Clean River Power MR-3, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 41416 [E9-19603]
Download as PDF
41416
Federal Register / Vol. 74, No. 157 / Monday, August 17, 2009 / Notices
the ‘‘eLibrary’’ link of Commission’s
Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13405) in the docket number field to
access the document. For assistance,
call toll-free 1–866–208–3372.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E9–19604 Filed 8–14–09; 8:45 am]
BILLING CODE P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13404–000]
Clean River Power MR–3, LLC; Notice
of Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
mstockstill on DSKH9S0YB1PROD with NOTICES
On March 25, 2009, Clean River
Power MR–3, LLC filed an application,
pursuant to section 4(f) of the Federal
Power Act, proposing to study the
feasibility of the Beverly Lock and Dam
Water Power Project, to be located at the
State of Ohio’s Beverly lock and dam on
the Muskingum River in Washington
County, Ohio.
The proposed Beverly Lock and Dam
Project would consist of: (1) The
existing 17.0-foot-high, 535-foot-long
concrete dam; (2) the existing 490-acre
reservoir with a 3,345 acre-foot storage
capacity; (3) a new 175-foot-long, 100foot-wide intake structure; (4) a 120foot-long, 100-foot-wide power canal;
(5) a new powerhouse containing four
proposed generating units with a total
installed capacity of 4.8 megawatts; (6)
a new 250-foot-long tailrace; (7) a new
switchyard containing a single threephase step-up transformer; and (8) a
new 1,000-foot-long, 34.5-kilovolt
overhead transmission line. The project
would have an estimated average annual
generation of 19,300 megawatt-hours.
Applicant Contact: Mr. Alan Skelly,
8425 Beechmont Avenue, Cincinnati,
OH 45255, phone (513) 375–9242.
FERC Contact: Michael Spencer, (202)
502–6093.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
17:55 Aug 14, 2009
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E9–19603 Filed 8–14–09; 8:45 am]
BILLING CODE P
August 6, 2009.
VerDate Nov<24>2008
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–13404) in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3372.
Jkt 217001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13412–000]
Clean River Power MR–8, LLC; Notice
of Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
Applicant Contact: Mr. Alan Skelly,
8425 Beechmont Avenue, Cincinnati,
OH 45255, phone (513) 375–9242.
FERC Contact: Michael Spencer, (202)
502–6093.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at http:
//www.ferc.gov/filing-comments.asp.
More information about this project can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at http:
//www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–13412) in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3372.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E9–19602 Filed 8–14–09; 8:45 am]
BILLING CODE P
August 6, 2009.
On March 25, 2009, Clean River
Power MR–8, LLC filed an application,
pursuant to section 4(f) of the Federal
Power Act, proposing to study the
feasibility of the Zanesville Lock and
Dam Water Power Project, to be located
at the State of Ohio’s Zanesville lock
and dam on the Muskingum River in
Muskingum County, Ohio.
The proposed Zanesville Lock and
Dam Project would consist of: (1) The
existing 12-foot-high, 514-foot-long
concrete dam; (2) the existing 470-acre
reservoir with a 3,410 acre-foot storage
capacity; (3) a new 150-foot-long, 75foot-wide intake structure; (4) a 150foot-long, 75-foot-wide power canal; (5)
a new powerhouse containing three
proposed generating units with a total
installed capacity of 4.0 megawatts; (6)
a new 500-foot-long tailrace; (7) a new
switchyard containing a single threephase step-up transformer; and (8) a
new 100-foot-long, 34.5-kilovolt
overhead transmission line. The project
would have an estimated average annual
generation of 15,900 megawatt-hours.
PO 00000
Frm 00051
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13499–000]
Lock + TM Hydro Friends Fund X, LLC;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
August 7, 2009.
On June 2, 2009, Lock + TM Hydro
Friends Fund X, LLC, filed an
application, pursuant to section 4(f) of
the Federal Power Act, proposing to
study the feasibility of the Green
Thunder Hydroelectric Project, to be
located on the Ohio River, in Ballard
County, Kentucky and Pulaski County,
Illinois.
The proposed Green Thunder Project
would be located at the U.S. Army
Corps of Engineers (Corps) Olmstead
Lock and Dam, which is presently under
construction on the Ohio River, near
E:\FR\FM\17AUN1.SGM
17AUN1
Agencies
[Federal Register Volume 74, Number 157 (Monday, August 17, 2009)]
[Notices]
[Page 41416]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-19603]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13404-000]
Clean River Power MR-3, LLC; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
August 6, 2009.
On March 25, 2009, Clean River Power MR-3, LLC filed an
application, pursuant to section 4(f) of the Federal Power Act,
proposing to study the feasibility of the Beverly Lock and Dam Water
Power Project, to be located at the State of Ohio's Beverly lock and
dam on the Muskingum River in Washington County, Ohio.
The proposed Beverly Lock and Dam Project would consist of: (1) The
existing 17.0-foot-high, 535-foot-long concrete dam; (2) the existing
490-acre reservoir with a 3,345 acre-foot storage capacity; (3) a new
175-foot-long, 100-foot-wide intake structure; (4) a 120-foot-long,
100-foot-wide power canal; (5) a new powerhouse containing four
proposed generating units with a total installed capacity of 4.8
megawatts; (6) a new 250-foot-long tailrace; (7) a new switchyard
containing a single three-phase step-up transformer; and (8) a new
1,000-foot-long, 34.5-kilovolt overhead transmission line. The project
would have an estimated average annual generation of 19,300 megawatt-
hours.
Applicant Contact: Mr. Alan Skelly, 8425 Beechmont Avenue,
Cincinnati, OH 45255, phone (513) 375-9242.
FERC Contact: Michael Spencer, (202) 502-6093.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Comments, motions to intervene, notices of intent, and competing
applications may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and eight
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For
more information on how to submit these types of filings please go to
the Commission's Web site located at https://www.ferc.gov/filing-comments.asp. More information about this project can be viewed or
printed on the ``eLibrary'' link of Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-
13404) in the docket number field to access the document. For
assistance, call toll-free 1-866-208-3372.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E9-19603 Filed 8-14-09; 8:45 am]
BILLING CODE P