Free Flow Power Ohio River 4, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 42666-42667 [E9-20220]
Download as PDF
erowe on DSK5CLS3C1PROD with NOTICES
42666
Federal Register / Vol. 74, No. 162 / Monday, August 24, 2009 / Notices
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist
of: (1) 1,860 turbine-generator units
configured in a series of turbine arrays
which in turn will be grouped to form
turbine fields; (2) a combination of
freestanding pilings, a floating bargelike platform, or existing shore
infrastructure such as dock pilings onto
which the turbine arrays will be
moored; (3) submersible electric cables
interconnecting the arrays within each
turbine field and transmit the turbine
field’s generation to a shore station; (4)
several shore stations each consisting of
less than 100 square meters which will
transition the submersible cabling to the
overhead transmission; (5) a 8.3 mile, 69
kV line interconnecting the shore
stations and delivering power to the
project substation; and (6) appurtenant
facilities. The proposed project would
generate about 163 gigawatt-hours
annually.
Applicant contact: Ramya
Swaminathan, Free Flow Power
Corporation, 33 Commercial Street,
Gloucester, Massachusetts 01930,
phone: (978) 226–1531.
FERC Contact: Sergiu Serban, 202–
502–6211.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at https://
www.ferc.gov/filing-comments.asp.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–13545) in
the docket number field to access the
VerDate Nov<24>2008
15:04 Aug 21, 2009
Jkt 217001
document. For assistance, call toll-free
1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–20224 Filed 8–21–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13543–000]
Free Flow Power Ohio River 6, LLC;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
August 14, 2009.
On July 14, 2009, Free Flow Power
Ohio River 6, LLC filed an application
for a preliminary permit, pursuant to
section 4(f) of the Federal Power Act,
proposing to study the feasibility of the
Krotz Springs Hydrokinetic Energy
Project, located on the Atchafalaya
River, Pointe Coupee, Saint Landry, and
Saint Martin Parishes, Louisiana. The
sole purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist
of: (1) 1,110 turbine-generator units
configured in a series of turbine arrays
which in turn will be grouped to form
turbine fields; (2) a combination of
freestanding pilings, a floating bargelike platform, or existing shore
infrastructure such as dock pilings onto
which the turbine arrays will be
moored; (3) submersible electric cables
interconnecting the arrays within each
turbine field and transmit the turbine
field’s generation to a shore station; (4)
several shore stations each consisting of
less than 100 square meters which will
transition the submersible cabling to the
overhead transmission; (5) a 4.5 mile, 69
kV line interconnecting the shore
stations and delivering power to the
project substation; and (6) appurtenant
facilities. The proposed project would
generate about 96 gigawatt-hours
annually.
Applicant contact: Ramya
Swaminathan, Free Flow Power
Corporation, 33 Commercial Street,
Gloucester, Massachusetts 01930,
phone: (978) 226–1531.
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
FERC Contact: Sergiu Serban, 202–
502–6211.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project, including a copy of the
application, can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13543) in the docket number field to
access the document. For assistance,
call toll-free 1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–20222 Filed 8–21–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13541–000]
Free Flow Power Ohio River 4, LLC;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
August 14, 2009.
On July 14, 2009, Free Flow Power
Ohio River 4, LLC filed an application
for a preliminary permit, pursuant to
section 4(f) of the Federal Power Act,
proposing to study the feasibility of the
Melville Crevasse Hydrokinetic Energy
Project, located on the Atchafalaya
River, Pointe Coupee and Saint Landry
Parishes, Louisiana. The sole purpose of
a preliminary permit, if issued, is to
grant the permit holder priority to file
a license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land disturbing activities or
E:\FR\FM\24AUN1.SGM
24AUN1
erowe on DSK5CLS3C1PROD with NOTICES
Federal Register / Vol. 74, No. 162 / Monday, August 24, 2009 / Notices
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist
of: (1) 1,720 turbine-generator units
configured in a series of turbine arrays
which in turn will be grouped to form
turbine fields; (2) a combination of
freestanding pilings, a floating bargelike platform, or existing shore
infrastructure such as dock pilings onto
which the turbine arrays will be
moored; (3) submersible electric cables
interconnecting the arrays within each
turbine field and transmit the turbine
field’s generation to a shore station; (4)
several shore stations each consisting of
less than 100 square meters which will
transition the submersible cabling to the
overhead transmission; (5) a 7.6 mile, 69
kV line interconnecting the shore
stations and delivering power to the
project substation; and (6) appurtenant
facilities. The proposed project would
generate about 150 gigawatt-hours
annually.
Applicant contact: Ramya
Swaminathan, Free Flow Power
Corporation, 33 Commercial Street,
Gloucester, Massachusetts 01930,
phone: (978) 226–1531.
FERC Contact: Sergiu Serban, 202–
502–6211.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project, including a copy of the
application, can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13541) in the docket number field to
VerDate Nov<24>2008
15:04 Aug 21, 2009
Jkt 217001
access the document. For assistance,
call toll-free 1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–20220 Filed 8–21–09; 8:45 am]
42667
Issued in Portland, Oregon, on August 13,
2009.
Stephen J. Wright,
Administrator and Chief Executive Officer.
[FR Doc. E9–20303 Filed 8–21–09; 8:45 am]
BILLING CODE 6450–01–P
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Bonneville Power Administration
Western Area Power Administration
Electrical Interconnection of the
Golden Hills Wind Project
AGENCY: Bonneville Power
Administration (BPA), Department of
Energy (DOE).
ACTION: Notice of availability of Record
of Decision (ROD).
Big Stone II Power Plant and
Transmission Project Final
Environmental Impact Statement (DOE/
EIS–0377)
AGENCY: Western Area Power
Administration, DOE.
ACTION: Record of Decision.
The Bonneville Power
Administration (BPA) has decided to
offer BP Alternative Energy North
America, Inc. a Large Generator
Interconnection Agreement for
interconnection of up to 200 megawatts
of power into the Federal Columbia
River Transmission System. The power
would be generated by the Golden Hills
Wind Project (Wind Project) in Sherman
County, Oregon. To interconnect the
Wind Project, BPA will string a jumper
line at an existing transmission tower
outside Klondike Schoolhouse
Substation and connect to BPA’s Biglow
Canyon—Klondike Schoolhouse No. 2
230-kilovolt line. BPA will also
purchase part of Portland General
Electric’s Biglow Canyon Substation, as
well as about 1 acre of land next to
Biglow Canyon Substation for the
expansion of the substation to
accommodate new equipment,
including a new transmission tower.
This new tower will then be connected
to an existing transmission tower
outside the substation fence. This
decision to interconnect the Wind
Project is consistent with and tiered to
BPA’s Business Plan Environmental
Impact Statement (DOE/EIS–0183, June
1995), and the Business Plan Record of
Decision (BP ROD, August 1995).
ADDRESSES: Copies of this tiered ROD
and the Business Plan EIS may be
obtained by calling BPA’s toll-free
document request line, 1–800–622–
4520. The RODs and EIS are also
available on our Web site, https://
www.efw.bpa.gov.
SUMMARY:
FOR FURTHER INFORMATION CONTACT:
Gene Lynard, Bonneville Power
Administration—KEC–4, P.O. Box 3621,
Portland, Oregon, 97208–3621; toll-free
telephone number 1–800–622–4519; fax
number 503–230–5699; or e-mail
gplynard@bpa.gov.
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
SUMMARY: The Western Area Power
Administration (Western) received an
application to interconnect the Big
Stone II Power Plant and Transmission
Project (Project) into Western’s
transmission system. The Project entails
the construction of a new 600-megawatt
(MW) coal-fired electric power
generating station adjacent to the
existing Big Stone plant in Grant
County, South Dakota. The Project also
includes approximately 140 miles of
new or upgraded transmission lines. On
June 26, 2009, Western published a
notice of the availability of the Final
Environmental Impact Statement (EIS)
on the Project (74 FR 30559). Western
considered the environmental impacts
of the Project and has decided to allow
the request to interconnect at Western’s
Morris and Granite Falls substations
located in Minnesota.
FOR FURTHER INFORMATION CONTACT: For
further information, please contact Mr.
Matt Blevins, NEPA Document Manager,
Big Stone II EIS, Western Area Power
Administration, A7400, P.O. Box
281213, Lakewood, CO 80228,
telephone (800) 336–7288, fax (720)
962–7263, or e-mail
BigStoneEIS@wapa.gov. For general
information on DOE’s NEPA review
process, please contact Carol M.
Borgstrom, Director, Office of NEPA
Policy and Compliance, GC–20, U.S.
Department of Energy, Washington, DC
20585, telephone (202) 586–4600 or
(800) 472–2756.
SUPPLEMENTARY INFORMATION: Western is
a Federal agency under the U.S.
Department of Energy (DOE) that
markets and transmits wholesale
electrical power through an integrated
17,000-circuit mile, high-voltage
transmission system across 15 western
states. The Project is located within
Western’s Upper Great Plains Region,
which operates and maintains nearly
E:\FR\FM\24AUN1.SGM
24AUN1
Agencies
[Federal Register Volume 74, Number 162 (Monday, August 24, 2009)]
[Notices]
[Pages 42666-42667]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-20220]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13541-000]
Free Flow Power Ohio River 4, LLC; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
August 14, 2009.
On July 14, 2009, Free Flow Power Ohio River 4, LLC filed an
application for a preliminary permit, pursuant to section 4(f) of the
Federal Power Act, proposing to study the feasibility of the Melville
Crevasse Hydrokinetic Energy Project, located on the Atchafalaya River,
Pointe Coupee and Saint Landry Parishes, Louisiana. The sole purpose of
a preliminary permit, if issued, is to grant the permit holder priority
to file a license application during the permit term. A preliminary
permit does not authorize the permit holder to perform any land
disturbing activities or
[[Page 42667]]
otherwise enter upon lands or waters owned by others without the
owners' express permission.
The proposed project would consist of: (1) 1,720 turbine-generator
units configured in a series of turbine arrays which in turn will be
grouped to form turbine fields; (2) a combination of freestanding
pilings, a floating barge-like platform, or existing shore
infrastructure such as dock pilings onto which the turbine arrays will
be moored; (3) submersible electric cables interconnecting the arrays
within each turbine field and transmit the turbine field's generation
to a shore station; (4) several shore stations each consisting of less
than 100 square meters which will transition the submersible cabling to
the overhead transmission; (5) a 7.6 mile, 69 kV line interconnecting
the shore stations and delivering power to the project substation; and
(6) appurtenant facilities. The proposed project would generate about
150 gigawatt-hours annually.
Applicant contact: Ramya Swaminathan, Free Flow Power Corporation,
33 Commercial Street, Gloucester, Massachusetts 01930, phone: (978)
226-1531.
FERC Contact: Sergiu Serban, 202-502-6211.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Comments, motions to intervene, notices of intent, and competing
applications may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and eight
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For
more information on how to submit these types of filings please go to
the Commission's Web site located at https://www.ferc.gov/filing-comments.asp. More information about this project, including a copy of
the application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-13541) in the docket number field to access
the document. For assistance, call toll-free 1-866-208-3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-20220 Filed 8-21-09; 8:45 am]
BILLING CODE 6717-01-P