Turkey Point; Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing, 47278-47280 [E9-22185]
Download as PDF
sroberts on DSKD5P82C1PROD with NOTICES
47278
Federal Register / Vol. 74, No. 177 / Tuesday, September 15, 2009 / Notices
dated June 30 and December 11, 2008,
and January 22, February 17, and July
27, 2009, for proposed amendment to
Facility Operating License Nos. NPF–87
and NPF–89 for the Comanche Peak
Steam Electric Station (CPSES), Units 1
and 2, located in Somervell County,
Texas.
The proposed amendment would
have revised Technical Specification
(TS) 1.0, ‘‘Use and Application’’ and TS
3.7.17, ‘‘Spent Fuel Assembly Storage,’’
for the CPSES, Units 1 and 2.
Specifically, the request was to revise
the rated thermal power from 3458
megawatts thermal (MWT) to 3612
MWT and for approval of the revised
spent fuel pool (SFP) criticality safety
analysis and the associated changes to
TS 3.7.17 for revised spent fuel storage
configurations. By letter dated June 27,
2008 (Agencywide Documents Access
and Management System (ADAMS)
Accession No. ML081510157), the U.S.
Nuclear Regulatory Commission (NRC)
approved changes to TS 1.0, ‘‘Use and
Application’’ to revise the rated thermal
power level from 3458 MWT to 3612
MWT.
The Commission had previously
issued a Notice of Consideration of
Issuance of Amendment published in
the Federal Register on October 23,
2007 (72 FR 60034), for amendments to
TS 1.0 and TS 3.7.17. The amendment
to TS 1.0 to revise the rated thermal
power level from 3458 MWT to 3612
MWT was approved by NRC by letter
dated June 27, 2008. However, by letter
dated August 20, 2009, the licensee
withdrew the proposed change to TS
3.7.17, ‘‘Spent Fuel Assembly Storage.’’
For further details with respect to this
action, see the application for
amendment dated August 28, 2007
application, as supplemented by letters
dated June 30 and December 11, 2008,
and January 22, February 17, and July
27, 2009, and the licensee’s letter dated
August 20, 2009, which withdrew the
application for license amendment to
TS 3.7.17. Documents may be examined,
and/or copied for a fee, at the NRC’s
Public Document Room (PDR), located
at One White Flint North, Public File
Area O1 F21, 11555 Rockville Pike (first
floor), Rockville, Maryland. Publicly
available records will be accessible
electronically from the Agencywide
Documents Access and Management
System (ADAMS) Public Electronic
Reading Room on the Internet at the
NRC Web site, https://www.nrc.gov/
reading-rm/adams.html. Persons who
do not have access to ADAMS or who
encounter problems in accessing the
documents located in ADAMS should
contact the NRC PDR Reference staff by
telephone at 1–800–397–4209, or 301–
VerDate Nov<24>2008
19:12 Sep 14, 2009
Jkt 217001
415–4737 or by e-mail to
pdr.resource@nrc.gov.
Dated at Rockville, Maryland, this 21st day
of August 2009.
For the Nuclear Regulatory Commission.
Balwant K. Singal,
Senior Project Manager, Plant Licensing
Branch IV, Division of Operating Reactor
Licensing, Office of Nuclear Reactor
Regulation.
[FR Doc. E9–22128 Filed 9–14–09; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. 50–250 and 50–251 NRC–
2009–0402]
Turkey Point; Notice of Consideration
of Issuance of Amendment to Facility
Operating License, Proposed No
Significant Hazards Consideration
Determination, and Opportunity for a
Hearing
The U.S. Nuclear Regulatory
Commission (the Commission) is
considering issuance of an amendment
to Facility Operating License No. DPR–
31 and Facility Operating License No.
DPR–41 issued to Florida Power & Light
(FPL, the licensee) for operation of the
Turkey Point, Units 3 and 4 located in
Florida City, Florida.
The proposed amendment would
delay the date specified in License
Amendments 234 and 229 for the
implementation of the Boraflex Remedy
in the Turkey Point Units 3 and 4 spent
fuel pools.
Before issuance of the proposed
license amendment, the Commission
will have made findings required by the
Atomic Energy Act of 1954, as amended
(the Act), and the Commission’s
regulations.
The Commission has made a
proposed determination that the
amendment request involves no
significant hazards consideration. Under
the Commission’s regulations in Title 10
of the Code of Federal Regulations (10
CFR), section 50.92, this means that
operation of the facility in accordance
with the proposed amendment would
not (1) Involve a significant increase in
the probability or consequences of an
accident previously evaluated; or (2)
create the possibility of a new or
different kind of accident from any
accident previously evaluated; or (3)
involve a significant reduction in a
margin of safety. As required by 10 CFR
50.91(a), the licensee has provided its
analysis of the issue of no significant
hazards consideration, which is
presented below:
PO 00000
Frm 00094
Fmt 4703
Sfmt 4703
1. Does the proposed change involve a
significant increase in the probability or
consequences of an accident previously
evaluated?
Response: No.
The proposed license amendments extend
the implementation period specified in
License Amendments 234 and 229. The delay
will allow FPL to continue to work with our
vendor to successfully fabricate the
Metamic® inserts to the design requirements
for insertion until both SFPs [spent fuel
pools] are configured in accordance with the
previously approved Boraflex® Remedy
license amendments.
During this extension period, FPL will
continue to rely on the current Turkey Point
licensing basis, including the presence of
Boraflex®, the continuation of existing
administrative controls, and our currently
approved monitoring and surveillance
program until such time that the Boraflex®
Remedy license amendments are fully
implemented. These measures will continue
to ensure required margins to criticality are
maintained such that the consequences of an
accident are not increased. As the delay in
implementation of the Boraflex® Remedy
does not affect any accident initiation
sequences, the probability of occurrence on
an accident in the SFPs is not increased by
delay in implementation of License
Amendment Nos. 234 and 229. Therefore, the
proposed change does not involve a
significant increase in the probability or
consequences of an accident previously
evaluated.
2. Does the proposed change create the
possibility of a new or different kind of
accident from any previously evaluated?
Response: No.
The proposed license amendments extend
the implementation period specified in
License Amendments 234 and 229. The delay
will allow FPL to continue to work with our
vendor to successfully fabricate the
Metamic® inserts to the design requirements
for insertion until both SFPs are configured
in accordance with the previously approved
Boraflex® Remedy license amendments.
During this extension period, FPL will
continue to rely on the current Turkey Point
licensing basis, including the presence of
Boraflex®, the continuation of existing
administrative controls, and our currently
approved monitoring and surveillance
program until such time that the Boraflex®
Remedy license amendments are fully
implemented. As no unapproved physical
changes to the spent fuel storage cells are
involved with this delay in implementation
of the Boraflex® Remedy, no new failure
modes are created by an extended
implementation date. Therefore, the
proposed change does not create the
possibility of a new or different kind of
accident from any previously evaluated.
3. Does the proposed change involve a
significant reduction in the margin of safety?
Response: No.
The proposed license amendments extend
the implementation period specified in
License Amendments 234 and 229. The delay
will allow FPL to continue to work with our
vendor to successfully fabricate the
Metamic® inserts to the design requirements
E:\FR\FM\15SEN1.SGM
15SEN1
Federal Register / Vol. 74, No. 177 / Tuesday, September 15, 2009 / Notices
sroberts on DSKD5P82C1PROD with NOTICES
for insertion until both SFPs are configured
in accordance with the previously approved
Boraflex® Remedy license amendments.
During this extension period, FPL will
continue to rely on the current Turkey Point
licensing basis, including the presence of
Boraflex®, the continuation of existing
administrative controls, and our currently
approved monitoring and surveillance
program until such time that the Boraflex®
Remedy license amendments are fully
implemented. These measures will continue
to ensure required margins to criticality are
maintained. As no unapproved physical
changes to the spent fuel storage cells are
involved with this delay in implementation
of the Boraflex® Remedy and since Boraflex®
degradation will continue to be closely
monitored to ensure acceptable margins to
criticality are maintained, the proposed
change does not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the
licensee’s analysis and, based on this
review, it appears that the three
standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff
proposes to determine that the
amendment request involves no
significant hazards consideration.
The Commission is seeking public
comments on this proposed
determination. Any comments received
within 30 days after the date of
publication of this notice will be
considered in making any final
determination.
Normally, the Commission will not
issue the amendment until the
expiration of 60 days after the date of
publication of this notice. The
Commission may issue the license
amendment before expiration of the 60day period provided that its final
determination is that the amendment
involves no significant hazards
consideration. In addition, the
Commission may issue the amendment
prior to the expiration of the 30-day
comment period should circumstances
change during the 30-day comment
period such that failure to act in a
timely way would result, for example,
in derating or shutdown of the facility.
Should the Commission take action
prior to the expiration of either the
comment period or the notice period, it
will publish in the Federal Register a
notice of issuance. Should the
Commission make a final No Significant
Hazards Consideration Determination,
any hearing will take place after
issuance. The Commission expects that
the need to take this action will occur
very infrequently.
Written comments may be submitted
by mail to the Chief, Rulemaking and
Directives Branch (RDB), TWB–05–
B01M, Division of Administrative
Services, Office of Administration, U.S.
VerDate Nov<24>2008
19:12 Sep 14, 2009
Jkt 217001
Nuclear Regulatory Commission,
Washington, DC 20555–0001, and
should cite the publication date and
page number of this Federal Register
notice. Written comments may also be
faxed to the RDB at 301–492–3446.
Documents may be examined, and/or
copied for a fee, at the NRC’s Public
Document Room (PDR), located at One
White Flint North, Public File Area O1
F21, 11555 Rockville Pike (first floor),
Rockville, Maryland.
Within 60 days after the date of
publication of this notice, any person(s)
whose interest may be affected by this
action may file a request for a hearing
and a petition to intervene with respect
to issuance of the amendment to the
subject facility operating license.
Requests for a hearing and a petition for
leave to intervene shall be filed in
accordance with the Commission’s
‘‘Rules of Practice for Domestic
Licensing Proceedings’’ in 10 CFR part
2. Interested person(s) should consult a
current copy of 10 CFR 2.309, which is
available at the Commission’s PDR,
located at One White Flint North, Public
File Area O1F21, 11555 Rockville Pike
(first floor), Rockville, Maryland.
Publicly available records will be
accessible from the Agencywide
Documents Access and Management
System’s (ADAMS) Public Electronic
Reading Room on the Internet at the
NRC Web site, https://www.nrc.gov/
reading-rm/doc-collections/cfr/. If a
request for a hearing or petition for
leave to intervene is filed by the above
date, the Commission or a presiding
officer designated by the Commission or
by the Chief Administrative Judge of the
Atomic Safety and Licensing Board
Panel, will rule on the request and/or
petition; and the Secretary or the Chief
Administrative Judge of the Atomic
Safety and Licensing Board will issue a
notice of a hearing or an appropriate
order.
As required by 10 CFR 2.309, a
petition for leave to intervene shall set
forth with particularity the interest of
the petitioner in the proceeding, and
how that interest may be affected by the
results of the proceeding. The petition
should specifically explain the reasons
why intervention should be permitted
with particular reference to the
following general requirements: (1) The
name, address and telephone number of
the requestor or petitioner; (2) the
nature of the requestor’s/petitioner’s
right under the Act to be made a party
to the proceeding; (3) the nature and
extent of the requestor’s/petitioner’s
property, financial, or other interest in
the proceeding; and (4) the possible
effect of any decision or order which
may be entered in the proceeding on the
PO 00000
Frm 00095
Fmt 4703
Sfmt 4703
47279
requestor’s/petitioner’s interest. The
petition must also identify the specific
contentions which the petitioner/
requestor seeks to have litigated at the
proceeding.
Each contention must consist of a
specific statement of the issue of law or
fact to be raised or controverted. In
addition, the petitioner/requestor shall
provide a brief explanation of the bases
for the contention and a concise
statement of the alleged facts or expert
opinion which support the contention
and on which the petitioner intends to
rely in proving the contention at the
hearing. The petitioner/requestor must
also provide references to those specific
sources and documents of which the
petitioner is aware and on which the
petitioner intends to rely to establish
those facts or expert opinion. The
petition must include sufficient
information to show that a genuine
dispute exists with the applicant on a
material issue of law or fact.
Contentions shall be limited to matters
within the scope of the amendment
under consideration. The contention
must be one which, if proven, would
entitle the petitioner to relief. A
petitioner/requestor who fails to satisfy
these requirements with respect to at
least one contention will not be
permitted to participate as a party.
Those permitted to intervene become
parties to the proceeding, subject to any
limitations in the order granting leave to
intervene, and have the opportunity to
participate fully in the conduct of the
hearing.
If a hearing is requested, the
Commission will make a final
determination on the issue of no
significant hazards consideration. The
final determination will serve to decide
when the hearing is held. If the final
determination is that the amendment
request involves no significant hazards
consideration, the Commission may
issue the amendment and make it
immediately effective, notwithstanding
the request for a hearing. Any hearing
held would take place after issuance of
the amendment. If the final
determination is that the amendment
request involves a significant hazards
consideration, any hearing held would
take place before the issuance of any
amendment.
All documents filed in NRC
adjudicatory proceedings, including a
request for hearing, a petition for leave
to intervene, any motion or other
document filed in the proceeding prior
to the submission of a request for
hearing or petition to intervene, and
documents filed by interested
governmental entities participating
under 10 CFR 2.315(c), must be filed in
E:\FR\FM\15SEN1.SGM
15SEN1
sroberts on DSKD5P82C1PROD with NOTICES
47280
Federal Register / Vol. 74, No. 177 / Tuesday, September 15, 2009 / Notices
accordance with the NRC E–Filing rule,
which the NRC promulgated in August
28, 2007 (72 FR 49139). The E–Filing
process requires participants to submit
and serve all adjudicatory documents
over the Internet, or in some cases to
mail copies on electronic storage media.
Participants may not submit paper
copies of their filings unless they seek
an exemption in accordance with the
procedures described below.
To comply with the procedural
requirements of E–Filing, at least ten
(10) days prior to the filing deadline, the
petitioner/requestor must contact the
Office of the Secretary by e-mail at
hearing.docket@nrc.gov, or by calling
(301) 415–1677, to request (1) A digital
ID certificate, which allows the
participant (or its counsel or
representative) to digitally sign
documents and access the E–Submittal
server for any proceeding in which it is
participating; and/or (2) creation of an
electronic docket for the proceeding
(even in instances in which the
petitioner/requestor (or its counsel or
representative) already holds an NRCissued digital ID certificate). Each
petitioner/requestor will need to
download the Workplace Forms
ViewerTM to access the Electronic
Information Exchange (EIE), a
component of the E–Filing system. The
Workplace Forms ViewerTM is free and
is available at https://www.nrc.gov/sitehelp/e-submittals/install-viewer.html.
Information about applying for a digital
ID certificate is available on NRC’s
public Web site at https://www.nrc.gov/
site-help/e-submittals/applycertificates.html.
Once a petitioner/requestor has
obtained a digital ID certificate, had a
docket created, and downloaded the EIE
viewer, it can then submit a request for
hearing or petition for leave to
intervene. Submissions should be in
Portable Document Format (PDF) in
accordance with NRC guidance
available on the NRC public Web site at
https://www.nrc.gov/site-help/
e-submittals.html. A filing is considered
complete at the time the filer submits its
documents through EIE. To be timely,
an electronic filing must be submitted to
the EIE system no later than 11:59 p.m.
Eastern Time on the due date. Upon
receipt of a transmission, the E–Filing
system time-stamps the document and
sends the submitter an e-mail notice
confirming receipt of the document. The
EIE system also distributes an e-mail
notice that provides access to the
document to the NRC Office of the
General Counsel and any others who
have advised the Office of the Secretary
that they wish to participate in the
proceeding, so that the filer need not
VerDate Nov<24>2008
19:12 Sep 14, 2009
Jkt 217001
serve the documents on those
participants separately. Therefore,
applicants and other participants (or
their counsel or representative) must
apply for and receive a digital ID
certificate before a hearing request/
petition to intervene is filed so that they
can obtain access to the document via
the E–Filing system.
A person filing electronically using
the agency’s adjudicatory e-filing system
may seek assistance through the
‘‘Contact Us’’ link located on the NRC
Web site at https://www.nrc.gov/
site-help/e-submittals.html or by calling
the NRC Meta-System Help Desk, which
is available between 8 a.m. and 8 p.m.,
Eastern Time, Monday through Friday,
excluding government holidays. The
Meta-System Help Desk can be
contacted by telephone at 1–866–672–
7640 or by e-mail at
MSHD.Resource@nrc.gov.
Participants who believe that they
have a good cause for not submitting
documents electronically must file an
exemption request, in accordance with
10 CFR 2.302(g), with their initial paper
filing requesting authorization to
continue to submit documents in paper
format. Such filings must be submitted
by: (1) First class mail addressed to the
Office of the Secretary of the
Commission, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, Attention: Rulemaking and
Adjudications Staff; or (2) courier,
express mail, or expedited delivery
service to the Office of the Secretary,
Sixteenth Floor, One White Flint North,
11555 Rockville Pike, Rockville,
Maryland, 20852, Attention:
Rulemaking and Adjudications Staff.
Participants filing a document in this
manner are responsible for serving the
document on all other participants.
Filing is considered complete by firstclass mail as of the time of deposit in
the mail, or by courier, express mail, or
expedited delivery service upon
depositing the document with the
provider of the service.
Non-timely requests and/or petitions
and contentions will not be entertained
absent a determination by the
Commission, the presiding officer, or
the Atomic Safety and Licensing Board
that the request and/or petition should
be granted and/or the contentions
should be admitted, based on a
balancing of the factors specified in 10
CFR 2.309(c)(1)(i)-(viii).
Documents submitted in adjudicatory
proceedings will appear in NRC’s
electronic hearing docket which is
available to the public at https://
ehd.nrc.gov/ehd_proceeding/home.asp,
unless excluded pursuant to an order of
the Commission, an Atomic Safety and
PO 00000
Frm 00096
Fmt 4703
Sfmt 4703
Licensing Board, or a Presiding Officer.
Participants are requested not to include
personal privacy information, such as
social security numbers, home
addresses, or home phone numbers in
their filings, unless an NRC regulation
or other law requires submission of such
information. With respect to
copyrighted works, except for limited
excerpts that serve the purpose of the
adjudicatory filings and would
constitute a Fair Use application,
participants are requested not to include
copyrighted materials in their
submissions.
For further details with respect to this
license amendment application, see the
application for amendment dated [date],
which is available for public inspection
at the Commission’s PDR, located at
One White Flint North, File Public Area
O1 F21, 11555 Rockville Pike (first
floor), Rockville, Maryland. Publicly
available records will be accessible
electronically from the Agencywide
Documents Access and Management
System’s (ADAMS) Public Electronic
Reading Room on the Internet at the
NRC Web site, https://www.nrc.gov/
reading-rm/adams.html. Persons who
do not have access to ADAMS or who
encounter problems in accessing the
documents located in ADAMS, should
contact the NRC PDR Reference staff by
telephone at 1–800–397–4209, 301–
415–4737, or by e-mail to
pdr.resource@nrc.gov.
Attorney for licensee: M.S. Ross,
Attorney, Florida Power & Light, P.O.
Box 14000, Juno Beach, Florida 33408–
0420.
Dated at Rockville, Maryland, this 8th day
of September 2009.
For the Nuclear Regulatory Commission.
Brenda L. Mozafari,
Senior Project Manager, Plant Licensing
Branch II–2, Division of Operating Reactor
Licensing, Office of Nuclear Reactor
Regulation.
[FR Doc. E9–22185 Filed 9–14–09; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2009–0396]
Draft Regulatory Guide: Issuance,
Availability
AGENCY: Nuclear Regulatory
Commission.
ACTION: Notice of Issuance and
Availability of Draft Regulatory Guide,
DG–2001.
FOR FURTHER INFORMATION CONTACT:
A. Jervey, U.S. Nuclear Regulatory
E:\FR\FM\15SEN1.SGM
15SEN1
R.
Agencies
[Federal Register Volume 74, Number 177 (Tuesday, September 15, 2009)]
[Notices]
[Pages 47278-47280]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-22185]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 50-250 and 50-251 NRC-2009-0402]
Turkey Point; Notice of Consideration of Issuance of Amendment to
Facility Operating License, Proposed No Significant Hazards
Consideration Determination, and Opportunity for a Hearing
The U.S. Nuclear Regulatory Commission (the Commission) is
considering issuance of an amendment to Facility Operating License No.
DPR-31 and Facility Operating License No. DPR-41 issued to Florida
Power & Light (FPL, the licensee) for operation of the Turkey Point,
Units 3 and 4 located in Florida City, Florida.
The proposed amendment would delay the date specified in License
Amendments 234 and 229 for the implementation of the Boraflex Remedy in
the Turkey Point Units 3 and 4 spent fuel pools.
Before issuance of the proposed license amendment, the Commission
will have made findings required by the Atomic Energy Act of 1954, as
amended (the Act), and the Commission's regulations.
The Commission has made a proposed determination that the amendment
request involves no significant hazards consideration. Under the
Commission's regulations in Title 10 of the Code of Federal Regulations
(10 CFR), section 50.92, this means that operation of the facility in
accordance with the proposed amendment would not (1) Involve a
significant increase in the probability or consequences of an accident
previously evaluated; or (2) create the possibility of a new or
different kind of accident from any accident previously evaluated; or
(3) involve a significant reduction in a margin of safety. As required
by 10 CFR 50.91(a), the licensee has provided its analysis of the issue
of no significant hazards consideration, which is presented below:
1. Does the proposed change involve a significant increase in
the probability or consequences of an accident previously evaluated?
Response: No.
The proposed license amendments extend the implementation period
specified in License Amendments 234 and 229. The delay will allow
FPL to continue to work with our vendor to successfully fabricate
the Metamic[supreg] inserts to the design requirements for insertion
until both SFPs [spent fuel pools] are configured in accordance with
the previously approved Boraflex[supreg] Remedy license amendments.
During this extension period, FPL will continue to rely on the
current Turkey Point licensing basis, including the presence of
Boraflex[supreg], the continuation of existing administrative
controls, and our currently approved monitoring and surveillance
program until such time that the Boraflex[supreg] Remedy license
amendments are fully implemented. These measures will continue to
ensure required margins to criticality are maintained such that the
consequences of an accident are not increased. As the delay in
implementation of the Boraflex[supreg] Remedy does not affect any
accident initiation sequences, the probability of occurrence on an
accident in the SFPs is not increased by delay in implementation of
License Amendment Nos. 234 and 229. Therefore, the proposed change
does not involve a significant increase in the probability or
consequences of an accident previously evaluated.
2. Does the proposed change create the possibility of a new or
different kind of accident from any previously evaluated?
Response: No.
The proposed license amendments extend the implementation period
specified in License Amendments 234 and 229. The delay will allow
FPL to continue to work with our vendor to successfully fabricate
the Metamic[supreg] inserts to the design requirements for insertion
until both SFPs are configured in accordance with the previously
approved Boraflex[supreg] Remedy license amendments.
During this extension period, FPL will continue to rely on the
current Turkey Point licensing basis, including the presence of
Boraflex[supreg], the continuation of existing administrative
controls, and our currently approved monitoring and surveillance
program until such time that the Boraflex[supreg] Remedy license
amendments are fully implemented. As no unapproved physical changes
to the spent fuel storage cells are involved with this delay in
implementation of the Boraflex[supreg] Remedy, no new failure modes
are created by an extended implementation date. Therefore, the
proposed change does not create the possibility of a new or
different kind of accident from any previously evaluated.
3. Does the proposed change involve a significant reduction in
the margin of safety?
Response: No.
The proposed license amendments extend the implementation period
specified in License Amendments 234 and 229. The delay will allow
FPL to continue to work with our vendor to successfully fabricate
the Metamic[supreg] inserts to the design requirements
[[Page 47279]]
for insertion until both SFPs are configured in accordance with the
previously approved Boraflex[supreg] Remedy license amendments.
During this extension period, FPL will continue to rely on the
current Turkey Point licensing basis, including the presence of
Boraflex[supreg], the continuation of existing administrative
controls, and our currently approved monitoring and surveillance
program until such time that the Boraflex[supreg] Remedy license
amendments are fully implemented. These measures will continue to
ensure required margins to criticality are maintained. As no
unapproved physical changes to the spent fuel storage cells are
involved with this delay in implementation of the Boraflex[supreg]
Remedy and since Boraflex[supreg] degradation will continue to be
closely monitored to ensure acceptable margins to criticality are
maintained, the proposed change does not involve a significant
reduction in a margin of safety.
The NRC staff has reviewed the licensee's analysis and, based on
this review, it appears that the three standards of 10 CFR 50.92(c) are
satisfied. Therefore, the NRC staff proposes to determine that the
amendment request involves no significant hazards consideration.
The Commission is seeking public comments on this proposed
determination. Any comments received within 30 days after the date of
publication of this notice will be considered in making any final
determination.
Normally, the Commission will not issue the amendment until the
expiration of 60 days after the date of publication of this notice. The
Commission may issue the license amendment before expiration of the 60-
day period provided that its final determination is that the amendment
involves no significant hazards consideration. In addition, the
Commission may issue the amendment prior to the expiration of the 30-
day comment period should circumstances change during the 30-day
comment period such that failure to act in a timely way would result,
for example, in derating or shutdown of the facility. Should the
Commission take action prior to the expiration of either the comment
period or the notice period, it will publish in the Federal Register a
notice of issuance. Should the Commission make a final No Significant
Hazards Consideration Determination, any hearing will take place after
issuance. The Commission expects that the need to take this action will
occur very infrequently.
Written comments may be submitted by mail to the Chief, Rulemaking
and Directives Branch (RDB), TWB-05-B01M, Division of Administrative
Services, Office of Administration, U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, and should cite the publication date and
page number of this Federal Register notice. Written comments may also
be faxed to the RDB at 301-492-3446. Documents may be examined, and/or
copied for a fee, at the NRC's Public Document Room (PDR), located at
One White Flint North, Public File Area O1 F21, 11555 Rockville Pike
(first floor), Rockville, Maryland.
Within 60 days after the date of publication of this notice, any
person(s) whose interest may be affected by this action may file a
request for a hearing and a petition to intervene with respect to
issuance of the amendment to the subject facility operating license.
Requests for a hearing and a petition for leave to intervene shall be
filed in accordance with the Commission's ``Rules of Practice for
Domestic Licensing Proceedings'' in 10 CFR part 2. Interested person(s)
should consult a current copy of 10 CFR 2.309, which is available at
the Commission's PDR, located at One White Flint North, Public File
Area O1F21, 11555 Rockville Pike (first floor), Rockville, Maryland.
Publicly available records will be accessible from the Agencywide
Documents Access and Management System's (ADAMS) Public Electronic
Reading Room on the Internet at the NRC Web site, https://www.nrc.gov/reading-rm/doc-collections/cfr/. If a request for a hearing or petition
for leave to intervene is filed by the above date, the Commission or a
presiding officer designated by the Commission or by the Chief
Administrative Judge of the Atomic Safety and Licensing Board Panel,
will rule on the request and/or petition; and the Secretary or the
Chief Administrative Judge of the Atomic Safety and Licensing Board
will issue a notice of a hearing or an appropriate order.
As required by 10 CFR 2.309, a petition for leave to intervene
shall set forth with particularity the interest of the petitioner in
the proceeding, and how that interest may be affected by the results of
the proceeding. The petition should specifically explain the reasons
why intervention should be permitted with particular reference to the
following general requirements: (1) The name, address and telephone
number of the requestor or petitioner; (2) the nature of the
requestor's/petitioner's right under the Act to be made a party to the
proceeding; (3) the nature and extent of the requestor's/petitioner's
property, financial, or other interest in the proceeding; and (4) the
possible effect of any decision or order which may be entered in the
proceeding on the requestor's/petitioner's interest. The petition must
also identify the specific contentions which the petitioner/requestor
seeks to have litigated at the proceeding.
Each contention must consist of a specific statement of the issue
of law or fact to be raised or controverted. In addition, the
petitioner/requestor shall provide a brief explanation of the bases for
the contention and a concise statement of the alleged facts or expert
opinion which support the contention and on which the petitioner
intends to rely in proving the contention at the hearing. The
petitioner/requestor must also provide references to those specific
sources and documents of which the petitioner is aware and on which the
petitioner intends to rely to establish those facts or expert opinion.
The petition must include sufficient information to show that a genuine
dispute exists with the applicant on a material issue of law or fact.
Contentions shall be limited to matters within the scope of the
amendment under consideration. The contention must be one which, if
proven, would entitle the petitioner to relief. A petitioner/requestor
who fails to satisfy these requirements with respect to at least one
contention will not be permitted to participate as a party.
Those permitted to intervene become parties to the proceeding,
subject to any limitations in the order granting leave to intervene,
and have the opportunity to participate fully in the conduct of the
hearing.
If a hearing is requested, the Commission will make a final
determination on the issue of no significant hazards consideration. The
final determination will serve to decide when the hearing is held. If
the final determination is that the amendment request involves no
significant hazards consideration, the Commission may issue the
amendment and make it immediately effective, notwithstanding the
request for a hearing. Any hearing held would take place after issuance
of the amendment. If the final determination is that the amendment
request involves a significant hazards consideration, any hearing held
would take place before the issuance of any amendment.
All documents filed in NRC adjudicatory proceedings, including a
request for hearing, a petition for leave to intervene, any motion or
other document filed in the proceeding prior to the submission of a
request for hearing or petition to intervene, and documents filed by
interested governmental entities participating under 10 CFR 2.315(c),
must be filed in
[[Page 47280]]
accordance with the NRC E-Filing rule, which the NRC promulgated in
August 28, 2007 (72 FR 49139). The E-Filing process requires
participants to submit and serve all adjudicatory documents over the
Internet, or in some cases to mail copies on electronic storage media.
Participants may not submit paper copies of their filings unless they
seek an exemption in accordance with the procedures described below.
To comply with the procedural requirements of E-Filing, at least
ten (10) days prior to the filing deadline, the petitioner/requestor
must contact the Office of the Secretary by e-mail at
hearing.docket@nrc.gov, or by calling (301) 415-1677, to request (1) A
digital ID certificate, which allows the participant (or its counsel or
representative) to digitally sign documents and access the E-Submittal
server for any proceeding in which it is participating; and/or (2)
creation of an electronic docket for the proceeding (even in instances
in which the petitioner/requestor (or its counsel or representative)
already holds an NRC-issued digital ID certificate). Each petitioner/
requestor will need to download the Workplace Forms ViewerTM
to access the Electronic Information Exchange (EIE), a component of the
E-Filing system. The Workplace Forms ViewerTM is free and is
available at https://www.nrc.gov/site-help/e-submittals/install-viewer.html. Information about applying for a digital ID certificate is
available on NRC's public Web site at https://www.nrc.gov/site-help/e-submittals/apply-certificates.html.
Once a petitioner/requestor has obtained a digital ID certificate,
had a docket created, and downloaded the EIE viewer, it can then submit
a request for hearing or petition for leave to intervene. Submissions
should be in Portable Document Format (PDF) in accordance with NRC
guidance available on the NRC public Web site at https://www.nrc.gov/site-help/e-submittals.html. A filing is considered complete at the
time the filer submits its documents through EIE. To be timely, an
electronic filing must be submitted to the EIE system no later than
11:59 p.m. Eastern Time on the due date. Upon receipt of a
transmission, the E-Filing system time-stamps the document and sends
the submitter an e-mail notice confirming receipt of the document. The
EIE system also distributes an e-mail notice that provides access to
the document to the NRC Office of the General Counsel and any others
who have advised the Office of the Secretary that they wish to
participate in the proceeding, so that the filer need not serve the
documents on those participants separately. Therefore, applicants and
other participants (or their counsel or representative) must apply for
and receive a digital ID certificate before a hearing request/petition
to intervene is filed so that they can obtain access to the document
via the E-Filing system.
A person filing electronically using the agency's adjudicatory e-
filing system may seek assistance through the ``Contact Us'' link
located on the NRC Web site at https://www.nrc.gov/site-help/e-submittals.html or by calling the NRC Meta-System Help Desk, which is
available between 8 a.m. and 8 p.m., Eastern Time, Monday through
Friday, excluding government holidays. The Meta-System Help Desk can be
contacted by telephone at 1-866-672-7640 or by e-mail at
MSHD.Resource@nrc.gov.
Participants who believe that they have a good cause for not
submitting documents electronically must file an exemption request, in
accordance with 10 CFR 2.302(g), with their initial paper filing
requesting authorization to continue to submit documents in paper
format. Such filings must be submitted by: (1) First class mail
addressed to the Office of the Secretary of the Commission, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention:
Rulemaking and Adjudications Staff; or (2) courier, express mail, or
expedited delivery service to the Office of the Secretary, Sixteenth
Floor, One White Flint North, 11555 Rockville Pike, Rockville,
Maryland, 20852, Attention: Rulemaking and Adjudications Staff.
Participants filing a document in this manner are responsible for
serving the document on all other participants. Filing is considered
complete by first-class mail as of the time of deposit in the mail, or
by courier, express mail, or expedited delivery service upon depositing
the document with the provider of the service.
Non-timely requests and/or petitions and contentions will not be
entertained absent a determination by the Commission, the presiding
officer, or the Atomic Safety and Licensing Board that the request and/
or petition should be granted and/or the contentions should be
admitted, based on a balancing of the factors specified in 10 CFR
2.309(c)(1)(i)-(viii).
Documents submitted in adjudicatory proceedings will appear in
NRC's electronic hearing docket which is available to the public at
https://ehd.nrc.gov/ehd_proceeding/home.asp, unless excluded pursuant
to an order of the Commission, an Atomic Safety and Licensing Board, or
a Presiding Officer. Participants are requested not to include personal
privacy information, such as social security numbers, home addresses,
or home phone numbers in their filings, unless an NRC regulation or
other law requires submission of such information. With respect to
copyrighted works, except for limited excerpts that serve the purpose
of the adjudicatory filings and would constitute a Fair Use
application, participants are requested not to include copyrighted
materials in their submissions.
For further details with respect to this license amendment
application, see the application for amendment dated [date], which is
available for public inspection at the Commission's PDR, located at One
White Flint North, File Public Area O1 F21, 11555 Rockville Pike (first
floor), Rockville, Maryland. Publicly available records will be
accessible electronically from the Agencywide Documents Access and
Management System's (ADAMS) Public Electronic Reading Room on the
Internet at the NRC Web site, https://www.nrc.gov/reading-rm/adams.html.
Persons who do not have access to ADAMS or who encounter problems in
accessing the documents located in ADAMS, should contact the NRC PDR
Reference staff by telephone at 1-800-397-4209, 301-415-4737, or by e-
mail to pdr.resource@nrc.gov.
Attorney for licensee: M.S. Ross, Attorney, Florida Power & Light,
P.O. Box 14000, Juno Beach, Florida 33408-0420.
Dated at Rockville, Maryland, this 8th day of September 2009.
For the Nuclear Regulatory Commission.
Brenda L. Mozafari,
Senior Project Manager, Plant Licensing Branch II-2, Division of
Operating Reactor Licensing, Office of Nuclear Reactor Regulation.