BJ Energy LLC, Franklin Power LLC, GLE Trading LLC, Ocean Power LLC, Pillar Fund LLC, Complainants, v. PJM Interconnection, L.L.C., Respondent; Notice of Filing, 40180-40181 [E9-19128]
Download as PDF
40180
Federal Register / Vol. 74, No. 153 / Tuesday, August 11, 2009 / Notices
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible online at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on August 20, 2009.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E9–19131 Filed 8–10–09; 8:45 am]
A copy of the DEA is on file with the
Commission and is available for public
inspection. The DEA may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number (P–2403, P–2312, or P–2721)
excluding the last three digits in the
docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3372, or for TTY,
(202) 502–8659.
Any comments should be filed by
September 3, 2009, and should be
addressed to the Secretary, Federal
Energy Regulatory Commission, 888
First Street, NE., Room 1–A,
Washington, DC 20426. Please reference
the project name and project number
(P–2232) on all comments. Comments
may be filed electronically via Internet
in lieu of paper. The Commission
strongly encourages electronic filings.
See 18 CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site under the ‘‘eFiling’’ link. For further
information, contact Christopher Yeakel
at (202) 502–8132.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E9–19135 Filed 8–10–09; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all the parties in this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov/.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov/, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on August 21, 2009.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
August 4, 2009.
sroberts on DSKD5P82C1PROD with NOTICES
August 4, 2009.
In accordance with the National
Environmental Policy Act of 1969 and
the Federal Energy Regulatory
Commission’s regulations, 18 CFR Part
380 (Order No. 486, 52 FR 47879) the
Office of Energy Projects has reviewed
an application filed on November 7,
2008, to surrender the project licenses
for the Veazie, Great Works, and
Howland Hydroelectric Projects, located
on the Penobscot and Piscataquis Rivers
in Penobscot County, Maine. A draft
environmental assessment (DEA) has
been prepared as part of staff’s review.
The DEA finds that approval of the
application would not constitute a
major federal action significantly
affecting the quality of the human
environment.
Jkt 217001
DEPARTMENT OF ENERGY
PJM Interconnection, L.L.C.; Notice of
Filing
Penobscot River Restoration Trust;
Notice of Availability of Draft
Environmental Assessment
20:51 Aug 10, 2009
BILLING CODE 6717–01–P
[Docket No. EL08–47–004]
[Project Nos. 2403–056; 2312–019; 2721–
020]
VerDate Nov<24>2008
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E9–19129 Filed 8–10–09; 8:45 am]
Take notice that on July 31, 2009, PJM
Interconnection, L.L.C. filed revised
sheets to Schedule 1 of its Amended
and Restated Operating Agreement, the
parallel provisions of Attachment K—
Appendix of the PJM Open Access
Transmission Tariff, and Schedule 2 of
the Operating Agreement in compliance
with the Commission’s February 19,
2009 Initial Order on Market Power
Mitigation Provisions and Establishing
Procedures, PJM Interconnection, L.L.C.,
126 FERC 61,145 (2009).
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
Federal Energy Regulatory
Commission
[Docket No. EL08–49–003]
BJ Energy LLC, Franklin Power LLC,
GLE Trading LLC, Ocean Power LLC,
Pillar Fund LLC, Complainants, v. PJM
Interconnection, L.L.C., Respondent;
Notice of Filing
August 4, 2009.
Take notice that on July 31, 2009, PJM
Interconnection, L.L.C. filed a refund
report in compliance with the
Commission’s April 2, 2009 Order, BJ
Energy LLC v. PJM Interconnection,
L.L.C., 127 FERC 61,006 (2009).
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
E:\FR\FM\11AUN1.SGM
11AUN1
Federal Register / Vol. 74, No. 153 / Tuesday, August 11, 2009 / Notices
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all the parties in this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on August 21, 2009.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E9–19128 Filed 8–10–09; 8:45 am]
BILLING CODE 6717–01–P
Federal Energy Regulatory
Commission
[Docket No. ES09–31–001]
Entergy Texas, Inc.; Notice of Filing
sroberts on DSKD5P82C1PROD with NOTICES
August 4, 2009.
Take notice that on July 28, 2009,
Entergy Texas, Inc. filed a supplement
providing additional explanation to its
April 30, 2009 application.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
20:51 Aug 10, 2009
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E9–19130 Filed 8–10–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER02–2001–013, Docket No.
ER08–19–000, Docket No. ER04–197–000,
Docket No. ER06–792–000, Docket No.
ER04–848–000, Docket No. ER00–167–000,
Docket No. ER06–298–000]
DEPARTMENT OF ENERGY
VerDate Nov<24>2008
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Applicant and
all the parties in this proceeding.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov/.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on August 7, 2009.
Jkt 217001
Electric Quarterly Reports, Energy
Algorithms, LLC, Forest Energy
Partners, LLC, Norge Power Marketing
Corporation, Ohms Energy Company,
LLC, Strategic Energy Management
Corp., The Energy Group of America
Inc.; Order on Intent To Revoke
Market-Based Rate Authority
Issued August 5, 2009.
Before Commissioners: Jon Wellinghoff,
Chairman; Suedeen G. Kelly, Marc Spitzer,
and Philip D. Moeller.
1. Section 205 of the Federal Power
Act (FPA), 16 U.S.C. 824d (2006), and
18 CFR Part 35 (2009), require, among
other things, that all rates, terms, and
conditions of jurisdictional services be
filed with the Commission. In Order No.
2001, the Commission revised its public
utility filing requirements and
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
40181
established a requirement for public
utilities, including power marketers, to
file Electric Quarterly Reports
summarizing the contractual terms and
conditions in their agreements for all
jurisdictional services (including
market-based power sales, cost-based
power sales, and transmission service)
and providing transaction information
(including rates) for short-term and
long-term power sales during the most
recent calendar quarter.1
2. Commission staff’s review of the
Electric Quarterly Report submittals
indicates that six utilities with authority
to sell electric power at market-based
rates have failed to file their Electric
Quarterly Reports. This order notifies
these public utilities that their marketbased rate authorizations will be
revoked unless they comply with the
Commission’s requirements within 15
days of the date of issuance of this
order.
3. In Order No. 2001, the Commission
stated that,
[i]f a public utility fails to file a[n] Electric
Quarterly Report (without an appropriate
request for extension), or fails to report an
agreement in a report, that public utility may
forfeit its market-based rate authority and
may be required to file a new application for
market-based rate authority if it wishes to
resume making sales at market-based rates.2
4. The Commission further stated that,
[o]nce this rule becomes effective, the
requirement to comply with this rule will
supersede the conditions in public utilities’
market-based rate authorizations, and failure
to comply with the requirements of this rule
will subject public utilities to the same
consequences they would face for not
satisfying the conditions in their rate
authorizations, including possible revocation
of their authority to make wholesale power
sales at market-based rates.3
5. Pursuant to these requirements, the
Commission has revoked the marketbased rate tariffs of several market-based
rate sellers that failed to submit their
Electric Quarterly Reports.4
6. As noted above, Commission staff’s
review of the Electric Quarterly Report
submittals identified six public utilities
with authority to sell power at marketbased rates that failed to file Electric
1 Revised Public Utility Filing Requirements,
Order No. 2001, FERC Stats. & Regs. ¶ 31,127, reh’g
denied, Order No. 2001–A, 100 FERC ¶ 61,074,
reconsideration and clarification denied, Order No.
2001–B, 100 FERC ¶ 61,342, order directing filings,
Order No. 2001–C, 101 FERC ¶ 61,314 (2002) order
directing filings, Order No. 2001–D, 102 FERC ¶
61,334 (2003).
2 Order No. 2001 at P 222.
3 Id. P 223.
4 See, e.g., Electric Quarterly Reports, 73 FR
31,460 (June 2, 2008), Notice of Revocation of
Market-Based Rate Tariff; Electric Quarterly
Reports, 115 FERC ¶ 61,073 (2006), Electric
Quarterly Reports, 114 FERC ¶ 61,171 (2006).
E:\FR\FM\11AUN1.SGM
11AUN1
Agencies
[Federal Register Volume 74, Number 153 (Tuesday, August 11, 2009)]
[Notices]
[Pages 40180-40181]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-19128]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL08-49-003]
BJ Energy LLC, Franklin Power LLC, GLE Trading LLC, Ocean Power
LLC, Pillar Fund LLC, Complainants, v. PJM Interconnection, L.L.C.,
Respondent; Notice of Filing
August 4, 2009.
Take notice that on July 31, 2009, PJM Interconnection, L.L.C.
filed a refund report in compliance with the Commission's April 2, 2009
Order, BJ Energy LLC v. PJM Interconnection, L.L.C., 127 FERC 61,006
(2009).
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will
[[Page 40181]]
not serve to make protestants parties to the proceeding. Any person
wishing to become a party must file a notice of intervention or motion
to intervene, as appropriate. Such notices, motions, or protests must
be filed on or before the comment date. Anyone filing a motion to
intervene or protest must serve a copy of that document on the
Applicant and all the parties in this proceeding.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5 p.m. Eastern Time on August 21, 2009.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E9-19128 Filed 8-10-09; 8:45 am]