08-487-002................  East Tennessee Natural Gas, LLC.
                                           RP08-487-003
                                           RP07-139-006................  Algonquin Gas Transmission, LLC.
                                           RP07-139-007
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                          HYDRO
--------------------------------------------------------------------------------------------------------------------------------------------------------
H-1......................................  P-2835-031..................  New York State Electric & Gas Corporation.
H-2......................................  RM09-6-001..................  Update of the Federal Energy Regulatory Commission's Fees Schedule for Annual
                                                                          Charges for the Use of Government Lands.
H-3......................................  P-12514-029.................  Northern Indiana Public Service Company.
H-4......................................  HB131-08-1-000..............  PPL Maine, LLC.
                                                                         PPL Great Works, LLC and Bangor Pacific Hydro Associates.
H-5......................................  P-2630-037..................  PacifiCorp.
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                      CERTIFICATES
--------------------------------------------------------------------------------------------------------------------------------------------------------
C-1......................................  CP08-6-002..................  Midcontinent Express Pipeline LLC.
                                           CP09-56-000
C-2......................................  CP09-110-000................  Mississippi Hub, LLC.
C-3......................................  CP09-88-000.................  Transcontinental Gas Pipe Line Company, LLC.
C-4......................................  CP08-96-001.................  Arlington Storage Company, LLC.
--------------------------------------------------------------------------------------------------------------------------------------------------------

    A free Web cast of this event is available through https://www.ferc.gov. Anyone with Internet access who desires to view this 
event can do so by navigating to https://www.ferc.gov's Calendar of 
Events and locating this event in the Calendar. The event will contain 
a link to its Web cast. The Capitol Connection provides technical 
support for the free Web casts. It also offers access to this event via 
television in the DC area and via phone bridge for a fee. If you have 
any questions, visit https://www.CapitolConnection.org or contact 
Danelle Springer or David Reininger at 703-993-3100.
    Immediately following the conclusion of the Commission Meeting, a 
press briefing will be held in the Commission Meeting Room. Members of 
the public may view this briefing in the designated overflow room. This 
statement is intended to notify the public that the press briefings 
that follow Commission meetings may now be viewed remotely at 
Commission headquarters, but will not be telecast through the Capitol 
Connection service.


Kimberly D. Bose,
Secretary.
[FR Doc. E9-22228 Filed 9-11-09; 11:15 am]