Ridgewood Maine Hydro Partners, L.P.; KEI (Maine) Power Management (I) LLC; KEI (Maine) Power Management (II) LLC; KEI (Maine) Power Management (III) LLC; KEI (Maine) Power Management (IV) LLC; Notice of Application for Transfer of Licenses, and Soliciting Comments and Motions To Intervene, 42884-42885 [E9-20368]
Download as PDF
42884
Federal Register / Vol. 74, No. 163 / Tuesday, August 25, 2009 / Notices
this special forum by visiting the EAC
Board of Advisors virtual meeting room
at https://www.eac.gov at any time
between Wednesday, September 9,
2009, 9 a.m. EDT and Friday, September
18, 2009, 9 p.m. EDT. The public also
may view the five draft chapters of the
Election Management Guidelines
Alternative, which will be posted on
EAC’s Web site beginning September 9,
2009. The public may file written
statements to the EAC Board of Advisors
at boardofadvisors@eac.gov. Data on
EAC’s Web site is accessible to visitors
with disabilities and meets the
requirements of section 508 of the
Rehabilitation Act.
PERSON TO CONTACT FOR INFORMATION:
Bryan Whitener, Telephone: (202) 566–
3100.
Alice Miller,
Chief Operating Officer, U.S. Election
Assistance Commission.
[FR Doc. E9–20567 Filed 8–21–09; 4:15 pm]
BILLING CODE 6820–KF–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13433–000]
D. Stephen Sorensen; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions to Intervene, and
Competing Applications
pwalker on DSK8KYBLC1PROD with NOTICES
August 14, 2009.
On April 16, 2009, D. Stephen
Sorenson filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act, proposing
to study the feasibility of the Piute Dam
Hydro Project located on the Sevier
River in Piute County, Utah. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following:
(1) An existing 1,403-foot-long, 80foot-high earthen Dam; (2) an existing
reservoir having a surface area of 3,360
acres and a storage capacity of 74,000
acre-feet and normal water surface
elevation of 5,990 feet mean sea level;
(3) a proposed penstock 4 feet wide and
560 feet long; (4) a proposed
powerhouse containing a 1,543-kilowatt
turbine generator; (5) a tailrace; (6) a
VerDate Nov<24>2008
22:52 Aug 24, 2009
Jkt 217001
proposed 2,300-foot-long overhead
transmission line; and (7) appurtenant
facilities. The proposed Piute Dam
Hydro Project would have an average
annual generation of 4.15 gigawatthours.
Applicant Contact: Robert W. Worley,
Sunrise Engineering, Inc., 25 East 500
North, Filmore, UT 64631, phone: (435)
743–6151.
FERC Contact: Joseph P. Hassell, 202–
502–8079.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at https://
www.ferc.gov/filing-comments.asp.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–13433) in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–20366 Filed 8–24–09; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 2808–011; 2809–026; 3562–
020; 4202–020; 11132–025; 11472–057;
11482–027; 11566–017]
Ridgewood Maine Hydro Partners,
L.P.; KEI (Maine) Power Management
(I) LLC; KEI (Maine) Power
Management (II) LLC; KEI (Maine)
Power Management (III) LLC; KEI
(Maine) Power Management (IV) LLC;
Notice of Application for Transfer of
Licenses, and Soliciting Comments
and Motions To Intervene
August 18, 2009.
On July 30, 2009, Ridgewood Maine
Hydro Partners, L.P. (Transferor) and
KEI (Maine) Power Management (I) LLC,
KEI (Maine) Power Management (II)
LLC, KEI (Maine) Power Management
(III) LLC, and KEI (Maine) Power
Management (IV) LLC, all wholly owned
subsidiaries of KEI (USA) Power
Management Inc. (Transferees) filed an
application for transfer of licenses for
the:
Lower Barker Mill Project located on
the Little Androscoggin River in
Androscoggin County; American Tissue
Dam Project located on the
Cobbosseecontee Stream, in Kennebec
County; Upper Barker Mill Project
located on the Little Androscoggin River
in Androscoggin County; Lowell
Tannery Project located on the
Passadumkeag River, Penobscot County;
Eustis Project located on the North
Branch of the Dead River, Franklin
County; Burnham Project located on the
Sebasticook River, Somerset and Waldo
Counties; Marcal Project located on the
Little Androscoggin River in
Androscoggin County; and Damariscotta
Project located on the Damariscotta
River, Lincoln County. These projects
are located in the state of Maine.
Applicants seek Commission approval
to transfer the licenses for the Lower
Barker Mill, American Tissue Dam,
Upper Barker Mill, Lowell Tannery,
Eustis, Burnham, Marcal, and
Damariscotta Projects from the
Transferor to the Transferees.
Applicant Contact: Transferor: Ms.
Maria Haggerty, Ridgewood Maine
Hydro Partners, L.P., c/o Ridgewood
Power Corporation, 977 Linwood
Avenue, Ridgewood, NJ 07450, phone
(201) 447–9000. Transferee: KEI (USA)
Power Management, Inc., Mr. Guy
Paquette, Kruger Energy, Inc., 3285
Bedford Road, Montreal, Quebec H3S 1
5, phone (514) 343–3247.
FERC Contact: Patricia W. Gillis, (202)
502–8735.
E:\FR\FM\25AUN1.SGM
25AUN1
Federal Register / Vol. 74, No. 163 / Tuesday, August 25, 2009 / Notices
Deadline for filing comments and
motions to intervene: 15 days from the
issuance of this notice. Comments and
motions to intervene may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii)(2008) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. If unable
to be filed electronically, documents
may be paper-filed. To paper-file, an
original and eight copies should be
mailed to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426. For more information on how to
submit these types of filings please go
to the Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the eLibrary link of Commission’s Web
site at https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket numbers
(Project Nos. 2808–011, 2809–026,
3562–020, 4202–020, 11132–025,
11472–057, 11482–027, and 11566–017)
in the docket number field to access the
document. For assistance, call toll-free
1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–20368 Filed 8–24–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP09–454–000]
BCR Holdings, Inc.; Notice of
Application
pwalker on DSK8KYBLC1PROD with NOTICES
August 18, 2009.
Take notice that on August 13, 2009,
BCR Holdings, Inc. (BCR), 820 Gessner,
Suite 1680, Houston, TX 77024, filed a
petition in Docket No. CP09–454–000
for Exemption of Temporary Acts and
Operations from Certificate
Requirements, pursuant to Rule
207(a)(5) of the Commission’s Rules of
Practice and Procedure, and section
7(c)(1)(B) of the Natural Gas Act,
seeking approval of an exemption from
certificate requirements to perform
temporary activities in order to drill two
test wells and perform other activities to
assess the feasibility of developing an
underground natural gas storage facility
in Lafourche Parish, Louisiana, all as
more fully set forth in the application
which is on file with the Commission
and open to public inspection. The
filing may also be viewed on the Web
at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
VerDate Nov<24>2008
22:52 Aug 24, 2009
Jkt 217001
number excluding the last three digits in
the docket number field to access the
document. For assistance, call (202)
502–3676 or TYY, (202) 502–8659.
Any questions regarding this
application should be directed to
Thomas W. Cook, 805 E. Union St.,
Broken Arrow, Oklahoma 74011, and
phone: (918) 524–8503 or facsimile:
(966) 628–7999.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
file with the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426, a motion to
intervene in accordance with the
requirements of the Commission’s Rules
of Practice and Procedure (18 CFR
385.214 or 385.211) and the Regulations
under the NGA (18 CFR 157.10). A
person obtaining party status will
receive copies of all documents filed by
the applicant and by all other parties. A
party must submit 14 copies of filings
made in the proceeding with the
Commission and must mail a copy to
the applicant and to every other party.
Only parties to the proceeding can ask
for court review of Commission orders
in the proceeding.
Persons who wish to comment only
on the environmental review of this
project, or in support of or in opposition
to this project, should submit an
original and two copies of their
comments to the Secretary of the
Commission. Environmental
commenters will be placed on the
Commission’s environmental mailing
list, will receive copies of the
environmental documents, and will be
notified of meetings associated with the
Commission’s environmental review
process. Environmental commenters
will not be required to serve copies of
filed documents on all other parties.
The Commission’s rules require that
persons filing comments in opposition
to the project provide copies of their
protests only to the applicant. However,
the non-party commenters will not
receive copies of all documents filed by
other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the Internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
PO 00000
Frm 00044
Fmt 4703
Sfmt 4703
42885
Comment Date: 5 p.m. Eastern Time
on September 8, 2009.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–20371 Filed 8–24–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2157–188]
Public Utility District No. 1 of
Snohomish County; Notice of
Application Accepted for Filing,
Soliciting Motions To Intervene and
Protests, Ready for Environmental
Analysis, and Soliciting Comments,
Recommendations, Preliminary Terms
and Conditions, and Preliminary
Fishway Prescriptions
August 18, 2009.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: P–2157–188.
c. Date Filed: June 1, 2009.
d. Applicant: Public Utility District
No. 1 of Snohomish County.
e. Name of Project: Henry M Jackson
Hydroelectric Project.
f. Location: The existing project is
located on the Sultan River in
Snohomish County, Washington, about
20 miles east of Everett, Washington.
The project penstock underlies 10.9
acres of Mount Baker-Snoqualmie
National Forest.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Public Utility
District No. 1 of Snohomish County
(District), Steven J. Klein, General
Manager, 2320 California Street, P.O.
Box 1107, Everett, WA 98206–1107.
i. FERC Contact: David Turner (202)
502–6091 or via e-mail at
david.turner@ferc.gov.
j. The deadline for filing motions to
intervene and protests, comments,
recommendations, preliminary terms
and conditions, and preliminary
fishway prescriptions is October 19,
2009; reply comments are due December
1, 2009.
All documents (original and eight
copies) should be filed with: Kimberly
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
The Commission’s Rules of Practice
require all intervenors filing documents
E:\FR\FM\25AUN1.SGM
25AUN1
Agencies
[Federal Register Volume 74, Number 163 (Tuesday, August 25, 2009)]
[Notices]
[Pages 42884-42885]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-20368]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project Nos. 2808-011; 2809-026; 3562-020; 4202-020; 11132-025; 11472-
057; 11482-027; 11566-017]
Ridgewood Maine Hydro Partners, L.P.; KEI (Maine) Power
Management (I) LLC; KEI (Maine) Power Management (II) LLC; KEI (Maine)
Power Management (III) LLC; KEI (Maine) Power Management (IV) LLC;
Notice of Application for Transfer of Licenses, and Soliciting Comments
and Motions To Intervene
August 18, 2009.
On July 30, 2009, Ridgewood Maine Hydro Partners, L.P. (Transferor)
and KEI (Maine) Power Management (I) LLC, KEI (Maine) Power Management
(II) LLC, KEI (Maine) Power Management (III) LLC, and KEI (Maine) Power
Management (IV) LLC, all wholly owned subsidiaries of KEI (USA) Power
Management Inc. (Transferees) filed an application for transfer of
licenses for the:
Lower Barker Mill Project located on the Little Androscoggin River
in Androscoggin County; American Tissue Dam Project located on the
Cobbosseecontee Stream, in Kennebec County; Upper Barker Mill Project
located on the Little Androscoggin River in Androscoggin County; Lowell
Tannery Project located on the Passadumkeag River, Penobscot County;
Eustis Project located on the North Branch of the Dead River, Franklin
County; Burnham Project located on the Sebasticook River, Somerset and
Waldo Counties; Marcal Project located on the Little Androscoggin River
in Androscoggin County; and Damariscotta Project located on the
Damariscotta River, Lincoln County. These projects are located in the
state of Maine.
Applicants seek Commission approval to transfer the licenses for
the Lower Barker Mill, American Tissue Dam, Upper Barker Mill, Lowell
Tannery, Eustis, Burnham, Marcal, and Damariscotta Projects from the
Transferor to the Transferees.
Applicant Contact: Transferor: Ms. Maria Haggerty, Ridgewood Maine
Hydro Partners, L.P., c/o Ridgewood Power Corporation, 977 Linwood
Avenue, Ridgewood, NJ 07450, phone (201) 447-9000. Transferee: KEI
(USA) Power Management, Inc., Mr. Guy Paquette, Kruger Energy, Inc.,
3285 Bedford Road, Montreal, Quebec H3S 1 5, phone (514) 343-3247.
FERC Contact: Patricia W. Gillis, (202) 502-8735.
[[Page 42885]]
Deadline for filing comments and motions to intervene: 15 days from
the issuance of this notice. Comments and motions to intervene may be
filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii)(2008) and the instructions on the Commission's Web
site under the ``e-Filing'' link. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and eight
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For
more information on how to submit these types of filings please go to
the Commission's Web site located at https://www.ferc.gov/filing-comments.asp. More information about this project can be viewed or
printed on the eLibrary link of Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket numbers
(Project Nos. 2808-011, 2809-026, 3562-020, 4202-020, 11132-025, 11472-
057, 11482-027, and 11566-017) in the docket number field to access the
document. For assistance, call toll-free 1-866-208-3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-20368 Filed 8-24-09; 8:45 am]
BILLING CODE 6717-01-P