South Feather Water and Power Agency; Notice of Intent To Prepare an Environmental Document and Soliciting Comments, 45635-45636 [E9-21245]
Download as PDF
Federal Register / Vol. 74, No. 170 / Thursday, September 3, 2009 / Notices
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed docket(s). For assistance
with any FERC Online service, please email FERCOnlineSupport@ferc.gov or
call (866) 208–3676 (toll free). For TTY,
call (202) 502–8659.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E9–21249 Filed 9–2–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
pwalker on DSK8KYBLC1PROD with NOTICES
[Project No. 2088–075]
South Feather Water and Power
Agency; Notice of Intent To Prepare an
Environmental Document and
Soliciting Comments
August 27, 2009.
Take notice that the following
hydroelectric application has been filed
VerDate Nov<24>2008
16:27 Sep 02, 2009
Jkt 217001
with the Commission and is available
for public inspection:
a. Application Type: Intent to raise
dam crest and modify spillway.
b. Project No: 2088–075.
c. Date Filed: May 21, 2009.
d. Applicant: South Feather Water
and Power Agency .
e. Name of Project: South Feather
Power Project.
f. Location: The South Feather Power
Project is located on the South Fork
Feather River, Lost Creek, and Slate
Creek in Butte, Plumas, and Yuba
Counties, California. This project
occupies federal and non-federal lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Kathy
Zancanella, South Feather Water and
Power Agency Power Division, 2310
Oro Quincy Highway, Oroville, CA
95966, Tel: (503) 534–1221.
i. FERC Contact: Joy Jones, Telephone
(202) 502–6760, and e-mail:
joy.jones@ferc.gov.
j. Deadline for Filing Comments,
Motions To Intervene, and Protests:
September 28, 2009.
All documents (original and eight
copies) should be filed with: Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
The Commission’s Rules of Practice
and Procedure require all interveners
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervener files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency. A copy of any
motion to intervene must also be served
upon each representative of the
Applicant specified in the particular
application.
k. Description of Request: South
Feather Water and Power Agency has
filed an Environmental Report
addressing its intent to modify the crest
of Sly Creek Dam, part of the South
Feather Power Project (FERC No. 2088).
The project consists of four separate
developments: Sly Creek, Woodleaf,
Forbestown and Kelly Ridge. The
proposed work at Sly Creek Dam would
take place within the Sly Creek
development. Water from Sly Creek
reservoir is controlled by Sly Creek
Dam, which releases water to the Lost
Creek reservoir downstream of the dam.
A hydraulic study on Sly Creek
reservoir included an estimate of the
probable maximum flood (PMF) flow
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
45635
event for the reservoir, which indicated
that during a PMF event, the dam crest
would overtop unless it was raised and/
or the spillway was modified. To ensure
the licensee’s compliance with FERC
engineering guidelines and safety
regulations, modifications to the dam
are necessary. The licensee is proposing
to raise the dam crest, replace the
spillway gate and platform, raise the
abutment walls of the spillway channel,
and improve the roadway approaching
the spillway and associated drainage
structures. Under the licensee’s
proposal, the operating level of Sly
Creek reservoir’s water surface elevation
would remain consistent with the
original water surface elevation
approved in the project license.
The Commission intends to prepare
an environmental document under the
National Environmental Policy Act
(NEPA) for the Sly Creek Dam crest raise
project. The NEPA document will be
used by the Commission to identify
environmental impacts and to identify
measures that would help mitigate the
impacts caused by modification
activities.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE., Room
2A, Washington, DC 20426. This filing
may also be viewed on the
Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. You may
also register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
e-mail FERCOnlineSupport@ferc.gov,
for TTY, call (202) 502–8659.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments: Anyone may submit
comments with respect to the licensee’s
proposed activities. In determining the
appropriate action to take, the
Commission will consider all comments
filed. Any comments must be received
on or before the specified comment date
for the particular application.
o. Any filing made with the
Commission must bear in all capital
letters the title ‘‘COMMENTS’’ and the
Project Number (P–2088–075) of the
particular application to which the
filing refers.
p. Agency Comments: Federal, state,
and local agencies are invited to file
E:\FR\FM\03SEN1.SGM
03SEN1
45636
Federal Register / Vol. 74, No. 170 / Thursday, September 3, 2009 / Notices
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
q. Comments may be filed
electronically via the Internet in lieu of
paper. See, 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site at https://
www.ferc.gov under the ‘‘e-Filing’’ link.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–21245 Filed 9–2–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Filing
pwalker on DSK8KYBLC1PROD with NOTICES
August 27, 2009.
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Docket Numbers: RP96–200–224.
Applicants: CenterPoint Energy Gas
Transmission Comp
Description: CenterPoint Energy Gas
Transmission Co. submits an amended
negotiated rate agreement with Cross
Timbers Energy Services, Inc.
Filed Date: 08/03/2009.
Accession Number: 20090804–0157.
Comment Date: 5 p.m. Eastern Time
on Monday, August 17, 2009.
Any person desiring to intervene or to
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s Rules of
Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern
time on the specified comment date. It
is not necessary to separately intervene
again in a subdocket related to a
compliance filing if you have previously
intervened in the same docket. Protests
will be considered by the Commission
in determining the appropriate action to
be taken, but will not serve to make
protestants parties to the proceeding.
Anyone filing a motion to intervene or
protest must serve a copy of that
document on the Applicant. In reference
to filings initiating a new proceeding,
interventions or protests submitted on
or before the comment deadline need
not be served on persons other than the
Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
VerDate Nov<24>2008
16:27 Sep 02, 2009
Jkt 217001
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above proceedings
are accessible in the Commission’s
eLibrary system by clicking on the
appropriate link in the above list. They
are also available for review in the
Commission’s Public Reference Room in
Washington, DC. There is an
eSubscription link on the Web site that
enables subscribers to receive e-mail
notification when a document is added
to a subscribed dockets(s). For
assistance with any FERC Online
service, please e-mail
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all the parties in this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on September 16, 2009.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E9–21248 Filed 9–2–09; 8:45 am]
Kimberly D. Bose,
Secretary.
[FR Doc. E9–21243 Filed 9–2–09; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. ER09–1400–000]
[Docket No. CP09–457–000]
Milford Wind Corridor Phase I, LLC;
Notice of Filing
Kinder Morgan Louisiana Pipeline LLC;
Notice of Request Under Blanket
Authorization
August 27, 2009.
Take notice that, on August 26, 2009,
Milford Wind Corridor Phase I, LLC
filed to supplement its filing in the
above-captioned proceeding with
information required under the
Commission’s regulations. Such filing
served to reset the filing date in this
proceeding.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
August 27, 2009.
Take notice that on August 21, 2009,
Kinder Morgan Louisiana Pipeline LLC
(KMLP), filed in Docket No. CP09–457–
000, a prior notice request pursuant to
sections 157.205, 157.208, 157.211 and
157.212 of the Commission’s regulations
under the Natural Gas Act (NGA), for
authorization to construct and operate
facilities to connect the KMLP system to
Egan Hub Storage, LLC (Egan Hub) in
Acadia Parish, Louisiana in order to
deliver revaporized liquefied natural gas
to Egan Hub and subsequently to receive
gas from Egan Hub, all as more fully set
forth in the application which is on file
with the Commission and open to
public inspection. KMLP proposes to
perform these activities under its
blanket certificate issued June 22, 2007,
E:\FR\FM\03SEN1.SGM
03SEN1
Agencies
[Federal Register Volume 74, Number 170 (Thursday, September 3, 2009)]
[Notices]
[Pages 45635-45636]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-21245]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2088-075]
South Feather Water and Power Agency; Notice of Intent To Prepare
an Environmental Document and Soliciting Comments
August 27, 2009.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Intent to raise dam crest and modify spillway.
b. Project No: 2088-075.
c. Date Filed: May 21, 2009.
d. Applicant: South Feather Water and Power Agency .
e. Name of Project: South Feather Power Project.
f. Location: The South Feather Power Project is located on the
South Fork Feather River, Lost Creek, and Slate Creek in Butte, Plumas,
and Yuba Counties, California. This project occupies federal and non-
federal lands.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Kathy Zancanella, South Feather Water and
Power Agency Power Division, 2310 Oro Quincy Highway, Oroville, CA
95966, Tel: (503) 534-1221.
i. FERC Contact: Joy Jones, Telephone (202) 502-6760, and e-mail:
joy.jones@ferc.gov.
j. Deadline for Filing Comments, Motions To Intervene, and
Protests: September 28, 2009.
All documents (original and eight copies) should be filed with:
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
The Commission's Rules of Practice and Procedure require all
interveners filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervener files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency. A copy
of any motion to intervene must also be served upon each representative
of the Applicant specified in the particular application.
k. Description of Request: South Feather Water and Power Agency has
filed an Environmental Report addressing its intent to modify the crest
of Sly Creek Dam, part of the South Feather Power Project (FERC No.
2088). The project consists of four separate developments: Sly Creek,
Woodleaf, Forbestown and Kelly Ridge. The proposed work at Sly Creek
Dam would take place within the Sly Creek development. Water from Sly
Creek reservoir is controlled by Sly Creek Dam, which releases water to
the Lost Creek reservoir downstream of the dam. A hydraulic study on
Sly Creek reservoir included an estimate of the probable maximum flood
(PMF) flow event for the reservoir, which indicated that during a PMF
event, the dam crest would overtop unless it was raised and/or the
spillway was modified. To ensure the licensee's compliance with FERC
engineering guidelines and safety regulations, modifications to the dam
are necessary. The licensee is proposing to raise the dam crest,
replace the spillway gate and platform, raise the abutment walls of the
spillway channel, and improve the roadway approaching the spillway and
associated drainage structures. Under the licensee's proposal, the
operating level of Sly Creek reservoir's water surface elevation would
remain consistent with the original water surface elevation approved in
the project license.
The Commission intends to prepare an environmental document under
the National Environmental Policy Act (NEPA) for the Sly Creek Dam
crest raise project. The NEPA document will be used by the Commission
to identify environmental impacts and to identify measures that would
help mitigate the impacts caused by modification activities.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street, NE., Room 2A, Washington,
DC 20426. This filing may also be viewed on the Commission's Web site
at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number excluding the last three digits in the docket number field to
access the document. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of
new filings and issuances related to this or other pending projects.
For assistance, call 1-866-208-3676 or e-mail
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments: Anyone may submit comments with respect to the
licensee's proposed activities. In determining the appropriate action
to take, the Commission will consider all comments filed. Any comments
must be received on or before the specified comment date for the
particular application.
o. Any filing made with the Commission must bear in all capital
letters the title ``COMMENTS'' and the Project Number (P-2088-075) of
the particular application to which the filing refers.
p. Agency Comments: Federal, state, and local agencies are invited
to file
[[Page 45636]]
comments on the described application. A copy of the application may be
obtained by agencies directly from the Applicant. If an agency does not
file comments within the time specified for filing comments, it will be
presumed to have no comments. One copy of an agency's comments must
also be sent to the Applicant's representatives.
q. Comments may be filed electronically via the Internet in lieu of
paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the
Commission's Web site at https://www.ferc.gov under the ``e-Filing''
link.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-21245 Filed 9-2-09; 8:45 am]
BILLING CODE 6717-01-P