Office of New Reactors; Interim Staff Guidance on Ensuring Hazard-Consistent Seismic Input for Site Response and Soil Structure Interaction Analyses, 44879 [E9-20916]

Download as PDF Federal Register / Vol. 74, No. 167 / Monday, August 31, 2009 / Notices place at NSF, 4201 Wilson Blvd., Arlington, Virginia 22230. These meetings will be closed to the public. The proposals being reviewed include information of a proprietary or confidential nature, including technical information; financial data, such as salaries; and personal information concerning individuals associated with the proposals. These matters are exempt under 5 U.S.C. 552b(c)(4) and (6) of the Government in the Sunshine Act. NSF will continue to review the agenda and merits of each meeting for overall compliance of the Federal Advisory Committee Act. These closed proposal review meetings will not be announced on an individual basis in the Federal Register. NSF intends to publish a notice similar to this on a quarterly basis. For an advance listing of the closed proposal review meetings that includes the names of the proposal review panel and the time, date, place, and any information on changes, corrections, or cancellations, please visit the NSF Website: https://www.nsf.gov/events/ advisory.jsp. This information may also be requested by telephoning 703/292– 8180. Dated: August 26, 2009. Susanne Bolton, Committee Management Officer. [FR Doc. E9–20892 Filed 8–28–09; 8:45 am] BILLING CODE 7555–01–P NUCLEAR REGULATORY COMMISSION [NRC–2009–0380] Office of New Reactors; Interim Staff Guidance on Ensuring HazardConsistent Seismic Input for Site Response and Soil Structure Interaction Analyses cprice-sewell on DSK2BSOYB1PROD with NOTICES AGENCY: Nuclear Regulatory Commission (NRC). ACTION: Solicitation of public comment. SUMMARY: The NRC staff is soliciting public comment on its Proposed Interim Staff Guidance (ISG) DC/COL–ISG–017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML092230543). This ISG supplements the guidance provided to the NRC staff in Sections 2.5 and 3.7 of NUREG–0800, ‘‘Standard Review Plan (SRP) for the Review of Safety Analysis Reports for Nuclear Power Plants,’’ March 2007, and DC/COL–ISG–01, ‘‘Interim Staff Guidance on Seismic Issues Associated with High Frequency Ground Motion in Design Certification and Combined License Applications,’’ VerDate Nov<24>2008 14:57 Aug 28, 2009 Jkt 217001 issued May 19, 2008 (ADAMS Accession No. ML081400293). The NRC staff issues DC/COL–ISGs to facilitate timely implementation of current staff guidance and to facilitate activities associated with review of applications for design certifications and combined licenses by the Office of New Reactors. The NRC staff intends to incorporate the final approved DC/COL–ISG–017 into the next revision of SRP Sections 2.5 and 3.7 and Regulatory Guide 1.206, ‘‘Combined License Applications for Nuclear Power Plants (LWR Edition),’’ June 2007. DATES: Comments must be filed no later than 30 days from the date of publication of this notice in the Federal Register. Comments received after this date will be considered, if it is practical to do so, but the Commission is able to ensure consideration only for comments received on or before this date. ADDRESSES: You may submit comments by any one of the following methods. Please include Docket ID NRC–2009– 0380 in the subject line of your comments. Comments submitted in writing or in electronic form will be posted on the NRC Web site and on the Federal rulemaking Web site Regulations.gov. Because your comments will not be edited to remove any identifying or contact information, the NRC cautions you against including any information in your submission that you do not want to be publicly disclosed. The NRC requests that any party soliciting or aggregating comments received from other persons for submission to the NRC inform those persons that the NRC will not edit their comments to remove any identifying or contact information, and therefore, they should not include any information in their comments that they do not want publicly disclosed. Federal Rulemaking Web site: Go to https://www.regulations.gov and search for documents filed under Docket ID NRC–2009–0380. Address questions about NRC dockets to Carol Gallagher 301–492–3668; e-mail Carol.Gallagher@nrc.gov. Mail comments to: Michael T. Lesar, Chief, Rulemaking and Directives Branch (RDB), Division of Administrative Services, Office of Administration, Mail Stop: TWB–05– B01M, U.S. Nuclear Regulatory Commission, Washington, DC 20555– 0001, or by fax to RDB at (301) 492– 3446. The NRC ADAMS provides text and image files of NRC’s public documents. These documents may be accessed through the NRC’s Public Electronic PO 00000 Frm 00066 Fmt 4703 Sfmt 4703 44879 Reading Room on the Internet at https:// www.nrc.gov/reading-rm/adams.html. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the NRC Public Document Room reference staff by telephone at 1–800–397–4209, 301– 415–4737, or by e-mail at pdr.resource@nrc.gov. FOR FURTHER INFORMATION CONTACT: Mr. William F. Burton, Chief, Rulemaking and Guidance Development Branch, Division of New Reactor Licensing, Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC, 20555–0001; telephone 301–415– 6332 or e-mail at william.burton@nrc.gov. The agency posts its issued staff guidance in the agency external Web page (https:// www.nrc.gov/reading-rm/doccollections/isg/). The NRC staff is issuing this notice to solicit public comments on the proposed DC/COL–ISG–017. After the NRC staff considers any public comments, it will make a determination regarding the proposed DC/COL–ISG– 017. SUPPLEMENTARY INFORMATION: Dated at Rockville, Maryland, this 25th day of August 2009. For the Nuclear Regulatory Commission, William F. Burton, Branch Chief, Rulemaking and Guidance Development Branch, Division of New Reactor Licensing, Office of New Reactors. [FR Doc. E9–20916 Filed 8–28–09; 8:45 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION [NRC–2008–0252; Docket No. 052–00011] Notice of Issuance of Early Site Permit and Limited Work Authorization for the Vogtle Electric Generating Plant ESP Site AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance of Early Site Permit and Limited Work Authorization. FOR FURTHER INFORMATION CONTACT: Christian Araguas, Project Manager, AP1000 Projects Branch, Division of New Reactor Licensing, Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555– 0001. Telephone: (301) 415–3637; email: christian.araguas@nrc.gov. SUPPLEMENTARY INFORMATION: E:\FR\FM\31AUN1.SGM 31AUN1

Agencies

[Federal Register Volume 74, Number 167 (Monday, August 31, 2009)]
[Notices]
[Page 44879]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-20916]


=======================================================================
-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[NRC-2009-0380]


Office of New Reactors; Interim Staff Guidance on Ensuring 
Hazard-Consistent Seismic Input for Site Response and Soil Structure 
Interaction Analyses

AGENCY: Nuclear Regulatory Commission (NRC).

ACTION: Solicitation of public comment.

-----------------------------------------------------------------------

SUMMARY: The NRC staff is soliciting public comment on its Proposed 
Interim Staff Guidance (ISG) DC/COL-ISG-017 (Agencywide Documents 
Access and Management System (ADAMS) Accession No. ML092230543). This 
ISG supplements the guidance provided to the NRC staff in Sections 2.5 
and 3.7 of NUREG-0800, ``Standard Review Plan (SRP) for the Review of 
Safety Analysis Reports for Nuclear Power Plants,'' March 2007, and DC/
COL-ISG-01, ``Interim Staff Guidance on Seismic Issues Associated with 
High Frequency Ground Motion in Design Certification and Combined 
License Applications,'' issued May 19, 2008 (ADAMS Accession No. 
ML081400293). The NRC staff issues DC/COL-ISGs to facilitate timely 
implementation of current staff guidance and to facilitate activities 
associated with review of applications for design certifications and 
combined licenses by the Office of New Reactors. The NRC staff intends 
to incorporate the final approved DC/COL-ISG-017 into the next revision 
of SRP Sections 2.5 and 3.7 and Regulatory Guide 1.206, ``Combined 
License Applications for Nuclear Power Plants (LWR Edition),'' June 
2007.

DATES: Comments must be filed no later than 30 days from the date of 
publication of this notice in the Federal Register. Comments received 
after this date will be considered, if it is practical to do so, but 
the Commission is able to ensure consideration only for comments 
received on or before this date.

ADDRESSES: You may submit comments by any one of the following methods. 
Please include Docket ID NRC-2009-0380 in the subject line of your 
comments. Comments submitted in writing or in electronic form will be 
posted on the NRC Web site and on the Federal rulemaking Web site 
Regulations.gov. Because your comments will not be edited to remove any 
identifying or contact information, the NRC cautions you against 
including any information in your submission that you do not want to be 
publicly disclosed.
    The NRC requests that any party soliciting or aggregating comments 
received from other persons for submission to the NRC inform those 
persons that the NRC will not edit their comments to remove any 
identifying or contact information, and therefore, they should not 
include any information in their comments that they do not want 
publicly disclosed.
    Federal Rulemaking Web site: Go to https://www.regulations.gov and 
search for documents filed under Docket ID NRC-2009-0380. Address 
questions about NRC dockets to Carol Gallagher 301-492-3668; e-mail 
Carol.Gallagher@nrc.gov.
    Mail comments to: Michael T. Lesar, Chief, Rulemaking and 
Directives Branch (RDB), Division of Administrative Services, Office of 
Administration, Mail Stop: TWB-05-B01M, U.S. Nuclear Regulatory 
Commission, Washington, DC 20555-0001, or by fax to RDB at (301) 492-
3446.
    The NRC ADAMS provides text and image files of NRC's public 
documents. These documents may be accessed through the NRC's Public 
Electronic Reading Room on the Internet at https://www.nrc.gov/reading-rm/adams.html. Persons who do not have access to ADAMS or who encounter 
problems in accessing the documents located in ADAMS should contact the 
NRC Public Document Room reference staff by telephone at 1-800-397-
4209, 301-415-4737, or by e-mail at pdr.resource@nrc.gov.

FOR FURTHER INFORMATION CONTACT: Mr. William F. Burton, Chief, 
Rulemaking and Guidance Development Branch, Division of New Reactor 
Licensing, Office of New Reactors, U.S. Nuclear Regulatory Commission, 
Washington, DC, 20555-0001; telephone 301-415-6332 or e-mail at 
william.burton@nrc.gov.

SUPPLEMENTARY INFORMATION: The agency posts its issued staff guidance 
in the agency external Web page (https://www.nrc.gov/reading-rm/doc-collections/isg/).
    The NRC staff is issuing this notice to solicit public comments on 
the proposed DC/COL-ISG-017. After the NRC staff considers any public 
comments, it will make a determination regarding the proposed DC/COL-
ISG-017.

    Dated at Rockville, Maryland, this 25th day of August 2009.

    For the Nuclear Regulatory Commission,
William F. Burton,
Branch Chief, Rulemaking and Guidance Development Branch, Division of 
New Reactor Licensing, Office of New Reactors.
[FR Doc. E9-20916 Filed 8-28-09; 8:45 am]
BILLING CODE 7590-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.