Community Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 41880-41881 [E9-19828]
Download as PDF
41880
Federal Register / Vol. 74, No. 159 / Wednesday, August 19, 2009 / Notices
• Public Comments.
• Final Comments.
• Adjourn.
Breaks taken as appropriate.
Public Participation: The meeting is
open to the public. The EM SSAB,
Portsmouth, welcomes the attendance of
the public at its advisory committee
meetings and will make every effort to
accommodate persons with physical
disabilities or special needs. If you
require special accommodations due to
a disability, please contact David
Kozlowski at least seven days in
advance of the meeting at the phone
number listed above. Written statements
may be filed with the Board either
before or after the meeting. Individuals
who wish to make oral statements
pertaining to agenda items should
contact David Kozlowski at the address
or telephone number listed above.
Requests must be received five days
prior to the meeting and reasonable
provision will be made to include the
presentation in the agenda. The Deputy
Designated Federal Officer is
empowered to conduct the meeting in a
fashion that will facilitate the orderly
conduct of business. Individuals
wishing to make public comment will
be provided a maximum of five minutes
to present their comments.
Minutes: Minutes will be available by
writing or calling David Kozlowski at
the address and phone number listed
above. Minutes will also be available at
the following Web site: https://
www.ports-ssab.org/
publicmeetings.html.
Issued at Washington, DC, on August 14,
2009.
Rachel Samuel,
Deputy Committee Management Officer.
[FR Doc. E9–19898 Filed 8–18–09; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Environmental Management SiteSpecific Advisory Board, Northern New
Mexico
Department of Energy.
Notice of Open Meeting.
AGENCY:
jlentini on DSKJ8SOYB1PROD with NOTICES
ACTION:
SUMMARY: This notice announces a
meeting of the Environmental
Management Site-Specific Advisory
Board (EM SSAB), Northern New
Mexico. The Federal Advisory
Committee Act (Pub. L. No. 92–463, 86
Stat. 770) requires that public notice of
this meeting be announced in the
Federal Register.
DATES: Wednesday, September 30, 2009,
2 p.m.–8 p.m.
VerDate Nov<24>2008
16:53 Aug 18, 2009
Jkt 217001
Holiday Inn Santa Fe, 4048
Cerillos Road, Santa Fe, New Mexico.
FOR FURTHER INFORMATION CONTACT:
Menice Santistevan, Northern New
Mexico Citizens’ Advisory Board
(NNMCAB), 1660 Old Pecos Trail, Suite
B, Santa Fe, NM 87505. Phone (505)
995–0393; Fax (505) 989–1752 or Email: msantistevan@doeal.gov.
SUPPLEMENTARY INFORMATION: Purpose of
the Board: The purpose of the Board is
to make recommendations to DOE in the
areas of environmental restoration,
waste management, and related
activities.
ADDRESSES:
Tentative Agenda
2 p.m. Call to Order by Deputy
Designated Federal Officer, Jeff
Casalina
Establishment of a Quorum, Lorelei
Novak
• Roll Call
• Excused Absences
Welcome and Introductions, J.D.
Campbell
Approval of Agenda
Approval of July 29, 2009 Meeting
Minutes
2:15 p.m. Old Business
• Written Reports
• Open Discussion from Board
Members
• Voting Procedures
2:45 p.m. New Business
• Report from Nominating
Committee, Deb Shaw
• Election of Chair and Vice Chair for
Fiscal Year (FY) 2010
• Consideration and Action on
Meeting Schedule for FY 2010
• Appoint Ad Hoc Committee for
Annual Evaluation
3:15 p.m. Deputy Designated Federal
Officer Report, Jeff Casalina
3:30 p.m. Break
3:45 p.m. Ad Hoc Committee Reports
• Community Outreach
• Board Processes
• Budget Priorities for FY 2011
4 p.m. Standing Committee Reports
• Presentation of FY 2010 Committee
Work Plans
• Consideration and Action on
Committee Work Plans for
Submittal to DOE
5 p.m. Dinner Break
6 p.m. Public Comment Period
6:15 p.m. Consideration and Action on
Recommendation(s)
7:45 p.m. Round Robin Discussion
8 p.m. Adjourn, Jeff Casalina
Public Participation: The EM SSAB,
Northern New Mexico, welcomes the
attendance of the public at its advisory
committee meetings and will make
every effort to accommodate persons
with physical disabilities or special
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
needs. If you require special
accommodations due to a disability,
please contact Menice Santistevan at
least seven days in advance of the
meeting at the telephone number listed
above. Written statements may be filed
with the Board either before or after the
meeting. Individuals who wish to make
oral statements pertaining to agenda
items should contact Menice
Santistevan at the address or telephone
number listed above. Requests must be
received five days prior to the meeting
and reasonable provision will be made
to include the presentation in the
agenda. The Deputy Designated Federal
Officer is empowered to conduct the
meeting in a fashion that will facilitate
the orderly conduct of business.
Individuals wishing to make public
comment will be provided a maximum
of five minutes to present their
comments.
Minutes: Minutes will be available by
writing or calling Menice Santistevan at
the address or phone number listed
above. Minutes and other Board
documents are on the Internet at:
https://www.nnmcab.org/.
Issued at Washington, DC on August 14,
2009.
Rachel Samuel,
Deputy Committee Management Officer.
[FR Doc. E9–19899 Filed 8–18–09; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13375–000]
Community Hydro, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
August 12, 2009.
On February 20, 2009, Community
Hydro, LLC filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act, proposing
to study the feasibility of the Falls Lake
Dam Hydroelectric Project, located on
the Neuse River, Wake County, North
Carolina. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
E:\FR\FM\19AUN1.SGM
19AUN1
Federal Register / Vol. 74, No. 159 / Wednesday, August 19, 2009 / Notices
The proposed project would consist
of: (1) Six turbine-generators with a total
installed capacity of 2,500 kW; (2) a
700-foot-long, 13.8 kV transmission line;
and (3) appurtenant facilities. The
proposed project would generate about
8,300 megawatt-hours annually.
Applicant Contact: Lori Barg,
Community Hydro LLC, 113 Bartlett
Road, Plainfield, VT, phone: (802) 454–
1874.
FERC Contact: Sergiu Serban, 202–
502–6211.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13375) in the docket number field to
access the document. For assistance,
call toll-free 1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–19828 Filed 8–18–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
jlentini on DSKJ8SOYB1PROD with NOTICES
[Docket Nos. CP03–75–006 and CP05–361–
004]
Freeport LNG Development, L.P.;
Freeport LNG Expansion, L.P.; Notice
of Filing
August 12, 2009.
Take notice that on August 3, 2009,
Freeport LNG Development, L.P. and
Freeport LNG Expansion, L.P. (Freeport
LNG), 333 Clay Street, Suite 5050,
Houston, TX 77002, filed an
VerDate Nov<24>2008
16:53 Aug 18, 2009
Jkt 217001
application, pursuant to section 3(a) of
the Natural Gas Act (NGA) and parts
153 and 380 of the Commission’s Rules
and Regulations, for a limited
amendment to its certificates issued on
June 18, 2004 and September 26, 2006
in Docket Nos. CP03–75–000 and CP05–
361–000, respectively. Freeport LNG
requests authorization to construct and
operate a natural gas liquids (NGL)
extraction system at the Quintana Island
terminal. The application is on file with
the Commission and open for public
inspection. This filing is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or for TTY,
contact (202) 502–8659.
The NGL extraction system will
enable Freeport LNG to extract and
recover NGLs (primarily ethane,
propane, and butane) from the
terminal’s LNG throughput. The NGL
extraction system involve the
construction and operation of the
following facilities (i) two 400 MMcf/
day NGL extraction trains, collectively
providing 0.80 Bcf/day of NGL
extraction capability; (ii) a 60,000
barrels per day depropanizer, (iii)
associated non-modular equipment; (iv)
two co-located NGL plant pipelines (8inch and 12-inch diameter); and (v) and
NGL delivery pipeline and associated
metering, pigging and valve facilities.
The proposed facilities will be
constructed within the authorized
operational area of the Quintana Island
terminal. Freeport LNG proposes a
service date of June 2011.
Any questions regarding the
application are to be directed to Michael
Johns, Freeport LNG Development, L.P.,
333 Clay Street, Suite 5050, Houston,
TX 77002; phone number (979) 415–
8720 or Lisa M. Tonery, Fulbright &
Jaworski L.L.P., 666 Fifth Avenue, New
York, NY 10103; phone number (212)
318–3009, ltonery@fulbright.com.
Any person wishing to obtain legal
status by becoming a party to the
proceedings for this project should, on
or before the below listed comment
date, file with the Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426, a
motion to intervene in accordance with
the requirements of the Commission’s
Rules of Practice and Procedure (18 CFR
385.214 or 385.211) and the Regulations
under the NGA (18 CFR 157.10). A
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
41881
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies of all documents
filed by the applicant and by all other
parties. A party must submit 14 copies
of filings made with the Commission
and must mail a copy to the applicant
and to every other party in the
proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
Motions to intervene, protests and
comments may be filed electronically
via the Internet in lieu of paper, see, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘e-Filing’’ link. The
Commission strongly encourages
electronic filings.
Comment Date: September 2, 2009.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–19830 Filed 8–18–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER09–1554–000]
RMH Energy, LP; Supplemental Notice
That Initial Market-Based Rate Filing
Includes Request for Blanket Section
204 Authorization
August 12, 2009.
This is a supplemental notice in the
above-referenced proceeding of RMH
Energy. LP’s application for marketbased rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is September 1,
2009.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
E:\FR\FM\19AUN1.SGM
19AUN1
Agencies
[Federal Register Volume 74, Number 159 (Wednesday, August 19, 2009)]
[Notices]
[Pages 41880-41881]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-19828]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13375-000]
Community Hydro, LLC; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
August 12, 2009.
On February 20, 2009, Community Hydro, LLC filed an application for
a preliminary permit, pursuant to section 4(f) of the Federal Power
Act, proposing to study the feasibility of the Falls Lake Dam
Hydroelectric Project, located on the Neuse River, Wake County, North
Carolina. The sole purpose of a preliminary permit, if issued, is to
grant the permit holder priority to file a license application during
the permit term. A preliminary permit does not authorize the permit
holder to perform any land disturbing activities or otherwise enter
upon lands or waters owned by others without the owners' express
permission.
[[Page 41881]]
The proposed project would consist of: (1) Six turbine-generators
with a total installed capacity of 2,500 kW; (2) a 700-foot-long, 13.8
kV transmission line; and (3) appurtenant facilities. The proposed
project would generate about 8,300 megawatt-hours annually.
Applicant Contact: Lori Barg, Community Hydro LLC, 113 Bartlett
Road, Plainfield, VT, phone: (802) 454-1874.
FERC Contact: Sergiu Serban, 202-502-6211.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Comments, motions to intervene, notices of intent, and competing
applications may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and eight
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For
more information on how to submit these types of filings please go to
the Commission's Web site located at https://www.ferc.gov/filing-comments.asp.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-13375) in the docket number field to access
the document. For assistance, call toll-free 1-866-208-3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-19828 Filed 8-18-09; 8:45 am]
BILLING CODE 6717-01-P