Clean River Power MR-4, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 41420 [E9-19611]
Download as PDF
mstockstill on DSKH9S0YB1PROD with NOTICES
41420
Federal Register / Vol. 74, No. 157 / Monday, August 17, 2009 / Notices
and Garden, South Carolina Department
of Natural Resources, the South Carolina
Wildlife Federation, and the South
Carolina Department of Archives and
History. The purpose of the Agreement
is to resolve, as well as to provide
procedures for resolving, among the
signatories, issues associated with
issuance of a new license for the project,
including Lake Murray lake levels and
downstream minimum flows in the
lower Saluda River. Major issues
covered in the settlement include: (1)
Public safety measures associated with
the release of flows to the Saluda River
downstream from the Saluda dam; (2)
six measures to protect of aquatic
resources, including trout and sturgeon,
in the lower Saluda river; (3) minimum
and recreation flow releases from the
Saluda dam to the lower Saluda River;
(4) a low-flow operating protocol, except
for the lake level that would trigger
implementation of the protocol; (5)
upgrading unit runners to improve
water quality in the downstream
reaches; (6) leasing lands for waterfowl
habitat; and (7) recreational
improvements at existing sites around
Lake Murray and along the lower Saluda
River, as well as set-aside lands for
future recreation sites.
SC Electric & Gas requests that the
Commission: (1) Incorporate the
obligations and agreements, as
illustrated in Appendix A of the
Agreement, without material
modification into the terms and
conditions of the new license; and (2)
issue a new license for a term of 50
years.
l. A copy of the Settlement Agreement
is available for review at the
Commission in the Public Reference
Room or may be viewed on the
Commission’s Web site at https://
www.ferc.gov, using the ‘‘e-Library’’
link. Enter the docket number,
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item h above.
You may register online at https://
www.ferc.gov/esubscribenow.htm to be
notified via e-mail of new filings and
issuances related to this or other
pending projects. For assistance, contact
FERC Online Support.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E9–19612 Filed 8–14–09; 8:45 am]
BILLING CODE 6717–01–P
VerDate Nov<24>2008
17:55 Aug 14, 2009
Jkt 217001
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–13403) in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3372.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13403–000]
Clean River Power MR–4, LLC; Notice
of Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E9–19611 Filed 8–14–09; 8:45 am]
BILLING CODE P
August 6, 2009.
On March 25, 2009, Clean River
Power MR–4, LLC filed an application,
pursuant to section 4(f) of the Federal
Power Act, proposing to study the
feasibility of the Luke’s Chute Lock and
Dam Water Power Project, to be located
at the State of Ohio’s Luke’s Chute Lock
and Dam on the Muskingum River in
Washington County, Ohio.
The proposed Luke’s Chute Lock and
Dam Project would consist of: (1) The
existing 19.7-foot-high, 546-foot-long
concrete dam; (2) the existing 490-acre
reservoir with a 3,345 acre-foot storage
capacity; (3) a new 150-foot-long, 120foot-wide intake structure; (4) a 200foot-long, 120-foot-wide power canal;
(5) a new powerhouse containing three
proposed generating units with a total
installed capacity of 3.9 megawatts; (6)
a new 150-foot-long tailrace; (7) a new
switchyard containing a single threephase step-up transformer; and (8) a
new 1,500-foot-long, 34.5-kilovolt
overhead transmission line. The project
would have an estimated average annual
generation of 15,600 megawatt-hours.
Applicant Contact: Mr. Alan Skelly,
8425 Beechmont Avenue, Cincinnati,
OH 45255, phone (513) 375–9242.
FERC Contact: Michael Spencer, (202)
502–6093.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at https://
www.ferc.gov/filing-comments.asp.
More information about this project can
be viewed or printed on the ‘‘eLibrary’’
PO 00000
Frm 00055
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13411–000]
Clean River Power MR–6, LLC; Notice
of Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
August 6, 2009.
On March 25, 2009, Clean River
Power MR–6, LLC filed an application,
pursuant to section 4(f) of the Federal
Power Act, proposing to study the
feasibility of the Rokeby Lock and Dam
Water Power Project, to be located at the
State of Ohio’s Rokeby lock and dam on
the Muskingum River in Morgan
County, Ohio.
The proposed Rokeby Lock and Dam
Project would consist of: (1) The
existing 20-foot-high, 525-foot-long
concrete dam; (2) the existing 615-acre
reservoir with a 4,576 acre-foot storage
capacity; (3) a new 150-foot-long, 140foot-wide intake structure; (4) a 150foot-long, 140-foot-wide power canal;
(5) a new powerhouse containing six
proposed generating units with a total
installed capacity of 2.8 megawatts; (6)
a new 100-foot-long tailrace; (7) a new
switchyard containing a single threephase step-up transformer; and (8) a
new 1,200-foot-long, 34.5-kilovolt
overhead transmission line. The project
would have an estimated average annual
generation of 11,400 megawatt-hours.
Applicant Contact: Mr. Alan Skelly,
8425 Beechmont Avenue, Cincinnati,
OH 45255, phone (513) 375–9242.
FERC Contact: Michael Spencer, (202)
502–6093.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
E:\FR\FM\17AUN1.SGM
17AUN1
Agencies
[Federal Register Volume 74, Number 157 (Monday, August 17, 2009)]
[Notices]
[Page 41420]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-19611]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13403-000]
Clean River Power MR-4, LLC; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
August 6, 2009.
On March 25, 2009, Clean River Power MR-4, LLC filed an
application, pursuant to section 4(f) of the Federal Power Act,
proposing to study the feasibility of the Luke's Chute Lock and Dam
Water Power Project, to be located at the State of Ohio's Luke's Chute
Lock and Dam on the Muskingum River in Washington County, Ohio.
The proposed Luke's Chute Lock and Dam Project would consist of:
(1) The existing 19.7-foot-high, 546-foot-long concrete dam; (2) the
existing 490-acre reservoir with a 3,345 acre-foot storage capacity;
(3) a new 150-foot-long, 120-foot-wide intake structure; (4) a 200-
foot-long, 120-foot-wide power canal; (5) a new powerhouse containing
three proposed generating units with a total installed capacity of 3.9
megawatts; (6) a new 150-foot-long tailrace; (7) a new switchyard
containing a single three-phase step-up transformer; and (8) a new
1,500-foot-long, 34.5-kilovolt overhead transmission line. The project
would have an estimated average annual generation of 15,600 megawatt-
hours.
Applicant Contact: Mr. Alan Skelly, 8425 Beechmont Avenue,
Cincinnati, OH 45255, phone (513) 375-9242.
FERC Contact: Michael Spencer, (202) 502-6093.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Comments, motions to intervene, notices of intent, and competing
applications may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and eight
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For
more information on how to submit these types of filings please go to
the Commission's Web site located at https://www.ferc.gov/filing-comments.asp. More information about this project can be viewed or
printed on the ``eLibrary'' link of Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-
13403) in the docket number field to access the document. For
assistance, call toll-free 1-866-208-3372.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E9-19611 Filed 8-14-09; 8:45 am]