Free Flow Power Ohio River 11, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 42662-42663 [E9-20227]
Download as PDF
42662
Federal Register / Vol. 74, No. 162 / Monday, August 24, 2009 / Notices
FERC Contact: Sergiu Serban, 202–
502–6211.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project, including a copy of the
application, can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13550) in the docket number field to
access the document. For assistance,
call toll-free 1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–20229 Filed 8–21–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13549–000]
Free Flow Power Ohio River 12, LLC;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
erowe on DSK5CLS3C1PROD with NOTICES
August 14, 2009.
On July 14, 2009, Free Flow Power
Ohio River 12, LLC filed an application
for a preliminary permit, pursuant to
section 4(f) of the Federal Power Act,
proposing to study the feasibility of the
Lake Chicot Hydrokinetic Energy
Project, located on the Atchafalaya
River, Saint Martin and Iberia Parishes,
Louisiana. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land disturbing activities or
VerDate Nov<24>2008
15:04 Aug 21, 2009
Jkt 217001
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist
of: (1) 440 turbine-generator units
configured in a series of turbine arrays
which in turn will be grouped to form
turbine fields; (2) a combination of
freestanding pilings, a floating bargelike platform, or existing shore
infrastructure such as dock pilings onto
which the turbine arrays will be
moored; (3) submersible electric cables
interconnecting the arrays within each
turbine field and transmit the turbine
field’s generation to a shore station; (4)
several shore stations each consisting of
less than 100 square meters which will
transition the submersible cabling to the
overhead transmission; (5) a 1.2 mile, 69
kV line interconnecting the shore
stations and delivering power to the
project substation; and (6) appurtenant
facilities. The proposed project would
generate about 39 gigawatt-hours
annually.
Applicant contact: Ramya
Swaminathan, Free Flow Power
Corporation, 33 Commercial Street,
Gloucester, Massachusetts 01930,
phone: (978) 226–1531.
FERC Contact: Sergiu Serban, 202–
502–6211.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project, including a copy of the
application, can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13549) in the docket number field to
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
access the document. For assistance,
call toll-free 1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–20228 Filed 8–21–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13548–000]
Free Flow Power Ohio River 11, LLC;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
August 14, 2009.
On July 14, 2009, Free Flow Power
Ohio River 11, LLC filed an application
for a preliminary permit, pursuant to
section 4(f) of the Federal Power Act,
proposing to study the feasibility of the
Deadman Cove Hydrokinetic Energy
Project, located on the Atchafalaya
River, Saint Martin Parish, Louisiana.
The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any land
disturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed project would consist
of: (1) 820 turbine-generator units
configured in a series of turbine arrays
which in turn will be grouped to form
turbine fields; (2) a combination of
freestanding pilings, a floating bargelike platform, or existing shore
infrastructure such as dock pilings onto
which the turbine arrays will be
moored; (3) submersible electric cables
interconnecting the arrays within each
turbine field and transmit the turbine
field’s generation to a shore station; (4)
several shore stations each consisting of
less than 100 square meters which will
transition the submersible cabling to the
overhead transmission; (5) a 3.4 mile, 69
kV line interconnecting the shore
stations and delivering power to the
project substation; and (6) appurtenant
facilities. The proposed project would
generate about 77 gigawatt-hours
annually.
Applicant Contact: Ramya
Swaminathan, Free Flow Power
Corporation, 33 Commercial Street,
Gloucester, Massachusetts 01930,
phone: (978) 226–1531.
FERC Contact: Sergiu Serban, 202–
502–6211.
E:\FR\FM\24AUN1.SGM
24AUN1
Federal Register / Vol. 74, No. 162 / Monday, August 24, 2009 / Notices
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at https://
www.ferc.gov/filing-comments.asp.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of the Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13548) in the docket number field to
access the document. For assistance,
call toll-free 1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–20227 Filed 8–21–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13547–000]
Free Flow Power Ohio River 10, LLC;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
erowe on DSK5CLS3C1PROD with NOTICES
August 14, 2009.
On July 14, 2009, Free Flow Power
Ohio River 10, LLC filed an application
for a preliminary permit, pursuant to
section 4(f) of the Federal Power Act,
proposing to study the feasibility of the
Lake Mongoulois Hydrokinetic Energy
Project, located on the Atchafalaya
River, Saint Martin Parish, Louisiana.
The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any land
disturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
VerDate Nov<24>2008
15:04 Aug 21, 2009
Jkt 217001
42663
The proposed project would consist
of: (1) 1,120 turbine-generator units
configured in a series of turbine arrays
which in turn will be grouped to form
turbine fields; (2) a combination of
freestanding pilings, a floating bargelike platform, or existing shore
infrastructure such as dock pilings onto
which the turbine arrays will be
moored; (3) submersible electric cables
interconnecting the arrays within each
turbine field and transmit the turbine
field’s generation to a shore station; (4)
several shore stations each consisting of
less than 100 square meters which will
transition the submersible cabling to the
overhead transmission; (5) a 4.6 mile, 69
kV line interconnecting the shore
stations and delivering power to the
project substation; and (6) appurtenant
facilities. The proposed project would
generate about 98 gigawatt-hours
annually.
Applicant contact: Ramya
Swaminathan, Free Flow Power
Corporation, 33 Commercial Street,
Gloucester, Massachusetts 01930,
phone: (978) 226–1531.
FERC Contact: Sergiu Serban, 202–
502–6211.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at https://
www.ferc.gov/filing-comments.asp.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13547) in the docket number field to
access the document. For assistance,
call toll-free 1–866–208–3372.
DEPARTMENT OF ENERGY
Kimberly D. Bose,
Secretary.
[FR Doc. E9–20226 Filed 8–21–09; 8:45 am]
Kimberly D. Bose,
Secretary.
[FR Doc. E9–20238 Filed 8–21–09; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
Federal Energy Regulatory
Commission
[Project No. 3701–091]
Tieton Hydropower, LLC; Southern
California Public Power Authority;
Notice of Application for Transfer of
License, and Soliciting Comments and
Motions To Intervene
August 14, 2009.
On August 7, 2009, Tieton
Hydropower, LLC (transferor) and
Southern California Public Power
Authority (transferee) filed an
application for transfer of license of the
Tieton Dam Project, located on the
Tieton River in Yakima County,
Washington.
Applicants seek Commission approval
to transfer the license for the Tieton
Dam from the transferors to the
transferees.
Applicant Contact: Transferor: Mr.
Chad Ross, Tieton Hydropower, LLC,
925 Fairgrounds Road, Goldendale, WA
98620, Phone (509) 773–5650.
Transferee: Mr. Richard M. Helgeson,
Southern California Public Power
Authority, 225 South Lake Avenue,
Suite 1410, Pasadena, CA 91101, phone
(626) 793–9364.
FERC Contact: Robert Bell, (202) 502–
6062.
Deadline for filing comments and
motions to intervene: 30 days from the
issuance of this notice. Comments and
motions to intervene may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii)(2008) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. If unable
to be filed electronically, documents
may be paper-filed. To paper-file, an
original and eight copies should be
mailed to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426. For more information on how to
submit these types of filings please go
to the Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the eLibrary link of Commission’s Web
site at https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–3701–091) in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3372.
E:\FR\FM\24AUN1.SGM
24AUN1
Agencies
[Federal Register Volume 74, Number 162 (Monday, August 24, 2009)]
[Notices]
[Pages 42662-42663]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-20227]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13548-000]
Free Flow Power Ohio River 11, LLC; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
August 14, 2009.
On July 14, 2009, Free Flow Power Ohio River 11, LLC filed an
application for a preliminary permit, pursuant to section 4(f) of the
Federal Power Act, proposing to study the feasibility of the Deadman
Cove Hydrokinetic Energy Project, located on the Atchafalaya River,
Saint Martin Parish, Louisiana. The sole purpose of a preliminary
permit, if issued, is to grant the permit holder priority to file a
license application during the permit term. A preliminary permit does
not authorize the permit holder to perform any land disturbing
activities or otherwise enter upon lands or waters owned by others
without the owners' express permission.
The proposed project would consist of: (1) 820 turbine-generator
units configured in a series of turbine arrays which in turn will be
grouped to form turbine fields; (2) a combination of freestanding
pilings, a floating barge-like platform, or existing shore
infrastructure such as dock pilings onto which the turbine arrays will
be moored; (3) submersible electric cables interconnecting the arrays
within each turbine field and transmit the turbine field's generation
to a shore station; (4) several shore stations each consisting of less
than 100 square meters which will transition the submersible cabling to
the overhead transmission; (5) a 3.4 mile, 69 kV line interconnecting
the shore stations and delivering power to the project substation; and
(6) appurtenant facilities. The proposed project would generate about
77 gigawatt-hours annually.
Applicant Contact: Ramya Swaminathan, Free Flow Power Corporation,
33 Commercial Street, Gloucester, Massachusetts 01930, phone: (978)
226-1531.
FERC Contact: Sergiu Serban, 202-502-6211.
[[Page 42663]]
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Comments, motions to intervene, notices of intent, and competing
applications may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and eight
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For
more information on how to submit these types of filings please go to
the Commission's Web site located at https://www.ferc.gov/filing-comments.asp. More information about this project, including a copy of
the application, can be viewed or printed on the ``eLibrary'' link of
the Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-13548) in the docket number
field to access the document. For assistance, call toll-free 1-866-208-
3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-20227 Filed 8-21-09; 8:45 am]
BILLING CODE 6717-01-P