Free Flow Power Ohio River 13, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 42661-42662 [E9-20229]

Download as PDF Federal Register / Vol. 74, No. 162 / Monday, August 24, 2009 / Notices FERC Contact: Sergiu Serban, 202– 502–6211. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https://www.ferc.gov/filingcomments.asp. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P13552) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3372. Kimberly D. Bose, Secretary. [FR Doc. E9–20231 Filed 8–21–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13551–000] Free Flow Power Ohio River 14, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications erowe on DSK5CLS3C1PROD with NOTICES August 14, 2009. On July 14, 2009, Free Flow Power Ohio River 14, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Myette Point Hydrokinetic Energy Project, located on the Atchafalaya River, Saint Martin and Saint Mary Parishes, Louisiana. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land disturbing activities or VerDate Nov<24>2008 15:04 Aug 21, 2009 Jkt 217001 otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of: (1) 720 turbine-generator units configured in a series of turbine arrays which in turn will be grouped to form turbine fields; (2) a combination of freestanding pilings, a floating bargelike platform, or existing shore infrastructure such as dock pilings onto which the turbine arrays will be moored; (3) submersible electric cables interconnecting the arrays within each turbine field and transmit the turbine field’s generation to a shore station; (4) several shore stations each consisting of less than 100 square meters which will transition the submersible cabling to the overhead transmission; (5) a 2.6 mile, 69 kV line interconnecting the shore stations and delivering power to the project substation; and (6) appurtenant facilities. The proposed project would generate about 63 gigawatt-hours annually. Applicant contact: Ramya Swaminathan, Free Flow Power Corporation, 33 Commercial Street, Gloucester, Massachusetts 01930, phone: (978) 226–1531. FERC Contact: Sergiu Serban, 202– 502–6211. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https://www.ferc.gov/filingcomments.asp. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–13551) in the docket number field to PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 42661 access the document. For assistance, call toll-free 1–866–208–3372. Kimberly D. Bose, Secretary. [FR Doc. E9–20230 Filed 8–21–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13550–000] Free Flow Power Ohio River 13, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications August 14, 2009. On July 14, 2009, Free Flow Power Ohio River 13, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Turkey Island Hydrokinetic Energy Project, located on the Atchafalaya River, Saint Martin and Iberia Parishes, Louisiana. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of: (1) 1,140 turbine-generator units configured in a series of turbine arrays which in turn will be grouped to form turbine fields; (2) a combination of freestanding pilings, a floating bargelike platform, or existing shore infrastructure such as dock pilings onto which the turbine arrays will be moored; (3) submersible electric cables interconnecting the arrays within each turbine field and transmit the turbine field’s generation to a shore station; (4) several shore stations each consisting of less than 100 square meters which will transition the submersible cabling to the overhead transmission; (5) a 4.7 mile, 69 kV line interconnecting the shore stations and delivering power to the project substation; and (6) appurtenant facilities. The proposed project would generate about 100 gigawatt-hours annually. Applicant Contact: Ramya Swaminathan, Free Flow Power Corporation, 33 Commercial Street, Gloucester, Massachusetts 01930, phone: (978) 226–1531. E:\FR\FM\24AUN1.SGM 24AUN1 42662 Federal Register / Vol. 74, No. 162 / Monday, August 24, 2009 / Notices FERC Contact: Sergiu Serban, 202– 502–6211. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https://www.ferc.gov/filingcomments.asp. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–13550) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3372. Kimberly D. Bose, Secretary. [FR Doc. E9–20229 Filed 8–21–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13549–000] Free Flow Power Ohio River 12, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications erowe on DSK5CLS3C1PROD with NOTICES August 14, 2009. On July 14, 2009, Free Flow Power Ohio River 12, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Lake Chicot Hydrokinetic Energy Project, located on the Atchafalaya River, Saint Martin and Iberia Parishes, Louisiana. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land disturbing activities or VerDate Nov<24>2008 15:04 Aug 21, 2009 Jkt 217001 otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of: (1) 440 turbine-generator units configured in a series of turbine arrays which in turn will be grouped to form turbine fields; (2) a combination of freestanding pilings, a floating bargelike platform, or existing shore infrastructure such as dock pilings onto which the turbine arrays will be moored; (3) submersible electric cables interconnecting the arrays within each turbine field and transmit the turbine field’s generation to a shore station; (4) several shore stations each consisting of less than 100 square meters which will transition the submersible cabling to the overhead transmission; (5) a 1.2 mile, 69 kV line interconnecting the shore stations and delivering power to the project substation; and (6) appurtenant facilities. The proposed project would generate about 39 gigawatt-hours annually. Applicant contact: Ramya Swaminathan, Free Flow Power Corporation, 33 Commercial Street, Gloucester, Massachusetts 01930, phone: (978) 226–1531. FERC Contact: Sergiu Serban, 202– 502–6211. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https://www.ferc.gov/filingcomments.asp. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–13549) in the docket number field to PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 access the document. For assistance, call toll-free 1–866–208–3372. Kimberly D. Bose, Secretary. [FR Doc. E9–20228 Filed 8–21–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13548–000] Free Flow Power Ohio River 11, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications August 14, 2009. On July 14, 2009, Free Flow Power Ohio River 11, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Deadman Cove Hydrokinetic Energy Project, located on the Atchafalaya River, Saint Martin Parish, Louisiana. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed project would consist of: (1) 820 turbine-generator units configured in a series of turbine arrays which in turn will be grouped to form turbine fields; (2) a combination of freestanding pilings, a floating bargelike platform, or existing shore infrastructure such as dock pilings onto which the turbine arrays will be moored; (3) submersible electric cables interconnecting the arrays within each turbine field and transmit the turbine field’s generation to a shore station; (4) several shore stations each consisting of less than 100 square meters which will transition the submersible cabling to the overhead transmission; (5) a 3.4 mile, 69 kV line interconnecting the shore stations and delivering power to the project substation; and (6) appurtenant facilities. The proposed project would generate about 77 gigawatt-hours annually. Applicant Contact: Ramya Swaminathan, Free Flow Power Corporation, 33 Commercial Street, Gloucester, Massachusetts 01930, phone: (978) 226–1531. FERC Contact: Sergiu Serban, 202– 502–6211. E:\FR\FM\24AUN1.SGM 24AUN1

Agencies

[Federal Register Volume 74, Number 162 (Monday, August 24, 2009)]
[Notices]
[Pages 42661-42662]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-20229]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13550-000]


Free Flow Power Ohio River 13, LLC; Notice of Preliminary Permit 
Application Accepted for Filing and Soliciting Comments, Motions To 
Intervene, and Competing Applications

August 14, 2009.

    On July 14, 2009, Free Flow Power Ohio River 13, LLC filed an 
application for a preliminary permit, pursuant to section 4(f) of the 
Federal Power Act, proposing to study the feasibility of the Turkey 
Island Hydrokinetic Energy Project, located on the Atchafalaya River, 
Saint Martin and Iberia Parishes, Louisiana. The sole purpose of a 
preliminary permit, if issued, is to grant the permit holder priority 
to file a license application during the permit term. A preliminary 
permit does not authorize the permit holder to perform any land 
disturbing activities or otherwise enter upon lands or waters owned by 
others without the owners' express permission.
    The proposed project would consist of: (1) 1,140 turbine-generator 
units configured in a series of turbine arrays which in turn will be 
grouped to form turbine fields; (2) a combination of freestanding 
pilings, a floating barge-like platform, or existing shore 
infrastructure such as dock pilings onto which the turbine arrays will 
be moored; (3) submersible electric cables interconnecting the arrays 
within each turbine field and transmit the turbine field's generation 
to a shore station; (4) several shore stations each consisting of less 
than 100 square meters which will transition the submersible cabling to 
the overhead transmission; (5) a 4.7 mile, 69 kV line interconnecting 
the shore stations and delivering power to the project substation; and 
(6) appurtenant facilities. The proposed project would generate about 
100 gigawatt-hours annually.
    Applicant Contact: Ramya Swaminathan, Free Flow Power Corporation, 
33 Commercial Street, Gloucester, Massachusetts 01930, phone: (978) 
226-1531.

[[Page 42662]]

    FERC Contact: Sergiu Serban, 202-502-6211.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Comments, motions to intervene, notices of intent, and competing 
applications may be filed electronically via the Internet. See 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
under the ``e-Filing'' link. If unable to be filed electronically, 
documents may be paper-filed. To paper-file, an original and eight 
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For 
more information on how to submit these types of filings please go to 
the Commission's Web site located at https://www.ferc.gov/filing-comments.asp. More information about this project, including a copy of 
the application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-13550) in the docket number field to access 
the document. For assistance, call toll-free 1-866-208-3372.

Kimberly D. Bose,
Secretary.
[FR Doc. E9-20229 Filed 8-21-09; 8:45 am]