Environmental Impacts Statements; Notice of Availability, 42295-42296 [E9-20200]

Download as PDF srobinson on DSKHWCL6B1PROD with NOTICES Federal Register / Vol. 74, No. 161 / Friday, August 21, 2009 / Notices routinely disseminates TSCA section 8(e) data it receives to other Federal agencies to provide information about newly discovered chemical hazards and risks. This information collection request addresses the above reporting requirement. Responses to the collection of information are mandatory (see 15 U.S.C. 2607(e)). Respondents may claim all or part of a notice confidential. EPA will disclose information that is covered by a claim of confidentiality only to the extent permitted by, and in accordance with, the procedures in TSCA section 14 and 40 CFR part 2. Burden Statement: The annual public reporting and recordkeeping burden for this collection of information is estimated to average about 51 hours per response for initial TSCA section 8(e) submissions and 5 hours per response for follow-up or supplemental submissions. Burden means the total time, effort or financial resources expended by persons to generate, maintain, retain or disclose or provide information to or for a Federal agency. This includes the time needed to review instructions; develop, acquire, install and utilize technology and systems for the purposes of collecting, validating and verifying information, processing and maintaining information, and disclosing and providing information; adjust the existing ways to comply with any previously applicable instructions and requirements; train personnel to be able to respond to a collection of information; search data sources; complete and review the collection of information; and transmit or otherwise disclose the information. Respondents/Affected Entities: Entities potentially affected by this action are companies that manufacture, import, process or distribute chemical substances or mixtures. Frequency of Collection: On occasion. Estimated average number of responses for each respondent: 1. Estimated No. of Respondents: 721. Estimated Total Annual Burden on Respondents: 30,515 hours. Estimated Total Annual Costs: $2,057,588. Changes in Burden Estimates: There is an increase of 12,380 hours (from 18,135 hours to 30,515 hours) in the total estimated respondent burden compared with that currently in the OMB inventory. This increase reflects an increase in the number of anticipated TSCA section 8(e) submissions. This change is an adjustment. The Supporting Statement provides additional detail concerning the change in burden estimates. VerDate Nov<24>2008 16:22 Aug 20, 2009 Jkt 217001 Dated: August 17, 2009. John Moses, Director, Collection Strategies Division. [FR Doc. E9–20211 Filed 8–20–09; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–8596–5] Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–1399 or https://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements Filed 08/10/2009 through 08/14/2009 Pursuant to 40 CFR 1506.9. Special Notice: EPA’s Notice of Availability for EIS’s filed August 3, 2009 through August 7, 2009 scheduled to appear in the Federal Register on August 14, 2009 were published on Monday, August 17, 2009. Comment periods and wait periods will be calculated from August 17, 2009; see Amended Notices below. EIS No. 20090285, Draft EIS, NPS, CA, Warner Valley Comprehensive Site Plan, Addressing Natural and Cultural Resource Conflicts, Parking and Circulation Improvements in Warner Valley, Implementation, Lassen Volcanic National Park, Plumas County, CA, Comment Period Ends: 11/21/2009, Contact: Louise Johnson 530–595–4444 ext. 5170. EIS No. 20090286, Draft EIS, NPS, FL, Biscayne National Park Fishery Management Plan, Improvement of the Status of Fisheries Resources, Implementation, Miami-Dade County, FL, Comment Period Ends: 10/06/ 2009, Contact: Mark Lewis 305–230– 1144 ext. 3003. EIS No. 20090287, Draft EIS, AFS, CO, Willow Creek Pass Fuel Reduction Project, Implementation, Hahns Peak/ Bear Ears Ranger District, Medicine Bow-Routt National Forests, Routt County, CO, Comment Period Ends: 10/05/2009, Contact: Brian Waugh 970–870–2185. EIS No. 20090288, Final EIS, COE, CA, Natomas Levee Improvement Program, Phase 3 Landside Improvements Project, Issuance of Section 408 and 404 Permits, Sacramento and Sutter Counties, CA, Wait Period Ends: 09/21/2009, Contact: Elizabeth Holland 916–557– 6763. EIS No. 20090289, Final EIS, FTA, CO, Gold Line Corridor Project, PO 00000 Frm 00071 Fmt 4703 Sfmt 4703 42295 Development of Fixed-Guideway Transit Improvements, from Denver Union Station to Ward Road in Wheat Ridge, Implementation, City and County of Denver, Adams, Arvada, Wheat Ridge, and Jefferson Counties, CO, Wait Period Ends: 09/21/2009, Contact: David Beckhouse 720–963– 3306. EIS No. 20090290, Draft EIS, FTA, WI, Kenosha-Racine-Milwaukee Commuter Rail Extension, Alternative Analysis, U.S. COE Section 404 Permit, Funding, Kenosha, Racine, and Milwaukee Counties, WI, Comment Period Ends: 10/05/2009, Contact: Stewart McKenzie 312–353– 2866. EIS No. 20090291, Final EIS, SFW, NV, Desert National Wildlife Refuge Complex, Ash Meadows, Desert, Moapa Valley and Pahranagat National Wildlife Refuges, Comprehensive Conservation Plan, Implementation, Clark, Lincoln, and Nye Counties, NV, Wait Period Ends: 09/21/2009, Contact: Cynthia Martinez 702–515–5450. EIS No. 20090292, Final EIS, USA, CA, Camp Parks Real Property Master Plan and Real Property Exchange, Redevelopment of the Cantonment Area, NPDES Permit, U.S. COE Section 4040 Permit, Alamada and Contra Costa Counties, CA, Wait Period Ends: 09/21/2009, Contact: Jennifer Shore 703 602–4238. Amended Notices EIS No. 20090275, Final EIS, FHW, KY, I–65 to U.S. 31 W Access Improvement Project, To Meet the Existing and Future Transportation Demand, in northeast Bowling Green, Warren County, KY, Wait Period Ends: 09/16/2009, Contact: Jose Sepulveda 502–223–6764. EIS No. 20090276, Final Supplement, COE, WA, Commencement Bay ‘‘Reauthorization’’ of Dredged Material Management Program Disposal Site, Implementation, Central Puget Sound, Tacoma, WA, Wait Period Ends: 09/16/2009, Contact: Dr. Stephen Martin 206–764– 3631. EIS No. 20090277, Draft EIS, AFS, CO, Hermosa Park/Mitchell Lakes Land Exchange Project, Proposed Land Exchange between Federal and NonFederal Lands, Implementation, Federal Land in LaPlata County and Non-Federal Land in San Juan County, CO, Comment Period Ends: 10/01/2009, Contact: Cindy Hockelberg 970–884–1418. EIS No. 20090278, Draft Supplement, FHW, NH, I–93 Highway Improvements, from Massachusetts E:\FR\FM\21AUN1.SGM 21AUN1 srobinson on DSKHWCL6B1PROD with NOTICES 42296 Federal Register / Vol. 74, No. 161 / Friday, August 21, 2009 / Notices State Line to Manchester, NH, Funding, NPDES and and U.S. Army COE Section 404 Permits Issuance, Hillsborough and Rockingham Counties, NH, Comment Period Ends: 10/01/2009, Contact: Jamison S. Sikora 603–228–3057 Ext. 107. EIS No. 20090279, Draft EIS, BLM, WA, Blackfoot Bridge Mine Project, Developing Three Mine Pits, Haul Roads, Water Management Structures, and Overburden Disposal Areas, Implementation, Caribou County, ID, Comment Period Ends: 10/01/2009, Contact: Kyle Free 208–478–6368. EIS No. 20090280, Draft Supplement, FHW, TN, Shelby Avenue/ Demonbreun Street (Gateway Boulevard Corridor, from I–65 North [I–24 West] to I–40 West in Downtown Nashville, To Address Transportation needs in the Study Area. Davidson County, TN, Comment Period Ends: 10/01/2009, Contact: Charles O’Neill 615–781–5770. EIS No. 20090281, Final EIS, BLM, WY, South Gillette Area Coal Lease Applications, WYW172585, WYW173360, WYW172657, WYW161248, Proposal to Lease Four Tracts of Federal Coal Reserves, Belle Ayr, Coal Creek, Caballo, and Cordero Rojo Mines, Wyoming Powder River Basin, Campbell County, WY, Wait Period Ends: 09/16/2009, Contact: Teresa Johnson 307–261–7510. EIS No. 20090282, Final EIS, FRC, VA, Smith Mountain Pumped Storage Project (FERC No. 2210–169). Application for Hydropower License to continue Operating the 636megawatt Pumped Storage Project, Roanoke River, Smith Mountain Pumped Storage Project (FERC No. 2210–169). Application for Hydropower License to continue Operating the 636-megawatt Pumped Storage Project, Roanoke River, Bedford, Campbell, Franklin and Pittsylvania Counties, VA, Wait Period Ends: 09/16/2009, Contact: Julia Bovey 1–866–208–3372. EIS No. 20090283, Draft EIS, NPS, WI, Apostle Islands National Lakeshore General Management Plan/Wilderness Management Plan, Implementation, Bayfield and Ashland Counties, WI, Comment Period Ends: 10/13/2009, Contact: Nick Chevance 402–661– 1844. EIS No. 20090284, Final EIS, ARD, WA, ADOPTION—White Pass Expansion Master Development Plan, Implementation, Naches Ranger District, Okanogan-Wenatchee National Forests and Cowlitz Valley Ranger District, Gifford Pinchot National Forest, Yakima and Lewis Counties, WA, Wait Period Ends: 09/ VerDate Nov<24>2008 16:22 Aug 20, 2009 Jkt 217001 16/2009, Contact: Frank Mancino 202–720–1827. Dated: August 18, 2009. Robert W. Hargrove, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. E9–20200 Filed 8–20–09; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–8596–6] Environmental Impact Statements and Regulations; Availability of EPA Comments Availability of EPA comments prepared pursuant to the Environmental Review Process (ERP), under section 309 of the Clean Air Act and Section 102(2)(c) of the National Environmental Policy Act as amended. Requests for copies of EPA comments can be directed to the Office of Federal Activities at 202–564–7146. An explanation of the ratings assigned to draft environmental impact statements (EISs) was published in Federal Register Dated July 17, 2009 (74 FR 34754). Draft EISs EIS No. 20090152, ERP No. D–BLM– J80008–UT, Mona to Oquirrh Transmission Corridor Project and Draft Pong Express Resource Management Plan Amendment, Construction, Operation, Maintenance and Decommissioning a DoubleCircuit 500/345 Kilovolt (Kv) Transmission Line, Right-of-Way Grant, Rocky Mountain Power, Juab, Salt Lake, Tooele and Utah Counties, UT. Summary: EPA expressed environmental concerns about wetland impacts and the disturbance of a Superfund site, and requested additional information on wetland and air quality impacts. Rating EC2. EIS No. 20090159, ERP No. D–FHW– E40827–NC, Gaston East-West Connector Project, Construction from I–85 west Gastonia to I–485/NC 160 near the Charlotte-Douglas International Airport, Gaston and Meckleburg Counties, NC. Summary: EPA expressed environmental objections because the project will potentially contribute significant VMTs and increased emissions and ultimately make achievement of the NAAQS difficult. In addition, jurisdictional waters are currently impaired in the project study area from construction and related activities. Both the direct and indirect PO 00000 Frm 00072 Fmt 4703 Sfmt 4703 and cumulative impacts will potentially further degrade water quality. Rating EO2. EIS No. 20090170, ERP No. D–FHW– F40448–WI, Zoo Interchange Corridor Study, Reconstruction to I0–94 from 70th Street to 124 Street and on U.S. 45 from Burleigh Street to I–894/U.S. 45 and Lincoln Avenue in Milwaukee County, WI. Summary: EPA expressed environmental concerns about air quality, wetland, and surface water impacts. Rating EC2. EIS No. 20090171, ERP No. D–NOA– L99011–WA, PROGRAMMATIC— Lower Duwamish River Natural Resource Damage Assessment (NRDA) Restoration Plan, Implementation, King County, WA. Summary: While EPA has no objections to the proposed action, it requested clarification of water quality issues. Rating LO. EIS No. 20090178, ERP No. D–IBR– K29002–CA, North Bay Water Recycling Program (NBWRP), (Formerly North San Pablo Bay Restoration and Reuse Project), Proposed to Promote the Expanded Beneficial Use of Recycled Water, Northern Marin Water District, Napa County, CA. Summary: While EPA has no objection to the proposed action, it requested clarification of water related issues. Rating LO. EIS No. 20090181, ERP No. D–AFS– K65368–CA, Lower Trinity and Mad River Motorized Travel Management, Proposed to Prohibit Cross-County Motor Vehicle Travel Off Designated National Forest Transportation System (NFTS) Roads and Motorized Trails, Six River National Forest, CA. Summary: EPA expressed environmental concerns about impacts to riparian and aquatic resources and to perennial creeks, wet meadows, and fens. Rating EC2. EIS No. 20090189, ERP No. D–AFS– K65370–CA, Beaverslide Timber Sale and Fuel Treatment Project, Proposing to Harvest Commercial Timber and Treat Hazardous Fuels, Six Rivers National Forest, Mad River Ranger District, Trinity County, CA. Summary: EPA expressed environmental concerns about potential adverse impacts to already impaired water bodies. Rating EC2. EIS No. 20090199, ERP No. D–AFS– L65573–OR, Westside Rangeland Analysis Project, Proposal to Allocate Forage for Commercial Livestock Grazing on Six Alternatives, Mud and E:\FR\FM\21AUN1.SGM 21AUN1

Agencies

[Federal Register Volume 74, Number 161 (Friday, August 21, 2009)]
[Notices]
[Pages 42295-42296]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-20200]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-8596-5]


Environmental Impacts Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements Filed 08/10/2009 
through 08/14/2009
Pursuant to 40 CFR 1506.9.

    Special Notice: EPA's Notice of Availability for EIS's filed August 
3, 2009 through August 7, 2009 scheduled to appear in the Federal 
Register on August 14, 2009 were published on Monday, August 17, 2009. 
Comment periods and wait periods will be calculated from August 17, 
2009; see Amended Notices below.

EIS No. 20090285, Draft EIS, NPS, CA, Warner Valley Comprehensive Site 
Plan, Addressing Natural and Cultural Resource Conflicts, Parking and 
Circulation Improvements in Warner Valley, Implementation, Lassen 
Volcanic National Park, Plumas County, CA, Comment Period Ends: 11/21/
2009, Contact: Louise Johnson 530-595-4444 ext. 5170.
EIS No. 20090286, Draft EIS, NPS, FL, Biscayne National Park Fishery 
Management Plan, Improvement of the Status of Fisheries Resources, 
Implementation, Miami-Dade County, FL, Comment Period Ends: 10/06/2009, 
Contact: Mark Lewis 305-230-1144 ext. 3003.
EIS No. 20090287, Draft EIS, AFS, CO, Willow Creek Pass Fuel Reduction 
Project, Implementation, Hahns Peak/Bear Ears Ranger District, Medicine 
Bow-Routt National Forests, Routt County, CO, Comment Period Ends: 10/
05/2009, Contact: Brian Waugh 970-870-2185.
EIS No. 20090288, Final EIS, COE, CA, Natomas Levee Improvement 
Program, Phase 3 Landside Improvements Project, Issuance of Section 408 
and 404 Permits, Sacramento and Sutter Counties, CA, Wait Period Ends: 
09/21/2009, Contact: Elizabeth Holland 916-557-6763.
EIS No. 20090289, Final EIS, FTA, CO, Gold Line Corridor Project, 
Development of Fixed-Guideway Transit Improvements, from Denver Union 
Station to Ward Road in Wheat Ridge, Implementation, City and County of 
Denver, Adams, Arvada, Wheat Ridge, and Jefferson Counties, CO, Wait 
Period Ends: 09/21/2009, Contact: David Beckhouse 720-963-3306.
EIS No. 20090290, Draft EIS, FTA, WI, Kenosha-Racine-Milwaukee Commuter 
Rail Extension, Alternative Analysis, U.S. COE Section 404 Permit, 
Funding, Kenosha, Racine, and Milwaukee Counties, WI, Comment Period 
Ends: 10/05/2009, Contact: Stewart McKenzie 312-353-2866.
EIS No. 20090291, Final EIS, SFW, NV, Desert National Wildlife Refuge 
Complex, Ash Meadows, Desert, Moapa Valley and Pahranagat National 
Wildlife Refuges, Comprehensive Conservation Plan, Implementation, 
Clark, Lincoln, and Nye Counties, NV, Wait Period Ends: 09/21/2009, 
Contact: Cynthia Martinez 702-515-5450.
EIS No. 20090292, Final EIS, USA, CA, Camp Parks Real Property Master 
Plan and Real Property Exchange, Redevelopment of the Cantonment Area, 
NPDES Permit, U.S. COE Section 4040 Permit, Alamada and Contra Costa 
Counties, CA, Wait Period Ends: 09/21/2009, Contact: Jennifer Shore 703 
602-4238.

Amended Notices

EIS No. 20090275, Final EIS, FHW, KY, I-65 to U.S. 31 W Access 
Improvement Project, To Meet the Existing and Future Transportation 
Demand, in northeast Bowling Green, Warren County, KY, Wait Period 
Ends: 09/16/2009, Contact: Jose Sepulveda 502-223-6764.
EIS No. 20090276, Final Supplement, COE, WA, Commencement Bay 
``Reauthorization'' of Dredged Material Management Program Disposal 
Site, Implementation, Central Puget Sound, Tacoma, WA, Wait Period 
Ends: 09/16/2009, Contact: Dr. Stephen Martin 206-764-3631.
EIS No. 20090277, Draft EIS, AFS, CO, Hermosa Park/Mitchell Lakes Land 
Exchange Project, Proposed Land Exchange between Federal and Non-
Federal Lands, Implementation, Federal Land in LaPlata County and Non-
Federal Land in San Juan County, CO, Comment Period Ends: 10/01/2009, 
Contact: Cindy Hockelberg 970-884-1418.
EIS No. 20090278, Draft Supplement, FHW, NH, I-93 Highway Improvements, 
from Massachusetts

[[Page 42296]]

State Line to Manchester, NH, Funding, NPDES and and U.S. Army COE 
Section 404 Permits Issuance, Hillsborough and Rockingham Counties, NH, 
Comment Period Ends: 10/01/2009, Contact: Jamison S. Sikora 603-228-
3057 Ext. 107.
EIS No. 20090279, Draft EIS, BLM, WA, Blackfoot Bridge Mine Project, 
Developing Three Mine Pits, Haul Roads, Water Management Structures, 
and Overburden Disposal Areas, Implementation, Caribou County, ID, 
Comment Period Ends: 10/01/2009, Contact: Kyle Free 208-478-6368.
EIS No. 20090280, Draft Supplement, FHW, TN, Shelby Avenue/Demonbreun 
Street (Gateway Boulevard Corridor, from I-65 North [I-24 West] to I-40 
West in Downtown Nashville, To Address Transportation needs in the 
Study Area. Davidson County, TN, Comment Period Ends: 10/01/2009, 
Contact: Charles O'Neill 615-781-5770.
EIS No. 20090281, Final EIS, BLM, WY, South Gillette Area Coal Lease 
Applications, WYW172585, WYW173360, WYW172657, WYW161248, Proposal to 
Lease Four Tracts of Federal Coal Reserves, Belle Ayr, Coal Creek, 
Caballo, and Cordero Rojo Mines, Wyoming Powder River Basin, Campbell 
County, WY, Wait Period Ends: 09/16/2009, Contact: Teresa Johnson 307-
261-7510.
EIS No. 20090282, Final EIS, FRC, VA, Smith Mountain Pumped Storage 
Project (FERC No. 2210-169). Application for Hydropower License to 
continue Operating the 636-megawatt Pumped Storage Project, Roanoke 
River, Smith Mountain Pumped Storage Project (FERC No. 2210-169). 
Application for Hydropower License to continue Operating the 636-
megawatt Pumped Storage Project, Roanoke River, Bedford, Campbell, 
Franklin and Pittsylvania Counties, VA, Wait Period Ends: 09/16/2009, 
Contact: Julia Bovey 1-866-208-3372.
EIS No. 20090283, Draft EIS, NPS, WI, Apostle Islands National 
Lakeshore General Management Plan/Wilderness Management Plan, 
Implementation, Bayfield and Ashland Counties, WI, Comment Period Ends: 
10/13/2009, Contact: Nick Chevance 402-661-1844.
EIS No. 20090284, Final EIS, ARD, WA, ADOPTION--White Pass Expansion 
Master Development Plan, Implementation, Naches Ranger District, 
Okanogan-Wenatchee National Forests and Cowlitz Valley Ranger District, 
Gifford Pinchot National Forest, Yakima and Lewis Counties, WA, Wait 
Period Ends: 09/16/2009, Contact: Frank Mancino 202-720-1827.

    Dated: August 18, 2009.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
 [FR Doc. E9-20200 Filed 8-20-09; 8:45 am]