Office of New Reactors; Interim Staff Guidance on Ensuring Hazard-Consistent Seismic Input for Site Response and Soil Structure Interaction Analyses, 44879 [E9-20916]
Download as PDF
Federal Register / Vol. 74, No. 167 / Monday, August 31, 2009 / Notices
place at NSF, 4201 Wilson Blvd.,
Arlington, Virginia 22230.
These meetings will be closed to the
public. The proposals being reviewed
include information of a proprietary or
confidential nature, including technical
information; financial data, such as
salaries; and personal information
concerning individuals associated with
the proposals. These matters are exempt
under 5 U.S.C. 552b(c)(4) and (6) of the
Government in the Sunshine Act. NSF
will continue to review the agenda and
merits of each meeting for overall
compliance of the Federal Advisory
Committee Act.
These closed proposal review
meetings will not be announced on an
individual basis in the Federal Register.
NSF intends to publish a notice similar
to this on a quarterly basis. For an
advance listing of the closed proposal
review meetings that includes the
names of the proposal review panel and
the time, date, place, and any
information on changes, corrections, or
cancellations, please visit the NSF Website: https://www.nsf.gov/events/
advisory.jsp. This information may also
be requested by telephoning 703/292–
8180.
Dated: August 26, 2009.
Susanne Bolton,
Committee Management Officer.
[FR Doc. E9–20892 Filed 8–28–09; 8:45 am]
BILLING CODE 7555–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2009–0380]
Office of New Reactors; Interim Staff
Guidance on Ensuring HazardConsistent Seismic Input for Site
Response and Soil Structure
Interaction Analyses
cprice-sewell on DSK2BSOYB1PROD with NOTICES
AGENCY: Nuclear Regulatory
Commission (NRC).
ACTION: Solicitation of public comment.
SUMMARY: The NRC staff is soliciting
public comment on its Proposed Interim
Staff Guidance (ISG) DC/COL–ISG–017
(Agencywide Documents Access and
Management System (ADAMS)
Accession No. ML092230543). This ISG
supplements the guidance provided to
the NRC staff in Sections 2.5 and 3.7 of
NUREG–0800, ‘‘Standard Review Plan
(SRP) for the Review of Safety Analysis
Reports for Nuclear Power Plants,’’
March 2007, and DC/COL–ISG–01,
‘‘Interim Staff Guidance on Seismic
Issues Associated with High Frequency
Ground Motion in Design Certification
and Combined License Applications,’’
VerDate Nov<24>2008
14:57 Aug 28, 2009
Jkt 217001
issued May 19, 2008 (ADAMS
Accession No. ML081400293). The NRC
staff issues DC/COL–ISGs to facilitate
timely implementation of current staff
guidance and to facilitate activities
associated with review of applications
for design certifications and combined
licenses by the Office of New Reactors.
The NRC staff intends to incorporate the
final approved DC/COL–ISG–017 into
the next revision of SRP Sections 2.5
and 3.7 and Regulatory Guide 1.206,
‘‘Combined License Applications for
Nuclear Power Plants (LWR Edition),’’
June 2007.
DATES: Comments must be filed no later
than 30 days from the date of
publication of this notice in the Federal
Register. Comments received after this
date will be considered, if it is practical
to do so, but the Commission is able to
ensure consideration only for comments
received on or before this date.
ADDRESSES: You may submit comments
by any one of the following methods.
Please include Docket ID NRC–2009–
0380 in the subject line of your
comments. Comments submitted in
writing or in electronic form will be
posted on the NRC Web site and on the
Federal rulemaking Web site
Regulations.gov. Because your
comments will not be edited to remove
any identifying or contact information,
the NRC cautions you against including
any information in your submission that
you do not want to be publicly
disclosed.
The NRC requests that any party
soliciting or aggregating comments
received from other persons for
submission to the NRC inform those
persons that the NRC will not edit their
comments to remove any identifying or
contact information, and therefore, they
should not include any information in
their comments that they do not want
publicly disclosed.
Federal Rulemaking Web site: Go to
https://www.regulations.gov and search
for documents filed under Docket ID
NRC–2009–0380. Address questions
about NRC dockets to Carol Gallagher
301–492–3668; e-mail
Carol.Gallagher@nrc.gov.
Mail comments to: Michael T. Lesar,
Chief, Rulemaking and Directives
Branch (RDB), Division of
Administrative Services, Office of
Administration, Mail Stop: TWB–05–
B01M, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001, or by fax to RDB at (301) 492–
3446.
The NRC ADAMS provides text and
image files of NRC’s public documents.
These documents may be accessed
through the NRC’s Public Electronic
PO 00000
Frm 00066
Fmt 4703
Sfmt 4703
44879
Reading Room on the Internet at https://
www.nrc.gov/reading-rm/adams.html.
Persons who do not have access to
ADAMS or who encounter problems in
accessing the documents located in
ADAMS should contact the NRC Public
Document Room reference staff by
telephone at 1–800–397–4209, 301–
415–4737, or by e-mail at
pdr.resource@nrc.gov.
FOR FURTHER INFORMATION CONTACT: Mr.
William F. Burton, Chief, Rulemaking
and Guidance Development Branch,
Division of New Reactor Licensing,
Office of New Reactors, U.S. Nuclear
Regulatory Commission, Washington,
DC, 20555–0001; telephone 301–415–
6332 or e-mail at
william.burton@nrc.gov.
The
agency posts its issued staff guidance in
the agency external Web page (https://
www.nrc.gov/reading-rm/doccollections/isg/).
The NRC staff is issuing this notice to
solicit public comments on the
proposed DC/COL–ISG–017. After the
NRC staff considers any public
comments, it will make a determination
regarding the proposed DC/COL–ISG–
017.
SUPPLEMENTARY INFORMATION:
Dated at Rockville, Maryland, this 25th day
of August 2009.
For the Nuclear Regulatory Commission,
William F. Burton,
Branch Chief, Rulemaking and Guidance
Development Branch, Division of New Reactor
Licensing, Office of New Reactors.
[FR Doc. E9–20916 Filed 8–28–09; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[NRC–2008–0252; Docket No. 052–00011]
Notice of Issuance of Early Site Permit
and Limited Work Authorization for the
Vogtle Electric Generating Plant ESP
Site
AGENCY: Nuclear Regulatory
Commission.
ACTION: Notice of Issuance of Early Site
Permit and Limited Work
Authorization.
FOR FURTHER INFORMATION CONTACT:
Christian Araguas, Project Manager,
AP1000 Projects Branch, Division of
New Reactor Licensing, Office of New
Reactors, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001. Telephone: (301) 415–3637; email: christian.araguas@nrc.gov.
SUPPLEMENTARY INFORMATION:
E:\FR\FM\31AUN1.SGM
31AUN1
Agencies
[Federal Register Volume 74, Number 167 (Monday, August 31, 2009)]
[Notices]
[Page 44879]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-20916]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[NRC-2009-0380]
Office of New Reactors; Interim Staff Guidance on Ensuring
Hazard-Consistent Seismic Input for Site Response and Soil Structure
Interaction Analyses
AGENCY: Nuclear Regulatory Commission (NRC).
ACTION: Solicitation of public comment.
-----------------------------------------------------------------------
SUMMARY: The NRC staff is soliciting public comment on its Proposed
Interim Staff Guidance (ISG) DC/COL-ISG-017 (Agencywide Documents
Access and Management System (ADAMS) Accession No. ML092230543). This
ISG supplements the guidance provided to the NRC staff in Sections 2.5
and 3.7 of NUREG-0800, ``Standard Review Plan (SRP) for the Review of
Safety Analysis Reports for Nuclear Power Plants,'' March 2007, and DC/
COL-ISG-01, ``Interim Staff Guidance on Seismic Issues Associated with
High Frequency Ground Motion in Design Certification and Combined
License Applications,'' issued May 19, 2008 (ADAMS Accession No.
ML081400293). The NRC staff issues DC/COL-ISGs to facilitate timely
implementation of current staff guidance and to facilitate activities
associated with review of applications for design certifications and
combined licenses by the Office of New Reactors. The NRC staff intends
to incorporate the final approved DC/COL-ISG-017 into the next revision
of SRP Sections 2.5 and 3.7 and Regulatory Guide 1.206, ``Combined
License Applications for Nuclear Power Plants (LWR Edition),'' June
2007.
DATES: Comments must be filed no later than 30 days from the date of
publication of this notice in the Federal Register. Comments received
after this date will be considered, if it is practical to do so, but
the Commission is able to ensure consideration only for comments
received on or before this date.
ADDRESSES: You may submit comments by any one of the following methods.
Please include Docket ID NRC-2009-0380 in the subject line of your
comments. Comments submitted in writing or in electronic form will be
posted on the NRC Web site and on the Federal rulemaking Web site
Regulations.gov. Because your comments will not be edited to remove any
identifying or contact information, the NRC cautions you against
including any information in your submission that you do not want to be
publicly disclosed.
The NRC requests that any party soliciting or aggregating comments
received from other persons for submission to the NRC inform those
persons that the NRC will not edit their comments to remove any
identifying or contact information, and therefore, they should not
include any information in their comments that they do not want
publicly disclosed.
Federal Rulemaking Web site: Go to https://www.regulations.gov and
search for documents filed under Docket ID NRC-2009-0380. Address
questions about NRC dockets to Carol Gallagher 301-492-3668; e-mail
Carol.Gallagher@nrc.gov.
Mail comments to: Michael T. Lesar, Chief, Rulemaking and
Directives Branch (RDB), Division of Administrative Services, Office of
Administration, Mail Stop: TWB-05-B01M, U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, or by fax to RDB at (301) 492-
3446.
The NRC ADAMS provides text and image files of NRC's public
documents. These documents may be accessed through the NRC's Public
Electronic Reading Room on the Internet at https://www.nrc.gov/reading-rm/adams.html. Persons who do not have access to ADAMS or who encounter
problems in accessing the documents located in ADAMS should contact the
NRC Public Document Room reference staff by telephone at 1-800-397-
4209, 301-415-4737, or by e-mail at pdr.resource@nrc.gov.
FOR FURTHER INFORMATION CONTACT: Mr. William F. Burton, Chief,
Rulemaking and Guidance Development Branch, Division of New Reactor
Licensing, Office of New Reactors, U.S. Nuclear Regulatory Commission,
Washington, DC, 20555-0001; telephone 301-415-6332 or e-mail at
william.burton@nrc.gov.
SUPPLEMENTARY INFORMATION: The agency posts its issued staff guidance
in the agency external Web page (https://www.nrc.gov/reading-rm/doc-collections/isg/).
The NRC staff is issuing this notice to solicit public comments on
the proposed DC/COL-ISG-017. After the NRC staff considers any public
comments, it will make a determination regarding the proposed DC/COL-
ISG-017.
Dated at Rockville, Maryland, this 25th day of August 2009.
For the Nuclear Regulatory Commission,
William F. Burton,
Branch Chief, Rulemaking and Guidance Development Branch, Division of
New Reactor Licensing, Office of New Reactors.
[FR Doc. E9-20916 Filed 8-28-09; 8:45 am]
BILLING CODE 7590-01-P