Tieton Hydropower, LLC; Southern California Public Power Authority; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene, 42663 [E9-20238]

Download as PDF Federal Register / Vol. 74, No. 162 / Monday, August 24, 2009 / Notices Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https:// www.ferc.gov/filing-comments.asp. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of the Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–13548) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3372. Kimberly D. Bose, Secretary. [FR Doc. E9–20227 Filed 8–21–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13547–000] Free Flow Power Ohio River 10, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications erowe on DSK5CLS3C1PROD with NOTICES August 14, 2009. On July 14, 2009, Free Flow Power Ohio River 10, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Lake Mongoulois Hydrokinetic Energy Project, located on the Atchafalaya River, Saint Martin Parish, Louisiana. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. VerDate Nov<24>2008 15:04 Aug 21, 2009 Jkt 217001 42663 The proposed project would consist of: (1) 1,120 turbine-generator units configured in a series of turbine arrays which in turn will be grouped to form turbine fields; (2) a combination of freestanding pilings, a floating bargelike platform, or existing shore infrastructure such as dock pilings onto which the turbine arrays will be moored; (3) submersible electric cables interconnecting the arrays within each turbine field and transmit the turbine field’s generation to a shore station; (4) several shore stations each consisting of less than 100 square meters which will transition the submersible cabling to the overhead transmission; (5) a 4.6 mile, 69 kV line interconnecting the shore stations and delivering power to the project substation; and (6) appurtenant facilities. The proposed project would generate about 98 gigawatt-hours annually. Applicant contact: Ramya Swaminathan, Free Flow Power Corporation, 33 Commercial Street, Gloucester, Massachusetts 01930, phone: (978) 226–1531. FERC Contact: Sergiu Serban, 202– 502–6211. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https:// www.ferc.gov/filing-comments.asp. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–13547) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3372. DEPARTMENT OF ENERGY Kimberly D. Bose, Secretary. [FR Doc. E9–20226 Filed 8–21–09; 8:45 am] Kimberly D. Bose, Secretary. [FR Doc. E9–20238 Filed 8–21–09; 8:45 am] BILLING CODE 6717–01–P BILLING CODE 6717–01–P PO 00000 Frm 00020 Fmt 4703 Sfmt 4703 Federal Energy Regulatory Commission [Project No. 3701–091] Tieton Hydropower, LLC; Southern California Public Power Authority; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene August 14, 2009. On August 7, 2009, Tieton Hydropower, LLC (transferor) and Southern California Public Power Authority (transferee) filed an application for transfer of license of the Tieton Dam Project, located on the Tieton River in Yakima County, Washington. Applicants seek Commission approval to transfer the license for the Tieton Dam from the transferors to the transferees. Applicant Contact: Transferor: Mr. Chad Ross, Tieton Hydropower, LLC, 925 Fairgrounds Road, Goldendale, WA 98620, Phone (509) 773–5650. Transferee: Mr. Richard M. Helgeson, Southern California Public Power Authority, 225 South Lake Avenue, Suite 1410, Pasadena, CA 91101, phone (626) 793–9364. FERC Contact: Robert Bell, (202) 502– 6062. Deadline for filing comments and motions to intervene: 30 days from the issuance of this notice. Comments and motions to intervene may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii)(2008) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paper-filed. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https://www.ferc.gov/filingcomments.asp. More information about this project can be viewed or printed on the eLibrary link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–3701–091) in the docket number field to access the document. For assistance, call toll-free 1–866–208– 3372. E:\FR\FM\24AUN1.SGM 24AUN1

Agencies

[Federal Register Volume 74, Number 162 (Monday, August 24, 2009)]
[Notices]
[Page 42663]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-20238]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 3701-091]


Tieton Hydropower, LLC; Southern California Public Power 
Authority; Notice of Application for Transfer of License, and 
Soliciting Comments and Motions To Intervene

August 14, 2009.
    On August 7, 2009, Tieton Hydropower, LLC (transferor) and Southern 
California Public Power Authority (transferee) filed an application for 
transfer of license of the Tieton Dam Project, located on the Tieton 
River in Yakima County, Washington.
    Applicants seek Commission approval to transfer the license for the 
Tieton Dam from the transferors to the transferees.
    Applicant Contact: Transferor: Mr. Chad Ross, Tieton Hydropower, 
LLC, 925 Fairgrounds Road, Goldendale, WA 98620, Phone (509) 773-5650. 
Transferee: Mr. Richard M. Helgeson, Southern California Public Power 
Authority, 225 South Lake Avenue, Suite 1410, Pasadena, CA 91101, phone 
(626) 793-9364.
    FERC Contact: Robert Bell, (202) 502-6062.
    Deadline for filing comments and motions to intervene: 30 days from 
the issuance of this notice. Comments and motions to intervene may be 
filed electronically via the Internet. See 18 CFR 
385.2001(a)(1)(iii)(2008) and the instructions on the Commission's Web 
site under the ``e-Filing'' link. If unable to be filed electronically, 
documents may be paper-filed. To paper-file, an original and eight 
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For 
more information on how to submit these types of filings please go to 
the Commission's Web site located at https://www.ferc.gov/filing-comments.asp. More information about this project can be viewed or 
printed on the eLibrary link of Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-3701-
091) in the docket number field to access the document. For assistance, 
call toll-free 1-866-208-3372.

Kimberly D. Bose,
Secretary.
 [FR Doc. E9-20238 Filed 8-21-09; 8:45 am]
BILLING CODE 6717-01-P