Egan Hub Storage, LLC; Notice of Request Under Blanket Authorization, 46758 [E9-21866]
Download as PDF
cprice-sewell on DSKGBLS3C1PROD with NOTICES
46758
Federal Register / Vol. 74, No. 175 / Friday, September 11, 2009 / Notices
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
e-mail of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
e-mail FERCOnlineSupport@ferc.gov,
for TTY, call (202) 502–8659. A copy is
also available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, OR
‘‘MOTION TO INTERVENE’’, as
applicable, and the Project Number of
the particular application to which the
filing refers.
p. Agency Comments: Federal, State,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–21861 Filed 9–10–09; 8:45 am]
BILLING CODE 6717–01–P
VerDate Nov<24>2008
15:23 Sep 10, 2009
Jkt 217001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP09–459–000]
Egan Hub Storage, LLC; Notice of
Request Under Blanket Authorization
September 3, 2009.
Take notice that on August 31, 2009,
Egan Hub Storage, LLC (Egan Hub), filed
in Docket No. CP09–459–000, a prior
notice request pursuant to Sections
157.205, 157.208, 157.211, 157.212 and
157.213 of the Commission’s regulations
under the Natural Gas Act (NGA), for
authorization to construct and operate
facilities to connect the Egan Hub
system to Kinder Morgan Louisiana
Pipeline LLC (KMLP) in Acadia Parish,
Louisiana in order to receive and deliver
natural gas from and to KMLP, all as
more fully set forth in the application
which is on file with the Commission
and open to public inspection. Egan
Hub proposes to perform these activities
under its blanket certificate issued
October 7, 1996, in Docket No. CP96–
199–000 [77 FERC ¶ 61,016 (1996)].
The filing may be viewed on the Web
at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call
toll-free, (886) 208–3676 or TYY, (202)
502–8659.
Specifically, Egan Hub seeks
authorization to construct, own, operate,
and maintain a new pipeline tap on its
Fourth Cavern Line 85, and associated
connecting piping to the edge of the
right-of-way, to receive and deliver
natural gas at an interconnection with
KMLP’s interstate pipeline facilities, at
a site selected by KMLP. Additionally,
Egan Hub will own, operate and
maintain a check electronic gas
measurement (EGM) facility that KMLP
will install at its meter and regulator
(M&R) site. KMLP’s facilities are
designed primarily to receive
revaporized liquefied natural gas (LNG)
from the Sabine Pass LNG, L.P. LNG
import terminal to be located in
Cameron Parish, Louisiana.
Egan Hub also proposes the design
and construction of approximately 15
feet of 16-inch diameter pipe, a single
24-inch by 24-inch by 16-inch tee tap
and a 16-inch valve. The check EGM, to
be constructed by KMLP within its M&R
site, is to be owned and operated by
Egan Hub. The project area is located
within the corridor of Egan Hub’s
Fourth Cavern Project Line 85 at
approximately milepost 6.9 in Acadia
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
Parish, Louisiana. With the exception of
the check EGM, the project area is
entirely within the proposed workspace
previously surveyed and approved for
Egan Hub’s Fourth Cavern Project. Egan
Hub has estimated the total cost of
constructing the facilities proposed
herein to be $400,000. Egan Hub will
bear all costs associated with
constructing such facilities. The
proposed in-service date for the
interconnect facilities is March 1, 2010.
Any questions regarding this
application may be directed to Lisa A.
Moore, General manager, Rates and
Certificates, Egan Hub Storage, LLC, P.
O. Box 1642, Houston, Texas 77251–
1642; phone (713)627–4102, FAX
(713)627–5947.
Any person or the Commission’s Staff
may, within 60 days after the issuance
of the instant notice by the Commission,
file pursuant to Rule 214 of the
Commission’s Procedural Rules (18 CFR
385.214) a motion to intervene or notice
of intervention and, pursuant to section
157.205 of the Commission’s
Regulations under the NGA (18 CFR
157.205) a protest to the request. If no
protest is filed within the time allowed
therefore, the proposed activity shall be
deemed to be authorized effective the
day after the time allowed for protest. If
a protest is filed and not withdrawn
within 30 days after the time allowed
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to Section 7 of
the NGA.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the Internet in lieu
of paper. See 18 CFR 385.2001(a) (1) (iii)
and the instructions on the
Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy regulatory Commission,
888 First Street, NE., Washington, DC
20426.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–21866 Filed 9–10–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings No. 2
September 1, 2009.
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
E:\FR\FM\11SEN1.SGM
11SEN1
Agencies
[Federal Register Volume 74, Number 175 (Friday, September 11, 2009)]
[Notices]
[Page 46758]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-21866]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP09-459-000]
Egan Hub Storage, LLC; Notice of Request Under Blanket
Authorization
September 3, 2009.
Take notice that on August 31, 2009, Egan Hub Storage, LLC (Egan
Hub), filed in Docket No. CP09-459-000, a prior notice request pursuant
to Sections 157.205, 157.208, 157.211, 157.212 and 157.213 of the
Commission's regulations under the Natural Gas Act (NGA), for
authorization to construct and operate facilities to connect the Egan
Hub system to Kinder Morgan Louisiana Pipeline LLC (KMLP) in Acadia
Parish, Louisiana in order to receive and deliver natural gas from and
to KMLP, all as more fully set forth in the application which is on
file with the Commission and open to public inspection. Egan Hub
proposes to perform these activities under its blanket certificate
issued October 7, 1996, in Docket No. CP96-199-000 [77 FERC ] 61,016
(1996)].
The filing may be viewed on the Web at https://www.ferc.gov using
the ``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-
free, (886) 208-3676 or TYY, (202) 502-8659.
Specifically, Egan Hub seeks authorization to construct, own,
operate, and maintain a new pipeline tap on its Fourth Cavern Line 85,
and associated connecting piping to the edge of the right-of-way, to
receive and deliver natural gas at an interconnection with KMLP's
interstate pipeline facilities, at a site selected by KMLP.
Additionally, Egan Hub will own, operate and maintain a check
electronic gas measurement (EGM) facility that KMLP will install at its
meter and regulator (M&R) site. KMLP's facilities are designed
primarily to receive revaporized liquefied natural gas (LNG) from the
Sabine Pass LNG, L.P. LNG import terminal to be located in Cameron
Parish, Louisiana.
Egan Hub also proposes the design and construction of approximately
15 feet of 16-inch diameter pipe, a single 24-inch by 24-inch by 16-
inch tee tap and a 16-inch valve. The check EGM, to be constructed by
KMLP within its M&R site, is to be owned and operated by Egan Hub. The
project area is located within the corridor of Egan Hub's Fourth Cavern
Project Line 85 at approximately milepost 6.9 in Acadia Parish,
Louisiana. With the exception of the check EGM, the project area is
entirely within the proposed workspace previously surveyed and approved
for Egan Hub's Fourth Cavern Project. Egan Hub has estimated the total
cost of constructing the facilities proposed herein to be $400,000.
Egan Hub will bear all costs associated with constructing such
facilities. The proposed in-service date for the interconnect
facilities is March 1, 2010.
Any questions regarding this application may be directed to Lisa A.
Moore, General manager, Rates and Certificates, Egan Hub Storage, LLC,
P. O. Box 1642, Houston, Texas 77251-1642; phone (713)627-4102, FAX
(713)627-5947.
Any person or the Commission's Staff may, within 60 days after the
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and, pursuant to section 157.205 of
the Commission's Regulations under the NGA (18 CFR 157.205) a protest
to the request. If no protest is filed within the time allowed
therefore, the proposed activity shall be deemed to be authorized
effective the day after the time allowed for protest. If a protest is
filed and not withdrawn within 30 days after the time allowed for
filing a protest, the instant request shall be treated as an
application for authorization pursuant to Section 7 of the NGA.
The Commission strongly encourages electronic filings of comments,
protests, and interventions via the Internet in lieu of paper. See 18
CFR 385.2001(a) (1) (iii) and the instructions on the Commission's Web
site (https://www.ferc.gov) under the ``e-Filing'' link. Persons unable
to file electronically should submit an original and 14 copies of the
protest or intervention to the Federal Energy regulatory Commission,
888 First Street, NE., Washington, DC 20426.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-21866 Filed 9-10-09; 8:45 am]