Egan Hub Storage, LLC; Notice of Request Under Blanket Authorization, 46758 [E9-21866]

Download as PDF cprice-sewell on DSKGBLS3C1PROD with NOTICES 46758 Federal Register / Vol. 74, No. 175 / Friday, September 11, 2009 / Notices inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via e-mail of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: All filings must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, OR ‘‘MOTION TO INTERVENE’’, as applicable, and the Project Number of the particular application to which the filing refers. p. Agency Comments: Federal, State, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Kimberly D. Bose, Secretary. [FR Doc. E9–21861 Filed 9–10–09; 8:45 am] BILLING CODE 6717–01–P VerDate Nov<24>2008 15:23 Sep 10, 2009 Jkt 217001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP09–459–000] Egan Hub Storage, LLC; Notice of Request Under Blanket Authorization September 3, 2009. Take notice that on August 31, 2009, Egan Hub Storage, LLC (Egan Hub), filed in Docket No. CP09–459–000, a prior notice request pursuant to Sections 157.205, 157.208, 157.211, 157.212 and 157.213 of the Commission’s regulations under the Natural Gas Act (NGA), for authorization to construct and operate facilities to connect the Egan Hub system to Kinder Morgan Louisiana Pipeline LLC (KMLP) in Acadia Parish, Louisiana in order to receive and deliver natural gas from and to KMLP, all as more fully set forth in the application which is on file with the Commission and open to public inspection. Egan Hub proposes to perform these activities under its blanket certificate issued October 7, 1996, in Docket No. CP96– 199–000 [77 FERC ¶ 61,016 (1996)]. The filing may be viewed on the Web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (886) 208–3676 or TYY, (202) 502–8659. Specifically, Egan Hub seeks authorization to construct, own, operate, and maintain a new pipeline tap on its Fourth Cavern Line 85, and associated connecting piping to the edge of the right-of-way, to receive and deliver natural gas at an interconnection with KMLP’s interstate pipeline facilities, at a site selected by KMLP. Additionally, Egan Hub will own, operate and maintain a check electronic gas measurement (EGM) facility that KMLP will install at its meter and regulator (M&R) site. KMLP’s facilities are designed primarily to receive revaporized liquefied natural gas (LNG) from the Sabine Pass LNG, L.P. LNG import terminal to be located in Cameron Parish, Louisiana. Egan Hub also proposes the design and construction of approximately 15 feet of 16-inch diameter pipe, a single 24-inch by 24-inch by 16-inch tee tap and a 16-inch valve. The check EGM, to be constructed by KMLP within its M&R site, is to be owned and operated by Egan Hub. The project area is located within the corridor of Egan Hub’s Fourth Cavern Project Line 85 at approximately milepost 6.9 in Acadia PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 Parish, Louisiana. With the exception of the check EGM, the project area is entirely within the proposed workspace previously surveyed and approved for Egan Hub’s Fourth Cavern Project. Egan Hub has estimated the total cost of constructing the facilities proposed herein to be $400,000. Egan Hub will bear all costs associated with constructing such facilities. The proposed in-service date for the interconnect facilities is March 1, 2010. Any questions regarding this application may be directed to Lisa A. Moore, General manager, Rates and Certificates, Egan Hub Storage, LLC, P. O. Box 1642, Houston, Texas 77251– 1642; phone (713)627–4102, FAX (713)627–5947. Any person or the Commission’s Staff may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and, pursuant to section 157.205 of the Commission’s Regulations under the NGA (18 CFR 157.205) a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to Section 7 of the NGA. The Commission strongly encourages electronic filings of comments, protests, and interventions via the Internet in lieu of paper. See 18 CFR 385.2001(a) (1) (iii) and the instructions on the Commission’s Web site (https:// www.ferc.gov) under the ‘‘e-Filing’’ link. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy regulatory Commission, 888 First Street, NE., Washington, DC 20426. Kimberly D. Bose, Secretary. [FR Doc. E9–21866 Filed 9–10–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings No. 2 September 1, 2009. Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: E:\FR\FM\11SEN1.SGM 11SEN1

Agencies

[Federal Register Volume 74, Number 175 (Friday, September 11, 2009)]
[Notices]
[Page 46758]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-21866]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP09-459-000]


Egan Hub Storage, LLC; Notice of Request Under Blanket 
Authorization

September 3, 2009.
    Take notice that on August 31, 2009, Egan Hub Storage, LLC (Egan 
Hub), filed in Docket No. CP09-459-000, a prior notice request pursuant 
to Sections 157.205, 157.208, 157.211, 157.212 and 157.213 of the 
Commission's regulations under the Natural Gas Act (NGA), for 
authorization to construct and operate facilities to connect the Egan 
Hub system to Kinder Morgan Louisiana Pipeline LLC (KMLP) in Acadia 
Parish, Louisiana in order to receive and deliver natural gas from and 
to KMLP, all as more fully set forth in the application which is on 
file with the Commission and open to public inspection. Egan Hub 
proposes to perform these activities under its blanket certificate 
issued October 7, 1996, in Docket No. CP96-199-000 [77 FERC ] 61,016 
(1996)].
    The filing may be viewed on the Web at https://www.ferc.gov using 
the ``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. For 
assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-
free, (886) 208-3676 or TYY, (202) 502-8659.
    Specifically, Egan Hub seeks authorization to construct, own, 
operate, and maintain a new pipeline tap on its Fourth Cavern Line 85, 
and associated connecting piping to the edge of the right-of-way, to 
receive and deliver natural gas at an interconnection with KMLP's 
interstate pipeline facilities, at a site selected by KMLP. 
Additionally, Egan Hub will own, operate and maintain a check 
electronic gas measurement (EGM) facility that KMLP will install at its 
meter and regulator (M&R) site. KMLP's facilities are designed 
primarily to receive revaporized liquefied natural gas (LNG) from the 
Sabine Pass LNG, L.P. LNG import terminal to be located in Cameron 
Parish, Louisiana.
    Egan Hub also proposes the design and construction of approximately 
15 feet of 16-inch diameter pipe, a single 24-inch by 24-inch by 16-
inch tee tap and a 16-inch valve. The check EGM, to be constructed by 
KMLP within its M&R site, is to be owned and operated by Egan Hub. The 
project area is located within the corridor of Egan Hub's Fourth Cavern 
Project Line 85 at approximately milepost 6.9 in Acadia Parish, 
Louisiana. With the exception of the check EGM, the project area is 
entirely within the proposed workspace previously surveyed and approved 
for Egan Hub's Fourth Cavern Project. Egan Hub has estimated the total 
cost of constructing the facilities proposed herein to be $400,000. 
Egan Hub will bear all costs associated with constructing such 
facilities. The proposed in-service date for the interconnect 
facilities is March 1, 2010.
    Any questions regarding this application may be directed to Lisa A. 
Moore, General manager, Rates and Certificates, Egan Hub Storage, LLC, 
P. O. Box 1642, Houston, Texas 77251-1642; phone (713)627-4102, FAX 
(713)627-5947.
    Any person or the Commission's Staff may, within 60 days after the 
issuance of the instant notice by the Commission, file pursuant to Rule 
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
intervene or notice of intervention and, pursuant to section 157.205 of 
the Commission's Regulations under the NGA (18 CFR 157.205) a protest 
to the request. If no protest is filed within the time allowed 
therefore, the proposed activity shall be deemed to be authorized 
effective the day after the time allowed for protest. If a protest is 
filed and not withdrawn within 30 days after the time allowed for 
filing a protest, the instant request shall be treated as an 
application for authorization pursuant to Section 7 of the NGA.
    The Commission strongly encourages electronic filings of comments, 
protests, and interventions via the Internet in lieu of paper. See 18 
CFR 385.2001(a) (1) (iii) and the instructions on the Commission's Web 
site (https://www.ferc.gov) under the ``e-Filing'' link. Persons unable 
to file electronically should submit an original and 14 copies of the 
protest or intervention to the Federal Energy regulatory Commission, 
888 First Street, NE., Washington, DC 20426.

Kimberly D. Bose,
Secretary.
[FR Doc. E9-21866 Filed 9-10-09; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.