Environmental Impact Statements; Notice of Availability, 46770 [E9-21944]

Download as PDF 46770 Federal Register / Vol. 74, No. 175 / Friday, September 11, 2009 / Notices EIS No. 20090282, ERP No. F–FRC– D05126–VA, Smith Mountain Pumped Storage Project (FERC No. 2210–169). Application for Hydropower License to continue Operating the 636-megawatt Pumped Storage Project, Roanoke River, Smith Mountain Pumped Storage Project (FERC No. 2210–169). Application for Hydropower License to continue Operating the 636-megawatt Pumped Storage Project, Roanoke River, Bedford, Campbell, Franklin, and Pittsylvania Counties, VA Summary: EPA expressed environmental concerns about water temperature, aquatic life and wetland impacts. EPA requested additional information on avoidance, minimization, and mitigation measures for the above impacts. EIS No. 20090293, ERP No. F–NPS– D61062–PA, White-Tailed Deer Management Plan, Development of a Deer Management Strategy that Supports Protection, Preservation, and Restoration of Native Vegetation, Implementation, Valley Forge National Historical Park, Chester and Montgomery Counties, PA Summary: EPA does not object to the proposed project. EIS No. 20090261, ERP No. FS–GSA– D81027–MD, U.S. Food and Drug Administration (FDA) Headquarters Consolidation, Master Plan Update, Federal Research Center at White Oak, Silver Spring, Montgomery County, MD Summary: EPA’s previous concerns have been resolved; therefore, EPA does not object to the proposed action. Dated: September 8, 2009. Kenneth Mittelholtz, Deputy Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. E9–21943 Filed 9–10–09; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–8597–2] cprice-sewell on DSKGBLS3C1PROD with NOTICES Environmental Impact Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–1399 or https://www.epa.gov/ compliance/nepa/ Weekly receipt of Environmental Impact Statements Filed 08/31/2009 Through 09/04/2009 Pursuant to 40 CFR 1506.9 EIS No. 20090310, Draft Supplement, AFS, ID, Small-Scale Suction VerDate Nov<24>2008 15:23 Sep 10, 2009 Jkt 217001 Dredging in Lolo Creek and Moose Creek Project, Updated Information to Analysis Three Alternatives, Clearwater National Forest, North Fork Ranger District, Clearwater and Idaho Counties, ID, Comment Period Ends: 10/26/2009, Contact: Doug Gober 208–476–4541 EIS No. 20090311, Final EIS, USN, WA, Naval Base Kitsap—Bangor, Construct and Operate a Swimmer Interdiction Security System (SISS), Silverdale Kitsap County, WA, Wait Period Ends: 10/13/2009, Contact: Shannon Kasa 619–53–3889 EIS No. 20090312, Draft EIS, COE, OH, Cleveland Harbor Dredged Material Management Plan, Operations and Maintenance, Cuyahoga County, OH, Comment Period Ends: 10/26/2009, Contact: Frank O’Connor 716–879– 4131 EIS No. 20090313, Draft EIS, AFS, CA, Freds Fire Reforestation Project, Implementation, EL Dorado National Forest, Placerville and Pacific Ranger Districts, El Dorado County, CA, Comment Period Ends: 10/26/2009, Contact: Robert Carroll 530–647–5386 EIS No. 20090314, Draft EIS, FHW, IL, TIER 1—Elgin O’Hare—West Bypass Study, To Identify Multimodal Transportation Solutions, Cook and DuPage Counties, IL, Comment Period Ends: 10/26/2009, Contact: Matt Fuller 217–492–4625 EIS No. 20090315, Draft EIS, FTA, CA, Crenshaw Transit Corridor Project, Proposes to Improve Transit Services, Funding, Los Angeles County Metropolitan Transportation Authority (LACMTA), Los Angeles County, CA, Comment Period Ends: 10/26/2009, Contact: Roderick Diaz 213–922–3018 EIS No. 20090316, Final EIS, FTA, 00, PROGRAMMATIC—Streamlining the Processing of Experimental Permit Applications, Issuing Experimental Permits for the Launch and Reentry of Useable Suborbital Rockets, Wait Period Ends: 10/13/2009, Contact: Daniel Czelusniak 202–267–5924 EIS No. 20090317, Draft EIS, USA, VA, Fort Monroe US Army Garrison Base Realignment and Closure (BRAC) 2005 Disposal and Reuse of Surplus Nonreverting Property, Fort Monroe, VA, Comment Period Ends: 10/26/ 2009, Contact: Bob Ross 703–602– 2878 EIS No. 20090318, Draft EIS, USA, WA, Fort Lewis Army Growth and Force Structures Realignment, Implementation, Fort Monroe and Yakima Training Center, Kittitas, Pierce, Thurston and Yakima Counties, WA, Comment Period Ends: PO 00000 Frm 00038 Fmt 4703 Sfmt 4703 10/26/2009, Contact: B. Van Hoesen 253–966–1780 EIS No. 20090319, Final EIS, USA, AK, U.S. Army Alaska (USARAK) Project, Proposes the Stationing and Training of Increased Aviation Assets, Fort Wainwright, Fairbank, AK, Wait Period Ends: 10/13/2009, Contact: Jennifer Shore 703–602–4238 Amended Notices EIS No. 20090304, Final EIS, AFS, 00, Inyo National Forest Motorized Travel Management Project, Implementation, Inyo, Mono, Fresno, Madera and Tulare Counties, CA and Mineral and Esmeralda Counties, NV, Wait Period Ends: 10/05/2009, Contact: Susan Joyce 760–873–2516 Revision to FR Notice Published 09/04/ 2009: Correction to Counties and States EIS No. 20090309, Final EIS, FTA, MO, East Corridor Project, Proposes Commuter Rail Transit from downtown Denver to International Airport (DIA), Denver, Adams, Arapahoe, Jefferson and Douglas Counties, CO, Wait Period Ends: 10/ 05/2009, Contact: David Beckhouse 720–963–3306 Revision to FR Notice Published 09/04/ 2009: Correction to Title and Federal Agency. Dated: September 8, 2009. Ken Mittelholtz, Deputy Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. E9–21944 Filed 9–10–09; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [FRL–8956–1] Notice of a Project Waiver of Section 1605 (Buy American Requirement) of the American Recovery and Reinvestment Act of 2009 (ARRA) to the Kennebec Water District in Waterville, ME AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY: The EPA is hereby granting a project waiver of the Buy American requirements of ARRA Section 1605 under the authority of Section 1605(b)(2) [manufactured goods are not produced in the United States in sufficient and reasonably available quantities and of a satisfactory quality] to the Kennebec Water District (KWD) (also known as the ‘‘Water District’’) in Waterville, Maine for the purchase of E:\FR\FM\11SEN1.SGM 11SEN1

Agencies

[Federal Register Volume 74, Number 175 (Friday, September 11, 2009)]
[Notices]
[Page 46770]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-21944]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-8597-2]


Environmental Impact Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/

Weekly receipt of Environmental Impact Statements
Filed 08/31/2009 Through 09/04/2009
Pursuant to 40 CFR 1506.9

EIS No. 20090310, Draft Supplement, AFS, ID, Small-Scale Suction 
Dredging in Lolo Creek and Moose Creek Project, Updated Information to 
Analysis Three Alternatives, Clearwater National Forest, North Fork 
Ranger District, Clearwater and Idaho Counties, ID, Comment Period 
Ends: 10/26/2009, Contact: Doug Gober 208-476-4541
EIS No. 20090311, Final EIS, USN, WA, Naval Base Kitsap--Bangor, 
Construct and Operate a Swimmer Interdiction Security System (SISS), 
Silverdale Kitsap County, WA, Wait Period Ends: 10/13/2009, Contact: 
Shannon Kasa 619-53-3889
EIS No. 20090312, Draft EIS, COE, OH, Cleveland Harbor Dredged Material 
Management Plan, Operations and Maintenance, Cuyahoga County, OH, 
Comment Period Ends: 10/26/2009, Contact: Frank O'Connor 716-879-4131
EIS No. 20090313, Draft EIS, AFS, CA, Freds Fire Reforestation Project, 
Implementation, EL Dorado National Forest, Placerville and Pacific 
Ranger Districts, El Dorado County, CA, Comment Period Ends: 10/26/
2009, Contact: Robert Carroll 530-647-5386
EIS No. 20090314, Draft EIS, FHW, IL, TIER 1--Elgin O'Hare--West Bypass 
Study, To Identify Multimodal Transportation Solutions, Cook and DuPage 
Counties, IL, Comment Period Ends: 10/26/2009, Contact: Matt Fuller 
217-492-4625
EIS No. 20090315, Draft EIS, FTA, CA, Crenshaw Transit Corridor 
Project, Proposes to Improve Transit Services, Funding, Los Angeles 
County Metropolitan Transportation Authority (LACMTA), Los Angeles 
County, CA, Comment Period Ends: 10/26/2009, Contact: Roderick Diaz 
213-922-3018
EIS No. 20090316, Final EIS, FTA, 00, PROGRAMMATIC--Streamlining the 
Processing of Experimental Permit Applications, Issuing Experimental 
Permits for the Launch and Reentry of Useable Suborbital Rockets, Wait 
Period Ends: 10/13/2009, Contact: Daniel Czelusniak 202-267-5924
EIS No. 20090317, Draft EIS, USA, VA, Fort Monroe US Army Garrison Base 
Realignment and Closure (BRAC) 2005 Disposal and Reuse of Surplus 
Nonreverting Property, Fort Monroe, VA, Comment Period Ends: 10/26/
2009, Contact: Bob Ross 703-602-2878
EIS No. 20090318, Draft EIS, USA, WA, Fort Lewis Army Growth and Force 
Structures Realignment, Implementation, Fort Monroe and Yakima Training 
Center, Kittitas, Pierce, Thurston and Yakima Counties, WA, Comment 
Period Ends: 10/26/2009, Contact: B. Van Hoesen 253-966-1780
EIS No. 20090319, Final EIS, USA, AK, U.S. Army Alaska (USARAK) 
Project, Proposes the Stationing and Training of Increased Aviation 
Assets, Fort Wainwright, Fairbank, AK, Wait Period Ends: 10/13/2009, 
Contact: Jennifer Shore 703-602-4238

Amended Notices

EIS No. 20090304, Final EIS, AFS, 00, Inyo National Forest Motorized 
Travel Management Project, Implementation, Inyo, Mono, Fresno, Madera 
and Tulare Counties, CA and Mineral and Esmeralda Counties, NV, Wait 
Period Ends: 10/05/2009, Contact: Susan Joyce 760-873-2516
Revision to FR Notice Published 09/04/2009: Correction to Counties and 
States
EIS No. 20090309, Final EIS, FTA, MO, East Corridor Project, Proposes 
Commuter Rail Transit from downtown Denver to International Airport 
(DIA), Denver, Adams, Arapahoe, Jefferson and Douglas Counties, CO, 
Wait Period Ends: 10/05/2009, Contact: David Beckhouse 720-963-3306
Revision to FR Notice Published 09/04/2009: Correction to Title and 
Federal Agency.

    Dated: September 8, 2009.
Ken Mittelholtz,
Deputy Director, NEPA Compliance Division, Office of Federal 
Activities.
[FR Doc. E9-21944 Filed 9-10-09; 8:45 am]
BILLING CODE 6560-50-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.