Clean River Power MR-9, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 41413 [E9-19609]
Download as PDF
Federal Register / Vol. 74, No. 157 / Monday, August 17, 2009 / Notices
Purpose of
the Meeting: To provide advice on a
continuing basis to the Director, Office
of Science of the Department of Energy,
on the many complex scientific and
technical issues that arise in the
development and implementation of the
Biological and Environmental Research
Program.
SUPPLEMENTARY INFORMATION:
Tentative Agenda
• Report from the Office of Science.
• Report from the Office of Biological
and Environmental Research.
• Presentation of Workshop Reports.
• News from the Biological Systems
Science and Climate and Environmental
Sciences Divisions.
• Report on the Joint Genome
Institute Strategic Planning.
• Discussion of BERAC Planning for
Long Term Vision for the Office of
Biological and Environmental Research.
• New Business.
• Public Comment.
Public Participation: The day and a
half meeting is open to the public. If you
would like to file a written statement
with the Committee, you may do so
either before or after the meeting. If you
would like to make oral statements
regarding any of the items on the
agenda, you should contact David
Thomassen at the address or telephone
number listed above. You must make
your request for an oral statement at
least five business days before the
meeting. Reasonable provision will be
made to include the scheduled oral
statements on the agenda. The
Chairperson of the Committee will
conduct the meeting to facilitate the
orderly conduct of business. Public
comment will follow the 10-minute
rule.
Minutes: The minutes of this meeting
will be available for public review and
copying within 45 days at the BERAC
Web site: https://www.science.doe.gov/
ober/berac/Minutes.html.
Issued in Washington, DC on August 11,
2009.
Rachel M. Samuel,
Deputy Committee Management Officer.
[FR Doc. E9–19708 Filed 8–14–09; 8:45 am]
BILLING CODE 6450–01–P
Atomic Energy Act of 1954, as amended
(42 U.S.C. 2160). The Department is
providing notice of a proposed
subsequent arrangement under the
Agreement for Cooperation Between the
United States of America and the
Government of Australia Concerning
Peaceful Uses of Nuclear Energy and the
Agreement Between the United States
and the Argentine Republic Concerning
Peaceful Uses of Nuclear Energy.
This subsequent arrangement
concerns the retransfer of 10,120.40 kgs
of tritiated heavy water in 46 stainless
steel drums from the Australian Nuclear
Science and Technology Organization
(ANSTO) in Lucas Heights, Australia to
NucleoElectrica Argentina SA (NA SA)
in Buenos Aires, Argentina. The heavy
water is 99.32% pure and contains 10
grams of tritium. The material, which is
currently located at ANSTO, will be
transferred to the Atuche and Embalse
nuclear power stations and will be used
as coolant and moderator material in
these nuclear power stations operated
by NA SA. ANSTO originally obtained
the material from Atomic Energy
Canada Limited and exchanged this
material with an equivalent quantity of
U.S. obligated material.
In accordance with Section 131 of the
Atomic Energy Act of 1954, as amended,
we have determined that this
subsequent arrangement is not inimical
to the common defense and security.
This subsequent arrangement will
take effect no sooner than fifteen days
after the date of publication of this
notice.
Dated: August 10, 2009.
For the Department of Energy.
Anatoli Welihozkiy,
Director (Acting), Office of International
Regimes and Agreements.
[FR Doc. E9–19704 Filed 8–14–09; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13410–000]
mstockstill on DSKH9S0YB1PROD with NOTICES
DEPARTMENT OF ENERGY
Office of International Regimes and
Agreements; Proposed Subsequent
Arrangement
Clean River Power MR–9, LLC; Notice
of Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
August 6, 2009.
Department of Energy.
ACTION: Subsequent arrangement.
AGENCY:
SUMMARY: This notice has been issued
under the authority of Section 131 of the
VerDate Nov<24>2008
17:55 Aug 14, 2009
Jkt 217001
On March 25, 2009, Clean River
Power MR–9, LLC filed an application,
pursuant to section 4(f) of the Federal
Power Act, proposing to study the
feasibility of the Ellis Lock and Dam
Water Power Project, to be located at the
PO 00000
Frm 00048
Fmt 4703
Sfmt 4703
41413
State of Ohio’s Ellis lock and dam on
the Muskingum River in Muskingum
County, Ohio.
The proposed Ellis Lock and Dam
Project would consist of: (1) The
existing 15.3-foot-high, 340-foot-long
concrete dam; (2) the existing 352-acre
reservoir with a 1,461 acre-foot storage
capacity; (3) a new 150-foot-long, 100foot-wide intake structure; (4) a 40-footlong, 100-foot-wide power canal; (5) a
new powerhouse containing four
proposed generating units with a total
installed capacity of 2.4 megawatts; (6)
a new 200-foot-long tailrace; (7) a new
switchyard containing a single threephase step-up transformer; and (8) a
new 100-foot-long, 34.5-kilovolt
overhead transmission line. The project
would have an estimated average annual
generation of 9,700 megawatt-hours.
Applicant Contact: Mr. Alan Skelly,
8425 Beechmont Avenue, Cincinnati,
OH 45255, phone (513) 375–9242.
FERC Contact: Michael Spencer, (202)
502–6093.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at https://
www.ferc.gov/filing-comments.asp.
More information about this project can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–13410) in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3372.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E9–19609 Filed 8–14–09; 8:45 am]
BILLING CODE P
E:\FR\FM\17AUN1.SGM
17AUN1
Agencies
[Federal Register Volume 74, Number 157 (Monday, August 17, 2009)]
[Notices]
[Page 41413]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-19609]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13410-000]
Clean River Power MR-9, LLC; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
August 6, 2009.
On March 25, 2009, Clean River Power MR-9, LLC filed an
application, pursuant to section 4(f) of the Federal Power Act,
proposing to study the feasibility of the Ellis Lock and Dam Water
Power Project, to be located at the State of Ohio's Ellis lock and dam
on the Muskingum River in Muskingum County, Ohio.
The proposed Ellis Lock and Dam Project would consist of: (1) The
existing 15.3-foot-high, 340-foot-long concrete dam; (2) the existing
352-acre reservoir with a 1,461 acre-foot storage capacity; (3) a new
150-foot-long, 100-foot-wide intake structure; (4) a 40-foot-long, 100-
foot-wide power canal; (5) a new powerhouse containing four proposed
generating units with a total installed capacity of 2.4 megawatts; (6)
a new 200-foot-long tailrace; (7) a new switchyard containing a single
three-phase step-up transformer; and (8) a new 100-foot-long, 34.5-
kilovolt overhead transmission line. The project would have an
estimated average annual generation of 9,700 megawatt-hours.
Applicant Contact: Mr. Alan Skelly, 8425 Beechmont Avenue,
Cincinnati, OH 45255, phone (513) 375-9242.
FERC Contact: Michael Spencer, (202) 502-6093.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Comments, motions to intervene, notices of intent, and competing
applications may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and eight
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For
more information on how to submit these types of filings please go to
the Commission's Web site located at http:[sol][sol]www.ferc.gov/
filing-comments.asp. More information about this project can be viewed
or printed on the ``eLibrary'' link of Commission's Web site at
http:[sol][sol]www.ferc.gov/docs-filing/elibrary.asp. Enter the docket
number (P-13410) in the docket number field to access the document. For
assistance, call toll-free 1-866-208-3372.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E9-19609 Filed 8-14-09; 8:45 am]
BILLING CODE P