Dahlberg Light and Power Company; Notice of Petition for Declaratory Order and Soliciting Comments, Motions To Intervene, and/or Protests, 45625-45626 [E9-21241]
Download as PDF
Federal Register / Vol. 74, No. 170 / Thursday, September 3, 2009 / Notices
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the applicant’s representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–21242 Filed 9–2–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2413–113]
Georgia Power Company; Notice of
Application for Amendment of License
and Soliciting Comments, Motions To
Intervene, and Protests
pwalker on DSK8KYBLC1PROD with NOTICES
August 27, 2009.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Non-Project Use
of Project Lands and Waters.
b. Project No: 2413–113.
c. Date Filed: August 24, 2009.
d. Applicant: Georgia Power
Company.
e. Name of Project: Wallace Dam
Project.
f. Location: The proposed non-project
use would be located at the Reynolds
Plantation on Lake Oconee, in Greene
County, Georgia.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. Herbie
Johnson, Lake Resources Manager, 125
Wallace Dam Road NE, Eatonton, GA
31024, telephone 706–485–8704.
i. FERC Contact: Lorance Yates,
telephone 678–245–3084, and e-mail:
lorance.yates@ferc.gov.
j. Deadline for Filing Comments,
Motions To Intervene, and Protests:
September 28, 2009.
All documents (original and eight
copies) should be filed with: Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
The Commission’s Rules of Practice
require all interveners filing documents
with the Commission to serve a copy of
that document on each person on the
official service list for the project.
Further, if an intervener files comments
or documents with the Commission
relating to the merits of an issue that
VerDate Nov<24>2008
16:27 Sep 02, 2009
Jkt 217001
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency. A copy of any
motion to intervene must also be served
upon each representative of the
Applicant specified in the particular
application.
k. Description of Request: Georgia
Power Company filed an application
seeking Commission authorization to
permit the construction of a vehicular
bridge on Lake Oconee, at the Reynolds
Plantation, in Greene County, Georgia.
Specifically, the proposed bridge would
be 450 feet in length and consist of
reinforced concrete beams with either
steel pile or shallow foundation
construction. The bridge would occupy
0.22 acre of project land (.02 acre for
reinforced concrete pilings plus .20 acre
under the bridge) and 154 linear feet of
shoreline. All required approvals from
Greene County and the state of Georgia
would be obtained before
implementation of the proposal.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3372 or
e-mail FERCOnlineSupport@ferc.gov;
for TTY, call (202) 502–8659. A copy is
also available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions To
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
45625
comment date for the particular
application.
o. Any filings must bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
p. Agency Comments: Federal, State,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
q. Comments, protests and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov under the ‘‘eFiling’’ link.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–21246 Filed 9–2–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. DI09–11–000]
Dahlberg Light and Power Company;
Notice of Petition for Declaratory Order
and Soliciting Comments, Motions To
Intervene, and/or Protests
August 27, 2009.
Take notice that the following
application has been filed with the
Commission and is available for public
inspection:
a. Application Type: Petition for
Declaratory Order.
b. Docket No: DI09–11–000.
c. Date Filed: July 27, 2009.
d. Applicant: Dahlberg Light and
Power Company.
e. Name of Project: Gordon
Hydroelectric Project.
f. Location: The Gordon Hydroelectric
Project is located on the Eau Claire
River in Gordon, Douglas County,
Wisconsin. The project is not located on
federal land.
g. Filed Pursuant to: Section 23(b)(1)
of the Federal Power Act, 16 U.S.C.
817(b).
h. Applicant Contact: Charles Alsberg,
North American Hydro Holdings, 116 N.
State Street, P.O. Box 167, Neshkoro, WI
54960; Telephone: (920) 293–4628, ext.
E:\FR\FM\03SEN1.SGM
03SEN1
pwalker on DSK8KYBLC1PROD with NOTICES
45626
Federal Register / Vol. 74, No. 170 / Thursday, September 3, 2009 / Notices
14; Fax: (920) 293–8087; E-mail:
chuck@nahydro.com.
i. FERC Contact: Any questions on
this notice should be addressed to
Henry G. Ecton (202) 502–8768, or
E-mail: henry.ecton@ferc.gov.
j. Deadline for Filing Comments and/
or Motions: September 28, 2009.
All documents (original and eight
copies) should be filed with: Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426. Comments, protests, and
interventions may be filed electronically
via the Internet in lieu of paper. Any
questions, please contact the Secretary’s
Office. See, 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site at: https://
www.ferc.gov.
Please include the docket number
(DI09–11–000) on any protests,
comments or motions filed.
k. Description of Project: The existing
run-of-river project consists of: (1) A
reservoir with a storage capacity of 740acre-feet; (2) a 62-foot-long, 25-footwide, 34-foot-high concrete spillway
and forebay, with two earthen
embankments approximately 1,500-feetlong; (3) a powerhouse containing two
generators with a combined capacity of
257 kW; (4) a 739-foot-long transmission
line; and (5) appurtenant facilities.
When a Petition for Declaratory Order
is filed with the Federal Energy
Regulatory Commission, the Federal
Power Act requires the Commission to
investigate and determine if the
interests of interstate or foreign
commerce would be affected by the
project. The Commission also
determines whether or not the project:
(1) Would be located on a navigable
waterway; (2) would occupy or affect
public lands or reservations of the
United States; (3) would utilize surplus
water or water power from a
government dam; or (4) if applicable,
has involved or would involve any
construction subsequent to 1935 that
may have increased or would increase
the project’s head or generating
capacity, or have otherwise significantly
modified the project’s pre-1935 design
or operation.
l. Locations of the Application: Copies
of this filing are on file with the
Commission and are available for public
inspection. This filing may be viewed
on the Web at https://www.ferc.gov using
the ‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, please contact
FERC Online Support at
FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or TTY, contact
(202) 502–8659.
VerDate Nov<24>2008
16:27 Sep 02, 2009
Jkt 217001
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions To
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTESTS’’, and/or
‘‘MOTIONS TO INTERVENE’’, as
applicable, and the Docket Number of
the particular application to which the
filing refers. A copy of any motion to
intervene must also be served upon each
representative of the applicant specified
in the particular application.
p. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the applicant’s representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–21241 Filed 9–2–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP09–455–000; PF08–31–000;
Docket No. CP09–456–000; PF08–32–000]
Florida Gas Transmission Company,
LLC; Transcontinental Gas Pipe Line
Company, LLC; Florida Gas
Transmission Company, LLC; Notice
of Application
August 27, 2009.
Take notice that on August 14, 2009,
Florida Gas Transmission Company,
LLC (FGT), 5455 Westheimer Road,
Houston, Texas 77056–5306, filed an
application to section 7(c) of the Natural
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
Gas Act (NGA) seeking authority to
construct, own, operate and maintain
certain natural gas transmission
facilities, including a metering and
regulation station and associated and
appurtenant facilities and the
modification of a compressor facility all
in Mobile County, Alabama; and to
provide firm transportation services
under Subpart G of Part 284 of the
Commission’s Regulations (The Mobile
Bay Lateral Extension Project), all as
more fully set forth in the application.
This filing is available for review at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.fer.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or for TTY,
contact (202) 502–8659.
Specifically, The Mobile Bay Lateral
Extension Project will consist of 8.83
miles of 24-inch pipeline and related
facilities. The project will provide an
annual average of 342,610 MMbtu/day
of additional firm transportation
capacity. FGT estimates that the cost of
the project will be $34 million. In
addition, FGT is requesting to include
in the overall cost of service, FGT’s
share of the Transco-FGT Pascagoula
Expansion Project filed, concurrently, in
Docket No. CP09–456–000.
Also, take notice that on August 14,
2009, Transcontinental Gas Pipe Line
Company, LLC (Transco), Post Office
Box 1396, Houston, Texas 77251, and
FGT (collectively Applicants), filed an
application to section 7(c) of the NGA
seeking authority to jointly construct,
and operate the Pascagoula Expansion
Project, a greenfield natural gas pipeline
connecting the Gulf LNG Pipeline with
Applicants’ existing Mobile Bay Lateral,
and related facilities. The project will
provide 810,000 dekatherms per day
(Dth/day) of firm transportation service,
with a target in-service date of
September 30, 2011. Applicants
estimate that the proposed project will
cost approximately $59 million.
Specifically, the Pascagoula
Expansion Project will consist of 15
miles of 26-inch pipeline and related
facilities extending from the
interconnection with Gulf LNG Pipeline
to Applicants’ existing Mobile Bay
Lateral in Mobile County, Alabama.
Any questions regarding the Mobile
Bay Lateral Extension Project should be
directed to Stephen T. Veatch, Sr.
Director, Certificates and Tariffs, Florida
Gas Transmission Company, LLC, 5444
E:\FR\FM\03SEN1.SGM
03SEN1
Agencies
[Federal Register Volume 74, Number 170 (Thursday, September 3, 2009)]
[Notices]
[Pages 45625-45626]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-21241]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. DI09-11-000]
Dahlberg Light and Power Company; Notice of Petition for
Declaratory Order and Soliciting Comments, Motions To Intervene, and/or
Protests
August 27, 2009.
Take notice that the following application has been filed with the
Commission and is available for public inspection:
a. Application Type: Petition for Declaratory Order.
b. Docket No: DI09-11-000.
c. Date Filed: July 27, 2009.
d. Applicant: Dahlberg Light and Power Company.
e. Name of Project: Gordon Hydroelectric Project.
f. Location: The Gordon Hydroelectric Project is located on the Eau
Claire River in Gordon, Douglas County, Wisconsin. The project is not
located on federal land.
g. Filed Pursuant to: Section 23(b)(1) of the Federal Power Act, 16
U.S.C. 817(b).
h. Applicant Contact: Charles Alsberg, North American Hydro
Holdings, 116 N. State Street, P.O. Box 167, Neshkoro, WI 54960;
Telephone: (920) 293-4628, ext.
[[Page 45626]]
14; Fax: (920) 293-8087; E-mail: chuck@nahydro.com.
i. FERC Contact: Any questions on this notice should be addressed
to Henry G. Ecton (202) 502-8768, or E-mail: henry.ecton@ferc.gov.
j. Deadline for Filing Comments and/or Motions: September 28, 2009.
All documents (original and eight copies) should be filed with:
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426. Comments, protests, and interventions may be
filed electronically via the Internet in lieu of paper. Any questions,
please contact the Secretary's Office. See, 18 CFR 385.2001(a)(1)(iii)
and the instructions on the Commission's Web site at: https://www.ferc.gov.
Please include the docket number (DI09-11-000) on any protests,
comments or motions filed.
k. Description of Project: The existing run-of-river project
consists of: (1) A reservoir with a storage capacity of 740-acre-feet;
(2) a 62-foot-long, 25-foot-wide, 34-foot-high concrete spillway and
forebay, with two earthen embankments approximately 1,500-feet-long;
(3) a powerhouse containing two generators with a combined capacity of
257 kW; (4) a 739-foot-long transmission line; and (5) appurtenant
facilities.
When a Petition for Declaratory Order is filed with the Federal
Energy Regulatory Commission, the Federal Power Act requires the
Commission to investigate and determine if the interests of interstate
or foreign commerce would be affected by the project. The Commission
also determines whether or not the project: (1) Would be located on a
navigable waterway; (2) would occupy or affect public lands or
reservations of the United States; (3) would utilize surplus water or
water power from a government dam; or (4) if applicable, has involved
or would involve any construction subsequent to 1935 that may have
increased or would increase the project's head or generating capacity,
or have otherwise significantly modified the project's pre-1935 design
or operation.
l. Locations of the Application: Copies of this filing are on file
with the Commission and are available for public inspection. This
filing may be viewed on the Web at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll-free at (866) 208-3676, or TTY,
contact (202) 502-8659.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions To Intervene--Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents--Any filings must
bear in all capital letters the title ``COMMENTS'', ``PROTESTS'', and/
or ``MOTIONS TO INTERVENE'', as applicable, and the Docket Number of
the particular application to which the filing refers. A copy of any
motion to intervene must also be served upon each representative of the
applicant specified in the particular application.
p. Agency Comments--Federal, state, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the applicant's representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-21241 Filed 9-2-09; 8:45 am]