Drawbridge Operation Regulations; Hampton River, Hampton, NH, Maintenance, 46010 [E9-21560]
Download as PDF
46010
Federal Register / Vol. 74, No. 172 / Tuesday, September 8, 2009 / Rules and Regulations
Department of Homeland Security Delegation
No. 0170.1.
2. Revise § 110.60(d)(10) to read as
follows:
■
§ 110.60
Captain of the Port, New York.
*
*
*
*
*
(d) * * *
(10) Perth Amboy, NJ. All waters
bound by the following points:
40°30′26.00″ N, 074°15′42.00″ W; thence
to 40°30′24.29″ N, 074°15′35.20″ W;
thence to 40°30′02.79″ N, 074°15′44.16″
W; thence to 40°29′35.70″ N,
074°16′08.88″ W; thence to 40°29′31.00″
N, 074°16′20.75″ W; thence to
40°29′47.26″ N, 074°16′49.82″ W; thence
to 40°30′02.00″ N, 074°16′41.00″ W,
thence along the shoreline to the point
of origin.
(i) This area is limited to vessels no
greater than 20 meters in length and is
primarily for use by recreational craft on
a seasonal or transient basis. These
regulations do not prohibit the
placement of moorings within the
anchorage area, but requests for the
placement of moorings should be
directed to the Raritan Yacht Club Fleet
Captain (telephone 732–826–2277 or
VHF Channel 9) to ensure compliance
with local and State laws. All moorings
shall be so placed that no vessel, when
anchored, will at any time extend
beyond the limits of the area. Fixed
mooring piles or stakes are prohibited
seaward of the pier head line. Mariners
are encouraged to contact the Raritan
Yacht Club Fleet Captain for any
additional ordinances or laws and to
ensure compliance with additional
applicable State and local laws.
(ii) [Reserved]
*
*
*
*
*
Dated: July 30, 2009.
J.L. Nimmich,
Rear Admiral, U.S. Coast Guard, Commander,
First Coast Guard District.
[FR Doc. E9–21435 Filed 9–4–09; 8:45 am]
BILLING CODE 4910–15–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
CPrice-Sewell on DSKGBLS3C1PROD with RULES
33 CFR Part 117
[Docket No. USCG–2009–0795]
Drawbridge Operation Regulations;
Hampton River, Hampton, NH,
Maintenance
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
VerDate Nov<24>2008
14:52 Sep 04, 2009
Jkt 217001
SUMMARY: The Commander, First Coast
Guard District, has issued a temporary
deviation from the regulation governing
the operation of the SR1A Bridge across
the Hampton River at mile 0.0, at
Hampton, New Hampshire. This
temporary deviation allows the SR1A
Bridge to remain in the closed position
for 10 hours to facilitate bridge
maintenance.
Dated: August 27, 2009.
Gary Kassof,
Bridge Program Manager, First Coast Guard
District.
[FR Doc. E9–21560 Filed 9–4–09; 8:45 am]
DATES: This deviation is effective from
7 a.m. through 5 p.m. on September 15,
2009.
ADDRESSES: Documents mentioned in
this preamble as being available in the
docket are part of docket USCG–2009–
0795 and are available online at
https://www.regulations.gov, inserting
USCG–2009–0795 in the ‘‘Keyword’’
and then clicking ‘‘Search.’’ They are
also available for inspection or copying
at the Docket Management Facility (M–
30), U.S. Department of Transportation,
West Building Ground Floor, Room
W12–140, 1200 New Jersey Avenue, SE.,
Washington, DC 20590, between 9 a.m.
and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this rule, call or
e-mail Mr. John McDonald, Project
Officer, First Coast Guard District,
telephone (617) 223–8364,
john.w.mcdonald@uscg.mil. If you have
questions on viewing the docket, call
Renee V. Wright, Program Manager,
Docket Operations, telephone 202–366–
9826.
SUPPLEMENTARY INFORMATION:
The SR1A Bridge, across the Hampton
River at mile 0.0, at Hampton, New
Hampshire, has a vertical clearance in
the closed position of 18 feet at mean
high water and 26 feet at mean low
water. The existing drawbridge
operation regulations are listed at 33
CFR 117.697.
The waterway predominantly
supports recreational vessels of various
sizes.
The bridge owner, New Hampshire
Department of Transportation, requested
a temporary deviation to facilitate
necessary bridge maintenance.
Under this temporary deviation the
SR1A Bridge may remain in the closed
position from 7 a.m. through 5 p.m. on
September 15, 2009. Vessels that can
pass under the bridge without a bridge
opening may do so at all times.
In accordance with 33 CFR 117.35(e),
the bridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
Coast Guard
PO 00000
Frm 00032
Fmt 4700
Sfmt 4700
BILLING CODE 4910–15–P
DEPARTMENT OF HOMELAND
SECURITY
33 CFR Part 117
[Docket No. USCG–2009–0735]
Drawbridge Operation Regulations;
Hackensack River, Jersey City, NJ,
Maintenance
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
SUMMARY: The Commander, First Coast
Guard District, has issued a temporary
deviation from the regulation governing
the operation of the Witt Penn Bridge at
mile 3.1, across the Hackensack River, at
Jersey City, New Jersey. Under this
temporary deviation the Witt Penn
Bridge may remain in the closed
position for 45 days to facilitate
necessary bridge maintenance.
DATES: This deviation is effective from
September 8, 2009 through October 22,
2009.
ADDRESSES: Documents mentioned in
this preamble as being available in the
docket are part of docket USCG–2009–
0735 and are available online at
www.regulations.gov, inserting USCG–
2009–0735 in the ‘‘Keyword’’ and then
clicking ‘‘Search’’. They are also
available for inspection or copying at
the Docket Management Facility (M–30),
U.S. Department of Transportation,
West Building Ground Floor, Room
W12–140, 1200 New Jersey Avenue, SE.,
Washington, DC 20590, between 9 a.m.
and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this rule, call or
e-mail Mr. Joe Arca, Project Officer,
First Coast Guard District, telephone
(212) 668–7165. If you have questions
on viewing the docket, call Renee V.
Wright, Program Manager, Docket
Operations, telephone 202–366–9826.
SUPPLEMENTARY INFORMATION: The Witt
Penn Bridge, across the Hackensack
River at mile 3.1 has a vertical clearance
in the closed position of 35 feet at mean
high water and 40 feet at mean low
water. The existing drawbridge
operation regulations are listed at 33
CFR 117.723.
E:\FR\FM\08SER1.SGM
08SER1
Agencies
[Federal Register Volume 74, Number 172 (Tuesday, September 8, 2009)]
[Rules and Regulations]
[Page 46010]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-21560]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2009-0795]
Drawbridge Operation Regulations; Hampton River, Hampton, NH,
Maintenance
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, First Coast Guard District, has issued a
temporary deviation from the regulation governing the operation of the
SR1A Bridge across the Hampton River at mile 0.0, at Hampton, New
Hampshire. This temporary deviation allows the SR1A Bridge to remain in
the closed position for 10 hours to facilitate bridge maintenance.
DATES: This deviation is effective from 7 a.m. through 5 p.m. on
September 15, 2009.
ADDRESSES: Documents mentioned in this preamble as being available in
the docket are part of docket USCG-2009-0795 and are available online
at https://www.regulations.gov, inserting USCG-2009-0795 in the
``Keyword'' and then clicking ``Search.'' They are also available for
inspection or copying at the Docket Management Facility (M-30), U.S.
Department of Transportation, West Building Ground Floor, Room W12-140,
1200 New Jersey Avenue, SE., Washington, DC 20590, between 9 a.m. and 5
p.m., Monday through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this rule,
call or e-mail Mr. John McDonald, Project Officer, First Coast Guard
District, telephone (617) 223-8364, john.w.mcdonald@uscg.mil. If you
have questions on viewing the docket, call Renee V. Wright, Program
Manager, Docket Operations, telephone 202-366-9826.
SUPPLEMENTARY INFORMATION:
The SR1A Bridge, across the Hampton River at mile 0.0, at Hampton,
New Hampshire, has a vertical clearance in the closed position of 18
feet at mean high water and 26 feet at mean low water. The existing
drawbridge operation regulations are listed at 33 CFR 117.697.
The waterway predominantly supports recreational vessels of various
sizes.
The bridge owner, New Hampshire Department of Transportation,
requested a temporary deviation to facilitate necessary bridge
maintenance.
Under this temporary deviation the SR1A Bridge may remain in the
closed position from 7 a.m. through 5 p.m. on September 15, 2009.
Vessels that can pass under the bridge without a bridge opening may do
so at all times.
In accordance with 33 CFR 117.35(e), the bridge must return to its
regular operating schedule immediately at the end of the designated
time period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: August 27, 2009.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.
[FR Doc. E9-21560 Filed 9-4-09; 8:45 am]
BILLING CODE 4910-15-P