KW Sackheim Development; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 42654 [E9-20215]
Download as PDF
42654
Federal Register / Vol. 74, No. 162 / Monday, August 24, 2009 / Notices
erowe on DSK5CLS3C1PROD with NOTICES
facilities located at the United States
border with Canada. LDES does not own
any electric transmission facilities nor
does it hold a franchised service area.
The electric energy which LDES
proposes to export to Canada would be
surplus energy purchased from electric
utilities, Federal power marketing
agencies, and other entities within the
United States. LDES has requested an
electricity export authorization with a 5year term.
The construction, operation,
maintenance, and connection of each of
the international transmission facilities
to be utilized by LDES has previously
been authorized by a Presidential permit
issued pursuant to Executive Order
10485, as amended.
Procedural Matters: Any person
desiring to become a party to these
proceedings or to be heard by filing
comments or protests to this application
should file a petition to intervene,
comment, or protest at the address
provided above in accordance with
§§ 385.211 or 385.214 of the Federal
Energy Regulatory Commission’s Rules
of Practice and Procedures (18 CFR
385.211, 385.214). Fifteen copies of each
petition and protest should be filed with
DOE on or before the date listed above.
Comments on the LDES application to
export electric energy to Canada should
be clearly marked with Docket No. EA–
359. Additional copies are to be filed
directly with Ernest W. Kohnke,
Esquire, Louis Dreyful Highbridge
Energy LLC, 20 Westport Road, Wilton,
CT 06897 and Daniel E. Frank, Caileen
N. Gamache, Sutherland Asbill &
Brennan LLP, 1275 Pennsylvania
Avenue, NW., Washington, DC 20004–
2415. A final decision will be made on
this application after the environmental
impacts have been evaluated pursuant
to the National Environmental Policy
Act of 1969, and a determination is
made by DOE that the proposed action
will not adversely impact on the
reliability of the U.S. electric power
supply system.
Copies of this application will be
made available, upon request, for public
inspection and copying at the address
provided above, by accessing the
program Web site at https://
www.oe.energy.gov/
permits_pending.htm, or by e-mailing
Odessa Hopkins at
Odessa.hopkins@hq.doe.gov.
Issued in Washington, DC, on August 18,
2009.
Anthony J. Como,
Director, Permitting and Siting, Office of
Electricity Delivery and Energy Reliability.
[FR Doc. E9–20301 Filed 8–21–09; 8:45 am]
BILLING CODE 6450–01–P
VerDate Nov<24>2008
15:04 Aug 21, 2009
Jkt 217001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13224–000]
KW Sackheim Development; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
August 14, 2009.
On May 12, 2008, KW Sackheim
Development filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act, proposing
to study the feasibility of the Jackson
Meadows Dam Project, located on the
Middle Yuba River, in Nevada County,
California. The proposed site is a nongenerating feature of the Nevada
Irrigation District’s Yuba-Bear Project,
FERC No. P–2266. The sole purpose of
a preliminary permit, if issued, is to
grant the permit holder priority to file
a license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
Jackson Meadows Development
The proposed project would consist of
the following:
(1) An existing 1,530 foot-long,
195foot-high embankment dam; (2) an
existing reservoir having a surface area
of 738 acres and a storage capacity of
52,500 acre-feet; (3) one penstock
consisting of an existing 42-inchdiameter pipe, 240 feet in length; (4) a
new powerhouse containing one new
generating unit having an installed
capacity of 2.5 megawatts; and (5) a
proposed 8,000-foot-long, 60-kva power
transmission line. The proposed Jackson
Meadows Development would have an
average annual generation of 8.7
gigawatt-hours.
Applicant Contact: Kelly Sackheim,
Principal, KW Sackheim Development,
5096 Cocoa Palm Way, Fair Oaks, CA
95628; phone: 916–962–2271.
FERC Contact: Joseph P. Hassell, 202–
502–8049.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
PO 00000
Frm 00011
Fmt 4703
Sfmt 4703
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project, including a copy of the
application, can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13224) in the docket number field to
access the document. For assistance,
call toll-free 1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–20215 Filed 8–21–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13301–002]
Town of Afton; Notice of Application
Ready for Environmental Analysis and
Soliciting Comments,
Recommendations, Terms and
Conditions, and Prescriptions
August 14, 2009.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Minor.
b. Project No.: P–13301–002.
c. Date filed: April 29, 2009.
d. Applicant: Town of Afton.
e. Name of Project: Culinary Water
System Hydroelectric Project.
f. Location: On the culinary water
supply system, in the Town of Afton,
Lincoln County, Wyoming. The project
as proposed would occupy 12.3 acres of
land in the Bridger-Teton National
Forest.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791 (a)–825(r)
h. Applicant Contact: James K.
Sanderson, Town of Afton, 416
Washington St., P.O. Box 310, Afton,
WY 83110.
i. FERC Contact: Ryan Hansen, 202–
502–8074, ryan.hansen@ferc.gov.
j. Due to the paucity of comments on
the proceeding to date, we are now
issuing the REA notice. Deadline for
filing comments, recommendations,
E:\FR\FM\24AUN1.SGM
24AUN1
Agencies
[Federal Register Volume 74, Number 162 (Monday, August 24, 2009)]
[Notices]
[Page 42654]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-20215]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13224-000]
KW Sackheim Development; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
August 14, 2009.
On May 12, 2008, KW Sackheim Development filed an application for a
preliminary permit, pursuant to section 4(f) of the Federal Power Act,
proposing to study the feasibility of the Jackson Meadows Dam Project,
located on the Middle Yuba River, in Nevada County, California. The
proposed site is a non-generating feature of the Nevada Irrigation
District's Yuba-Bear Project, FERC No. P-2266. The sole purpose of a
preliminary permit, if issued, is to grant the permit holder priority
to file a license application during the permit term. A preliminary
permit does not authorize the permit holder to perform any land-
disturbing activities or otherwise enter upon lands or waters owned by
others without the owners' express permission.
Jackson Meadows Development
The proposed project would consist of the following:
(1) An existing 1,530 foot-long, 195foot-high embankment dam; (2)
an existing reservoir having a surface area of 738 acres and a storage
capacity of 52,500 acre-feet; (3) one penstock consisting of an
existing 42-inch-diameter pipe, 240 feet in length; (4) a new
powerhouse containing one new generating unit having an installed
capacity of 2.5 megawatts; and (5) a proposed 8,000-foot-long, 60-kva
power transmission line. The proposed Jackson Meadows Development would
have an average annual generation of 8.7 gigawatt-hours.
Applicant Contact: Kelly Sackheim, Principal, KW Sackheim
Development, 5096 Cocoa Palm Way, Fair Oaks, CA 95628; phone: 916-962-
2271.
FERC Contact: Joseph P. Hassell, 202-502-8049.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Comments, motions to intervene, notices of intent, and competing
applications may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and eight
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For
more information on how to submit these types of filings please go to
the Commission's Web site located at https://www.ferc.gov/filing-comments.asp. More information about this project, including a copy of
the application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-13224) in the docket number field to access
the document. For assistance, call toll-free 1-866-208-3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-20215 Filed 8-21-09; 8:45 am]
BILLING CODE 6717-01-P