South Feather Water and Power Agency; Notice of Intent To Prepare an Environmental Document and Soliciting Comments, 45635-45636 [E9-21245]

Download as PDF Federal Register / Vol. 74, No. 170 / Thursday, September 3, 2009 / Notices intervened in the same docket. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. In reference to filings initiating a new proceeding, interventions or protests submitted on or before the comment deadline need not be served on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St., NE., Washington, DC 20426. The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. E9–21249 Filed 9–2–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission pwalker on DSK8KYBLC1PROD with NOTICES [Project No. 2088–075] South Feather Water and Power Agency; Notice of Intent To Prepare an Environmental Document and Soliciting Comments August 27, 2009. Take notice that the following hydroelectric application has been filed VerDate Nov<24>2008 16:27 Sep 02, 2009 Jkt 217001 with the Commission and is available for public inspection: a. Application Type: Intent to raise dam crest and modify spillway. b. Project No: 2088–075. c. Date Filed: May 21, 2009. d. Applicant: South Feather Water and Power Agency . e. Name of Project: South Feather Power Project. f. Location: The South Feather Power Project is located on the South Fork Feather River, Lost Creek, and Slate Creek in Butte, Plumas, and Yuba Counties, California. This project occupies federal and non-federal lands. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Kathy Zancanella, South Feather Water and Power Agency Power Division, 2310 Oro Quincy Highway, Oroville, CA 95966, Tel: (503) 534–1221. i. FERC Contact: Joy Jones, Telephone (202) 502–6760, and e-mail: joy.jones@ferc.gov. j. Deadline for Filing Comments, Motions To Intervene, and Protests: September 28, 2009. All documents (original and eight copies) should be filed with: Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. The Commission’s Rules of Practice and Procedure require all interveners filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. k. Description of Request: South Feather Water and Power Agency has filed an Environmental Report addressing its intent to modify the crest of Sly Creek Dam, part of the South Feather Power Project (FERC No. 2088). The project consists of four separate developments: Sly Creek, Woodleaf, Forbestown and Kelly Ridge. The proposed work at Sly Creek Dam would take place within the Sly Creek development. Water from Sly Creek reservoir is controlled by Sly Creek Dam, which releases water to the Lost Creek reservoir downstream of the dam. A hydraulic study on Sly Creek reservoir included an estimate of the probable maximum flood (PMF) flow PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 45635 event for the reservoir, which indicated that during a PMF event, the dam crest would overtop unless it was raised and/ or the spillway was modified. To ensure the licensee’s compliance with FERC engineering guidelines and safety regulations, modifications to the dam are necessary. The licensee is proposing to raise the dam crest, replace the spillway gate and platform, raise the abutment walls of the spillway channel, and improve the roadway approaching the spillway and associated drainage structures. Under the licensee’s proposal, the operating level of Sly Creek reservoir’s water surface elevation would remain consistent with the original water surface elevation approved in the project license. The Commission intends to prepare an environmental document under the National Environmental Policy Act (NEPA) for the Sly Creek Dam crest raise project. The NEPA document will be used by the Commission to identify environmental impacts and to identify measures that would help mitigate the impacts caused by modification activities. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426. This filing may also be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments: Anyone may submit comments with respect to the licensee’s proposed activities. In determining the appropriate action to take, the Commission will consider all comments filed. Any comments must be received on or before the specified comment date for the particular application. o. Any filing made with the Commission must bear in all capital letters the title ‘‘COMMENTS’’ and the Project Number (P–2088–075) of the particular application to which the filing refers. p. Agency Comments: Federal, state, and local agencies are invited to file E:\FR\FM\03SEN1.SGM 03SEN1 45636 Federal Register / Vol. 74, No. 170 / Thursday, September 3, 2009 / Notices comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. q. Comments may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https:// www.ferc.gov under the ‘‘e-Filing’’ link. Kimberly D. Bose, Secretary. [FR Doc. E9–21245 Filed 9–2–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Filing pwalker on DSK8KYBLC1PROD with NOTICES August 27, 2009. Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Docket Numbers: RP96–200–224. Applicants: CenterPoint Energy Gas Transmission Comp Description: CenterPoint Energy Gas Transmission Co. submits an amended negotiated rate agreement with Cross Timbers Energy Services, Inc. Filed Date: 08/03/2009. Accession Number: 20090804–0157. Comment Date: 5 p.m. Eastern Time on Monday, August 17, 2009. Any person desiring to intervene or to protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214) on or before 5 p.m. Eastern time on the specified comment date. It is not necessary to separately intervene again in a subdocket related to a compliance filing if you have previously intervened in the same docket. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. In reference to filings initiating a new proceeding, interventions or protests submitted on or before the comment deadline need not be served on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the VerDate Nov<24>2008 16:27 Sep 02, 2009 Jkt 217001 FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St., NE., Washington, DC 20426. The filings in the above proceedings are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed dockets(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on September 16, 2009. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. E9–21248 Filed 9–2–09; 8:45 am] Kimberly D. Bose, Secretary. [FR Doc. E9–21243 Filed 9–2–09; 8:45 am] BILLING CODE 6717–01–P BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Docket No. ER09–1400–000] [Docket No. CP09–457–000] Milford Wind Corridor Phase I, LLC; Notice of Filing Kinder Morgan Louisiana Pipeline LLC; Notice of Request Under Blanket Authorization August 27, 2009. Take notice that, on August 26, 2009, Milford Wind Corridor Phase I, LLC filed to supplement its filing in the above-captioned proceeding with information required under the Commission’s regulations. Such filing served to reset the filing date in this proceeding. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 August 27, 2009. Take notice that on August 21, 2009, Kinder Morgan Louisiana Pipeline LLC (KMLP), filed in Docket No. CP09–457– 000, a prior notice request pursuant to sections 157.205, 157.208, 157.211 and 157.212 of the Commission’s regulations under the Natural Gas Act (NGA), for authorization to construct and operate facilities to connect the KMLP system to Egan Hub Storage, LLC (Egan Hub) in Acadia Parish, Louisiana in order to deliver revaporized liquefied natural gas to Egan Hub and subsequently to receive gas from Egan Hub, all as more fully set forth in the application which is on file with the Commission and open to public inspection. KMLP proposes to perform these activities under its blanket certificate issued June 22, 2007, E:\FR\FM\03SEN1.SGM 03SEN1

Agencies

[Federal Register Volume 74, Number 170 (Thursday, September 3, 2009)]
[Notices]
[Pages 45635-45636]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-21245]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2088-075]


South Feather Water and Power Agency; Notice of Intent To Prepare 
an Environmental Document and Soliciting Comments

August 27, 2009.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Application Type: Intent to raise dam crest and modify spillway.
    b. Project No: 2088-075.
    c. Date Filed: May 21, 2009.
    d. Applicant: South Feather Water and Power Agency .
    e. Name of Project: South Feather Power Project.
    f. Location: The South Feather Power Project is located on the 
South Fork Feather River, Lost Creek, and Slate Creek in Butte, Plumas, 
and Yuba Counties, California. This project occupies federal and non-
federal lands.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Kathy Zancanella, South Feather Water and 
Power Agency Power Division, 2310 Oro Quincy Highway, Oroville, CA 
95966, Tel: (503) 534-1221.
    i. FERC Contact: Joy Jones, Telephone (202) 502-6760, and e-mail: 
joy.jones@ferc.gov.
    j. Deadline for Filing Comments, Motions To Intervene, and 
Protests: September 28, 2009.
    All documents (original and eight copies) should be filed with: 
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., 
Washington, DC 20426.
    The Commission's Rules of Practice and Procedure require all 
interveners filing documents with the Commission to serve a copy of 
that document on each person whose name appears on the official service 
list for the project. Further, if an intervener files comments or 
documents with the Commission relating to the merits of an issue that 
may affect the responsibilities of a particular resource agency, they 
must also serve a copy of the document on that resource agency. A copy 
of any motion to intervene must also be served upon each representative 
of the Applicant specified in the particular application.
    k. Description of Request: South Feather Water and Power Agency has 
filed an Environmental Report addressing its intent to modify the crest 
of Sly Creek Dam, part of the South Feather Power Project (FERC No. 
2088). The project consists of four separate developments: Sly Creek, 
Woodleaf, Forbestown and Kelly Ridge. The proposed work at Sly Creek 
Dam would take place within the Sly Creek development. Water from Sly 
Creek reservoir is controlled by Sly Creek Dam, which releases water to 
the Lost Creek reservoir downstream of the dam. A hydraulic study on 
Sly Creek reservoir included an estimate of the probable maximum flood 
(PMF) flow event for the reservoir, which indicated that during a PMF 
event, the dam crest would overtop unless it was raised and/or the 
spillway was modified. To ensure the licensee's compliance with FERC 
engineering guidelines and safety regulations, modifications to the dam 
are necessary. The licensee is proposing to raise the dam crest, 
replace the spillway gate and platform, raise the abutment walls of the 
spillway channel, and improve the roadway approaching the spillway and 
associated drainage structures. Under the licensee's proposal, the 
operating level of Sly Creek reservoir's water surface elevation would 
remain consistent with the original water surface elevation approved in 
the project license.
    The Commission intends to prepare an environmental document under 
the National Environmental Policy Act (NEPA) for the Sly Creek Dam 
crest raise project. The NEPA document will be used by the Commission 
to identify environmental impacts and to identify measures that would 
help mitigate the impacts caused by modification activities.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street, NE., Room 2A, Washington, 
DC 20426. This filing may also be viewed on the Commission's Web site 
at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket 
number excluding the last three digits in the docket number field to 
access the document. You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of 
new filings and issuances related to this or other pending projects. 
For assistance, call 1-866-208-3676 or e-mail 
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments: Anyone may submit comments with respect to the 
licensee's proposed activities. In determining the appropriate action 
to take, the Commission will consider all comments filed. Any comments 
must be received on or before the specified comment date for the 
particular application.
    o. Any filing made with the Commission must bear in all capital 
letters the title ``COMMENTS'' and the Project Number (P-2088-075) of 
the particular application to which the filing refers.
    p. Agency Comments: Federal, state, and local agencies are invited 
to file

[[Page 45636]]

comments on the described application. A copy of the application may be 
obtained by agencies directly from the Applicant. If an agency does not 
file comments within the time specified for filing comments, it will be 
presumed to have no comments. One copy of an agency's comments must 
also be sent to the Applicant's representatives.
    q. Comments may be filed electronically via the Internet in lieu of 
paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the 
Commission's Web site at https://www.ferc.gov under the ``e-Filing'' 
link.

Kimberly D. Bose,
Secretary.
[FR Doc. E9-21245 Filed 9-2-09; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.