Lock + TM Hydro Friends Fund XXVII, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 47236 [E9-22095]
Download as PDF
sroberts on DSKD5P82C1PROD with NOTICES
47236
Federal Register / Vol. 74, No. 177 / Tuesday, September 15, 2009 / Notices
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following: (1) A new concrete and
rock face dam approximately 500-feetlong and 90-feet-high at the outlet of the
Lower Sweetheart Lake; (2) utilizing the
existing impoundment of Lower
Sweetheart Lake and raising the surface
elevation to 629 feet, surface area to
1,635 acres, and storage capacity to
129,693 acre-feet; (3) a proposed 9-footdiameter and 1,650-feet-long penstock
connecting to the powerhouse; (4) a
proposed powerhouse containing two
new generating units having an installed
capacity of 30-megawatts; (5) a proposed
tailrace; (6) a proposed 138-kilovolt
transmission line; and (7) appurtenant
facilities. The proposed Sweetheart Lake
Project would have an average annual
generation of 136 gigawatt-hours.
Applicant Contact: Duff Mitchell,
Business Manager, Juneau Hydropower,
Inc., P.O. Box 22775, Juneau, AK 99802;
phone: (907) 789–2775.
FERC Contact: Gina Krump,
Gina.Krump@ferc.gov, (202) 502–6704.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site (https://
www.ferc.gov/docs-filing/ferconline.asp)
under the ‘‘eFiling’’ link. For a simpler
method of submitting text only
comments, click on ‘‘Quick Comment.’’
For assistance, please contact FERC
Online Support at
FERCOnlineSupport@ferc.gov; call tollfree at (866) 208–3676; or, for TTY,
contact (202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and eight copies to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s website at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–13563) in
the docket number field to access the
VerDate Nov<24>2008
19:12 Sep 14, 2009
Jkt 217001
document. For assistance, contact FERC
Online Support.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–22098 Filed 9–14–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13533–000]
Lock + TM Hydro Friends Fund XXVII,
LLC; Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
September 4, 2009.
On July 6, 2009, Lock + TM Hydro
Friends Fund XXVII, LLC, filed an
application, pursuant to section 4(f) of
the Federal Power Act, proposing to
study the feasibility of the Redd Foxx
Hydroelectric Project, to be located on
the Fox River, in Winnebago County,
Wisconsin.
The proposed Redd Foxx Project
would be located at the U.S. Army
Corps of Engineers Fox River Menasha
Locks Dam near Menasha, Wisconsin.
The proposed project would consist
of: (1) One new underwater frame
module containing nine turbines with a
total installed capacity of about 4.73
megawatts which would be installed
east of the dam in a conduit located
adjacent to the Corps’ active lock; (2) a
new removable lock door; (3) a new
switchyard, transformer, and control
room; (4) a new 1000-foot-long, 36.7
kilovolt transmission line, which would
deliver power from the turbines to an
existing transformer tie-in bus located at
the Corps’ lock and dam facilities; and
(5) appurtenant facilities. The Redd
Foxx Project would have an estimated
average annual generation of about
37,278 megawatts-hours, which would
be sold to a local utility.
Applicant Contact: Mr. Wayne F.
Krouse, Chairman & CEO, Hydro Green
Energy, LLC and Managing Partner,
Lock+ Hydro Friends Fund XXVII, 5090
Richmond Avenue #390, Houston, TX
77056, 877–556–6566 x709,
wayne@hgenergy.com.
FERC Contact: John Ramer, (202) 502–
8969.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
PO 00000
Frm 00052
Fmt 4703
Sfmt 4703
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–13533) in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–22095 Filed 9–14–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13512–000]
Port Frederick Tidal Power Project;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
September 4, 2009.
On August 7, 2009, Alaska Power &
Telephone Company filed an
application for a preliminary permit,
pursuant to section 4(f) of the Federal
Power Act, proposing to study the
feasibility of the Port Frederick Tidal
Power Project (Port Frederick Project or
project), which would be located on
South Bight and North Bight (bays) in
Port Frederick, an inlet off Icy Strait
near Hoonah, Alaska. The sole purpose
of a preliminary permit, if issued, is to
grant the permit holder priority to file
a license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: (1) A proposed 25-foothigh, 400-foot-long earth-and-rock fill
embankment closure dike across a
narrow channel of South Bight; (2) a
E:\FR\FM\15SEN1.SGM
15SEN1
Agencies
[Federal Register Volume 74, Number 177 (Tuesday, September 15, 2009)]
[Notices]
[Page 47236]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-22095]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13533-000]
Lock + TM Hydro Friends Fund XXVII, LLC; Notice of Preliminary
Permit Application Accepted for Filing and Soliciting Comments, Motions
To Intervene, and Competing Applications
September 4, 2009.
On July 6, 2009, Lock + TM Hydro Friends Fund XXVII, LLC, filed an
application, pursuant to section 4(f) of the Federal Power Act,
proposing to study the feasibility of the Redd Foxx Hydroelectric
Project, to be located on the Fox River, in Winnebago County,
Wisconsin.
The proposed Redd Foxx Project would be located at the U.S. Army
Corps of Engineers Fox River Menasha Locks Dam near Menasha, Wisconsin.
The proposed project would consist of: (1) One new underwater frame
module containing nine turbines with a total installed capacity of
about 4.73 megawatts which would be installed east of the dam in a
conduit located adjacent to the Corps' active lock; (2) a new removable
lock door; (3) a new switchyard, transformer, and control room; (4) a
new 1000-foot-long, 36.7 kilovolt transmission line, which would
deliver power from the turbines to an existing transformer tie-in bus
located at the Corps' lock and dam facilities; and (5) appurtenant
facilities. The Redd Foxx Project would have an estimated average
annual generation of about 37,278 megawatts-hours, which would be sold
to a local utility.
Applicant Contact: Mr. Wayne F. Krouse, Chairman & CEO, Hydro Green
Energy, LLC and Managing Partner, Lock+ Hydro Friends Fund XXVII, 5090
Richmond Avenue 390, Houston, TX 77056, 877-556-6566 x709,
wayne@hgenergy.com.
FERC Contact: John Ramer, (202) 502-8969.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Comments, motions to intervene, notices of intent, and competing
applications may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and eight
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For
more information on how to submit these types of filings please go to
the Commission's Web site located at https://www.ferc.gov/filing-comments.asp. More information about this project can be viewed or
printed on the ``eLibrary'' link of Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-
13533) in the docket number field to access the document. For
assistance, call toll-free 1-866-208-3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-22095 Filed 9-14-09; 8:45 am]