D. Stephen Sorensen; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions to Intervene, and Competing Applications, 42884 [E9-20366]
Download as PDF
42884
Federal Register / Vol. 74, No. 163 / Tuesday, August 25, 2009 / Notices
this special forum by visiting the EAC
Board of Advisors virtual meeting room
at https://www.eac.gov at any time
between Wednesday, September 9,
2009, 9 a.m. EDT and Friday, September
18, 2009, 9 p.m. EDT. The public also
may view the five draft chapters of the
Election Management Guidelines
Alternative, which will be posted on
EAC’s Web site beginning September 9,
2009. The public may file written
statements to the EAC Board of Advisors
at boardofadvisors@eac.gov. Data on
EAC’s Web site is accessible to visitors
with disabilities and meets the
requirements of section 508 of the
Rehabilitation Act.
PERSON TO CONTACT FOR INFORMATION:
Bryan Whitener, Telephone: (202) 566–
3100.
Alice Miller,
Chief Operating Officer, U.S. Election
Assistance Commission.
[FR Doc. E9–20567 Filed 8–21–09; 4:15 pm]
BILLING CODE 6820–KF–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13433–000]
D. Stephen Sorensen; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions to Intervene, and
Competing Applications
pwalker on DSK8KYBLC1PROD with NOTICES
August 14, 2009.
On April 16, 2009, D. Stephen
Sorenson filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act, proposing
to study the feasibility of the Piute Dam
Hydro Project located on the Sevier
River in Piute County, Utah. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following:
(1) An existing 1,403-foot-long, 80foot-high earthen Dam; (2) an existing
reservoir having a surface area of 3,360
acres and a storage capacity of 74,000
acre-feet and normal water surface
elevation of 5,990 feet mean sea level;
(3) a proposed penstock 4 feet wide and
560 feet long; (4) a proposed
powerhouse containing a 1,543-kilowatt
turbine generator; (5) a tailrace; (6) a
VerDate Nov<24>2008
22:52 Aug 24, 2009
Jkt 217001
proposed 2,300-foot-long overhead
transmission line; and (7) appurtenant
facilities. The proposed Piute Dam
Hydro Project would have an average
annual generation of 4.15 gigawatthours.
Applicant Contact: Robert W. Worley,
Sunrise Engineering, Inc., 25 East 500
North, Filmore, UT 64631, phone: (435)
743–6151.
FERC Contact: Joseph P. Hassell, 202–
502–8079.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at https://
www.ferc.gov/filing-comments.asp.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–13433) in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–20366 Filed 8–24–09; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project Nos. 2808–011; 2809–026; 3562–
020; 4202–020; 11132–025; 11472–057;
11482–027; 11566–017]
Ridgewood Maine Hydro Partners,
L.P.; KEI (Maine) Power Management
(I) LLC; KEI (Maine) Power
Management (II) LLC; KEI (Maine)
Power Management (III) LLC; KEI
(Maine) Power Management (IV) LLC;
Notice of Application for Transfer of
Licenses, and Soliciting Comments
and Motions To Intervene
August 18, 2009.
On July 30, 2009, Ridgewood Maine
Hydro Partners, L.P. (Transferor) and
KEI (Maine) Power Management (I) LLC,
KEI (Maine) Power Management (II)
LLC, KEI (Maine) Power Management
(III) LLC, and KEI (Maine) Power
Management (IV) LLC, all wholly owned
subsidiaries of KEI (USA) Power
Management Inc. (Transferees) filed an
application for transfer of licenses for
the:
Lower Barker Mill Project located on
the Little Androscoggin River in
Androscoggin County; American Tissue
Dam Project located on the
Cobbosseecontee Stream, in Kennebec
County; Upper Barker Mill Project
located on the Little Androscoggin River
in Androscoggin County; Lowell
Tannery Project located on the
Passadumkeag River, Penobscot County;
Eustis Project located on the North
Branch of the Dead River, Franklin
County; Burnham Project located on the
Sebasticook River, Somerset and Waldo
Counties; Marcal Project located on the
Little Androscoggin River in
Androscoggin County; and Damariscotta
Project located on the Damariscotta
River, Lincoln County. These projects
are located in the state of Maine.
Applicants seek Commission approval
to transfer the licenses for the Lower
Barker Mill, American Tissue Dam,
Upper Barker Mill, Lowell Tannery,
Eustis, Burnham, Marcal, and
Damariscotta Projects from the
Transferor to the Transferees.
Applicant Contact: Transferor: Ms.
Maria Haggerty, Ridgewood Maine
Hydro Partners, L.P., c/o Ridgewood
Power Corporation, 977 Linwood
Avenue, Ridgewood, NJ 07450, phone
(201) 447–9000. Transferee: KEI (USA)
Power Management, Inc., Mr. Guy
Paquette, Kruger Energy, Inc., 3285
Bedford Road, Montreal, Quebec H3S 1
5, phone (514) 343–3247.
FERC Contact: Patricia W. Gillis, (202)
502–8735.
E:\FR\FM\25AUN1.SGM
25AUN1
Agencies
[Federal Register Volume 74, Number 163 (Tuesday, August 25, 2009)]
[Notices]
[Page 42884]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-20366]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13433-000]
D. Stephen Sorensen; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions to Intervene, and
Competing Applications
August 14, 2009.
On April 16, 2009, D. Stephen Sorenson filed an application for a
preliminary permit, pursuant to section 4(f) of the Federal Power Act,
proposing to study the feasibility of the Piute Dam Hydro Project
located on the Sevier River in Piute County, Utah. The sole purpose of
a preliminary permit, if issued, is to grant the permit holder priority
to file a license application during the permit term. A preliminary
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by
others without the owners' express permission.
The proposed project would consist of the following:
(1) An existing 1,403-foot-long, 80-foot-high earthen Dam; (2) an
existing reservoir having a surface area of 3,360 acres and a storage
capacity of 74,000 acre-feet and normal water surface elevation of
5,990 feet mean sea level; (3) a proposed penstock 4 feet wide and 560
feet long; (4) a proposed powerhouse containing a 1,543-kilowatt
turbine generator; (5) a tailrace; (6) a proposed 2,300-foot-long
overhead transmission line; and (7) appurtenant facilities. The
proposed Piute Dam Hydro Project would have an average annual
generation of 4.15 gigawatt-hours.
Applicant Contact: Robert W. Worley, Sunrise Engineering, Inc., 25
East 500 North, Filmore, UT 64631, phone: (435) 743-6151.
FERC Contact: Joseph P. Hassell, 202-502-8079.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Comments, motions to intervene, notices of intent, and competing
applications may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and eight
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For
more information on how to submit these types of filings please go to
the Commission's Web site located at https://www.ferc.gov/filing-comments.asp. More information about this project, including a copy of
the application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-13433) in the docket number field to access
the document. For assistance, call toll-free 1-866-208-3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-20366 Filed 8-24-09; 8:45 am]