Environmental Impacts Statements; Notice of Availability, 39697-39698 [E9-18982]
Download as PDF
pwalker on DSK8KYBLC1PROD with NOTICES
Federal Register / Vol. 74, No. 151 / Friday, August 7, 2009 / Notices
is no such delegated authority, the
reports are sent directly to the EPA
regional office.
Burden Statement: The annual public
reporting and recordkeeping burden for
this collection of information is
estimated to average 160 hours per
response. Burden means the total time,
effort, or financial resources expended
by persons to generate, maintain, retain,
or disclose and provide information to
or for a Federal agency. This includes
the time needed to review instructions,
develop, acquire, install, and utilize
technology and systems for the purposes
of collecting, validating, and verifying
information, processing and
maintaining information, and disclosing
and providing information. All existing
ways will have to adjust to comply with
any previously applicable instructions
and requirements that have
subsequently changed; train personnel
to be able to respond to a collection of
information; search data sources;
complete and review the collection of
information; and transmit or otherwise
disclose the information.
Respondents/Affected Entities:
Mercury.
Estimated Number of Respondents:
107.
Frequency of Response: Initially,
annually and semiannually.
Estimated Total Annual Hour Burden:
20,490.
Estimated Total Annual Cost:
$1,735,421 in labor costs exclusively.
There are no capital/startup or O&M
costs associated with this ICR.
Changes in the Estimates: There is no
change in the labor cost in this ICR
compared to the previous ICR. This is
due to two considerations: (1) The
regulations have not changed over the
past three years and are not anticipated
to change over the next three years; and
(2) the growth rate for the industry is
very low, negative or nonexistent, so
there is no significant change in the
overall burden.
Since there are no changes in the
regulatory requirements and there is no
significant industry growth, the labor
hours and cost figures in the previous
ICR are used in this ICR, and there is no
change in burden to industry.
Dated: July 31, 2009.
John Moses,
Director, Collection Strategies Division.
[FR Doc. E9–18965 Filed 8–6–09; 8:45 am]
BILLING CODE 6560–50–P
VerDate Nov<24>2008
17:09 Aug 06, 2009
Jkt 217001
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8596–2]
Environmental Impact Statements and
Regulations; Availability of EPA
Comments
Availability of EPA comments
prepared pursuant to the Environmental
Review Process (ERP), under section
309 of the Clean Air Act and Section
102(2)(c) of the National Environmental
Policy Act as amended. Requests for
copies of EPA comments can be directed
to the Office of Federal Activities at
202–564–7146.
An explanation of the ratings assigned
to draft environmental impact
statements (EISs) was published in FR
dated July 17, 2009 (74 FR 34754).
Draft EISs
EIS No. 20090176, ERP No. D–FHW–
L40237–WA, WA–502 Corridor
Widening Project, Proposes
Improvements to Five Miles of WA–
502 (NE–219th Street) between NE
15th Avenue and NE 102nd Avenue,
Funding, Clark County, WA.
Summary: EPA expressed
environmental concerns about wetland
mitigation, ecological connectivity
issues and stormwater impacts. EPA
requested additional analysis of indirect
and cumulative effects of travel and
land use change, mobile source air
toxics, and invasive species. Rating EC2.
EIS No. 20090179, ERP No. D–AFS–
K65367–CA, Klamath National Forest
Motorized Route Designation,
Motorized Travel Management,
(Formerly Motorized Route
Designation), Implementation,
Siskiyou County, CA.
Summary: EPA expressed
environmental concerns about water
resource impacts, and asbestos impacts,
and requested additional information on
monitoring, enforcement commitments,
effects of climate change, and future
planning for specific designated routes.
Rating EC2.
Final EISs
EIS No. 20090213, ERP No. F–USN–
E11068–00, Undersea Warfare
Training Range Project, Installation
and Operation, Preferred Site
Jacksonville Operating Area, FL and
Alternative Sites (within the
Charleston, SC; Cherry Point, NC; and
VACAPES Operating Areas, VA.
Summary: EPA expressed
environmental concerns about impacts
to the marine environment from the
deposition of expended training
materials.
PO 00000
Frm 00093
Fmt 4703
Sfmt 4703
39697
EIS No. 20090214, ERP No. F–CGD–
A03086–00, PROGRAMMATIC—
Vessel and Facility Response Plans for
Oil: 2003 Removal Equipment
Requirements and Alternative
Technology Revisions, To Increase the
Oil Removal Capability, U.S.
Exclusive Economic Zone (EEZ),
United States, Alaska, Guam, Puerto
Pico and other U.S. Territories.
Summary: EPA continues to have
environmental concerns about the
potential environmental impacts from
dispersant application.
EIS No. 20090201, ERP No. FS–AFS–
K65281–CA, Brown Project, Revised
Proposal to Improve Forest Health by
Reducing Overcrowded Forest Stand
Conditions, Trinity River
Management Unit, Shasta-Trinity
National Forest, Weaverville Ranger
District, Trinity County, CA
Summary: No formal comment letter
was sent to preparing agency.
Dated: August 4, 2009.
Robert W. Hargrove,
Director, NEPA Compliance Division Office
of Federal Activities.
[FR Doc. E9–18967 Filed 8–6–09; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8596–1]
Environmental Impacts Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–1399 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 07/27/2009 Through 07/31/2009
Pursuant to 40 CFR 1506.9.
EIS No. 20090265, Draft EIS, AFS, ID,
Clearwater National Forest Travel
Planning Project, Proposes to Manage
Motorized and Mechanized Travel
within the 1,827.380–Acre,
Clearwater National Forest, Idaho,
Clearwater, Latah and Shoshone
Counties, ID, Comment Period Ends:
09/21/2009, Contact: Doug Gober
208–476–4541.
EIS No. 20090266, Draft EIS, IBR, CA,
Madera Irrigation District Water
Supply Enhancement Project,
Constructing and Operating a Water
Bank on the Madera Property, Madera
County, CA, Comment Period Ends:
09/21/2009, Contact: Patti Clinton
559–487–5127.
EIS No. 20090267, Draft EIS, AFS, MT,
Bitteroot National Forest Travel
E:\FR\FM\07AUN1.SGM
07AUN1
pwalker on DSK8KYBLC1PROD with NOTICES
39698
Federal Register / Vol. 74, No. 151 / Friday, August 7, 2009 / Notices
Management Planning, To Address
Conflicts between Motorized and
Non-Motorized Users, Ravalli County,
MT, Comment Period Ends: 09/21/
2009, Contact: Dan Ritter 406–777–
5461.
EIS No. 20090268, Final EIS, BLM, ID,
Three Rivers Stone Quarry Expansion
Project, Proposing to Expand the
Quarry Operation up to an Additional
73 Acres to Increase Mine Production
of Flaystone, Custer County, ID, Wait
Period Ends: 09/08/2009, Contact:
Charles Horsburgh 208–524–1569.
EIS No. 20090269, Final EIS, TVA, 00,
Mountain Reservoirs Land
Management Plan, Implementation,
Proposes to Develop a Plan for
Managing Nine Mountain Reservoirs:
Chatuge, Hiwassee, Blue Ridge,
Nottely, Ocoees 1, 2, and 3,
Apalachia, and Fontana Reservoirs,
Fannin, Towns, and Union Counties,
GA; Cherokee, Clay, Graham, and
Swain Counties, North Carolina; and
Polk County, TN, Wait Period Ends:
09/08/2009, Contact: James F.
Williamson, Jr. 865–632–6418.
EIS No. 20090270, Draft EIS, NRC, 00,
GENERIC—License Renewal of
Nuclear Plants (NUREG–1437),
Volumes 1 and 2, Revision 1, To
Improve the Efficiency of the License
Renewal Process, Implementation,,
Comment Period Ends: 10/13/2009,
Contact: Jennifer Davis 1–800–368–
5642 Ext. 3835.
EIS No. 20090271, Final EIS, GSA, CA,
San Ysidro Land Port of Entry (LPOE)
Improvement Project, Propose the
Configuration and Expansion of the
Existing (LPOE), San Ysidro, CA, Wait
Period Ends: 09/08/2009, Contact:
Osmahna A. Kadri 415–522–3617.
EIS No. 20090272, Draft EIS, UAF, 00,
Modification of the Condor 1 and
Condor 2 Military Operation Areas,
104th Fighter Wing of the
Massachusetts Air National Guard
Base (ANG) Proposes to Combine the
Condor 1 and Condor 2 MOA, ME and
NH, Comment Period Ends: 09/21/
2009, Contact: Jay Nash 703–614–
0346.
EIS No. 20090273, Draft EIS, FSA, 00,
PROGRAMMATIC—Biomass Crop
Assistance Program (BCAP), To
Establish and Administer the Program
Areas Program Component of BCAP
as mandated in Title IX of the 2008
Farm Bill in the United States,
Comment Period Ends: 09/21/2009,
Contact: Matthew T. Ponish 202–720–
6853.
EIS No. 20090274, Final EIS, FHW, CA,
Marin-Sonoma Narrows (MSN) HOV
Widening Project, Propose to Relieve
Recurrent Congestion along US 101
south of the Route 37 Interchange in
VerDate Nov<24>2008
17:09 Aug 06, 2009
Jkt 217001
the City of Novato (Marin County) and
ends north of the Corona Road
Overcrossing in the City of Petaluma
(Sonoma County), Marin and Sonoma
Counties, CA, Wait Period Ends: 09/
08/2009, Contact: Lanh T. Phan, P.E.
916–498–5046.
Amended Notices
EIS No. 20090190, Draft EIS, AFS, OR,
Wallowa-Whitman National Forest
Travel Management Plan, Designate
Roads Trails and Areas for Motor
Vehicle User, Baker, Grant, Umatilla,
Union and Wallowa Counties, OR,
Comment Period Ends: 09/17/2009,
Contact: Cindy Whitlock 541–962—
8501. Revision to FR Notice Published
06/19/2009: Extending Comment
Period from 08/18/2009 to 09/17/
2009.
Dated: August 4, 2009.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. E9–18982 Filed 8–6–09; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–8939–9]
Public Comment Requested on the
Draft Environmental Impact Statement
for the Proposed Site Designation of
an Ocean Dredged Material Disposal
Site Offshore of Guam
AGENCY: Environmental Protection
Agency (EPA).
ACTION: Notice.
SUMMARY: Notice of Availability and
request for public comment on a draft
Environmental Impact Statement (EIS)
to designate a permanent ocean dredged
material disposal site (ODMDS) off Apra
Harbor, Guam. EPA has the authority to
designate ODMDS under Section 102 of
the Marine Protection, Research and
Sanctuaries Act (MPRSA) of 1972 (33
U.S.C. 1401 et seq.). The U.S.
Department of Navy, as a cooperating
agency for this action, received
Congressional appropriations to fund
this site designation, and managed
contracts for field studies identified by
EPA for the preparation of the draft EIS.
DATES: Public comments on this draft
EIS evaluation will be accepted until
October 6, 2009.
ADDRESSES: Submit comments to: Mr.
Allan Ota, U.S. Environmental
Protection Agency, Region 9, Dredging
and Sediment Management Team
(WTR–8), 75 Hawthorne Street, San
Francisco, California 94105–3901,
PO 00000
Frm 00094
Fmt 4703
Sfmt 4703
Telephone: (415) 972–3476 or Fax: (415)
947–3537, or E-mail: ota.allan@epa.gov.
FOR FURTHER INFORMATION CONTACT: Mr.
Allan Ota, U.S. Environmental
Protection Agency, Region 9, Dredging
and Sediment Management Team
(WTR–8), 75 Hawthorne Street, San
Francisco, California 94105–3901,
Telephone: (415) 972–3476 or Fax: (415)
947–3537, or E-mail: ota.allan@epa.gov.
SUPPLEMENTARY INFORMATION: EPA
requests public comments and intends
to conduct a public meeting in Guam to
collect comments on the draft EIS, titled
‘‘Designation of an Ocean Dredged
Material Disposal Site Offshore of
Guam’’. Copies of this draft EIS may be
viewed at the following locations:
1. Guam EPA’s Main Office, 17–3304
Mariner Avenue, Tiyan, Guam 96913.
2. Nieves M. Flores Memorial Public
Library, 254 Martyr Street, Hagatna,
Guam 96910.
3. Barrigada Public Library, 177 San
Roque Drive, Barrigada, Guam 96913.
4. Dededo Public Library, 283 West
Santa Barbara Avenue, Dededo, Guam
96929.
5. Maria R. Aguigui Memorial Library
(Agat Public Library), 376 Cruz Avenue,
Guam 96915.
6. Rosa Aguigui Reyes Memorial
Library (Merizo Public Library), 376
Cruz Avenue, Merizo, Guam 96915.
7. Yona Public Library, 265 Sister
Mary Eucharita Drive, Yona, Guam
96915.
8. U.S. Environmental Protection
Agency (EPA) Library, 75 Hawthorne
Street, 13th Floor, San Francisco, CA
94105.
9. U.S. EPA Web site: https://
www.epa.gov/region9/.
10. U.S. Army Corps of Engineers’
Web site: https://
www.poh.usace.army.mil.
Background: Dredging is essential for
maintaining safe navigation at port and
naval facilities in Apra Harbor and other
locations around Guam. Not all dredged
materials are suitable for beneficial reuse (e.g., construction materials, landfill
cover), and not all suitable materials can
be used or can be stockpiled for future
use given costs, logistical constraints,
and capacity of existing land disposal
sites. Therefore, there is a need to
designate a permanent ODMDS offshore
of Guam. No actual disposal operations
are authorized by this action; and
disposal can only take place after a
Federal Corps permit is secured. Before
ocean disposal may take place, dredging
projects must demonstrate a need for
ocean disposal and the proposed
dredged material must be suitable (nontoxic) according to USEPA ocean
dumping criteria. Alternatives to ocean
E:\FR\FM\07AUN1.SGM
07AUN1
Agencies
[Federal Register Volume 74, Number 151 (Friday, August 7, 2009)]
[Notices]
[Pages 39697-39698]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-18982]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-8596-1]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-1399 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 07/27/2009 Through 07/31/2009
Pursuant to 40 CFR 1506.9.
EIS No. 20090265, Draft EIS, AFS, ID, Clearwater National Forest Travel
Planning Project, Proposes to Manage Motorized and Mechanized Travel
within the 1,827.380-Acre, Clearwater National Forest, Idaho,
Clearwater, Latah and Shoshone Counties, ID, Comment Period Ends: 09/
21/2009, Contact: Doug Gober 208-476-4541.
EIS No. 20090266, Draft EIS, IBR, CA, Madera Irrigation District Water
Supply Enhancement Project, Constructing and Operating a Water Bank on
the Madera Property, Madera County, CA, Comment Period Ends: 09/21/
2009, Contact: Patti Clinton 559-487-5127.
EIS No. 20090267, Draft EIS, AFS, MT, Bitteroot National Forest Travel
[[Page 39698]]
Management Planning, To Address Conflicts between Motorized and Non-
Motorized Users, Ravalli County, MT, Comment Period Ends: 09/21/2009,
Contact: Dan Ritter 406-777-5461.
EIS No. 20090268, Final EIS, BLM, ID, Three Rivers Stone Quarry
Expansion Project, Proposing to Expand the Quarry Operation up to an
Additional 73 Acres to Increase Mine Production of Flaystone, Custer
County, ID, Wait Period Ends: 09/08/2009, Contact: Charles Horsburgh
208-524-1569.
EIS No. 20090269, Final EIS, TVA, 00, Mountain Reservoirs Land
Management Plan, Implementation, Proposes to Develop a Plan for
Managing Nine Mountain Reservoirs: Chatuge, Hiwassee, Blue Ridge,
Nottely, Ocoees 1, 2, and 3, Apalachia, and Fontana Reservoirs, Fannin,
Towns, and Union Counties, GA; Cherokee, Clay, Graham, and Swain
Counties, North Carolina; and Polk County, TN, Wait Period Ends: 09/08/
2009, Contact: James F. Williamson, Jr. 865-632-6418.
EIS No. 20090270, Draft EIS, NRC, 00, GENERIC--License Renewal of
Nuclear Plants (NUREG-1437), Volumes 1 and 2, Revision 1, To Improve
the Efficiency of the License Renewal Process, Implementation,, Comment
Period Ends: 10/13/2009, Contact: Jennifer Davis 1-800-368-5642 Ext.
3835.
EIS No. 20090271, Final EIS, GSA, CA, San Ysidro Land Port of Entry
(LPOE) Improvement Project, Propose the Configuration and Expansion of
the Existing (LPOE), San Ysidro, CA, Wait Period Ends: 09/08/2009,
Contact: Osmahna A. Kadri 415-522-3617.
EIS No. 20090272, Draft EIS, UAF, 00, Modification of the Condor 1 and
Condor 2 Military Operation Areas, 104th Fighter Wing of the
Massachusetts Air National Guard Base (ANG) Proposes to Combine the
Condor 1 and Condor 2 MOA, ME and NH, Comment Period Ends: 09/21/2009,
Contact: Jay Nash 703-614-0346.
EIS No. 20090273, Draft EIS, FSA, 00, PROGRAMMATIC--Biomass Crop
Assistance Program (BCAP), To Establish and Administer the Program
Areas Program Component of BCAP as mandated in Title IX of the 2008
Farm Bill in the United States, Comment Period Ends: 09/21/2009,
Contact: Matthew T. Ponish 202-720-6853.
EIS No. 20090274, Final EIS, FHW, CA, Marin-Sonoma Narrows (MSN) HOV
Widening Project, Propose to Relieve Recurrent Congestion along US 101
south of the Route 37 Interchange in the City of Novato (Marin County)
and ends north of the Corona Road Overcrossing in the City of Petaluma
(Sonoma County), Marin and Sonoma Counties, CA, Wait Period Ends: 09/
08/2009, Contact: Lanh T. Phan, P.E. 916-498-5046.
Amended Notices
EIS No. 20090190, Draft EIS, AFS, OR, Wallowa-Whitman National Forest
Travel Management Plan, Designate Roads Trails and Areas for Motor
Vehicle User, Baker, Grant, Umatilla, Union and Wallowa Counties, OR,
Comment Period Ends: 09/17/2009, Contact: Cindy Whitlock 541-962--8501.
Revision to FR Notice Published 06/19/2009: Extending Comment Period
from 08/18/2009 to 09/17/2009.
Dated: August 4, 2009.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E9-18982 Filed 8-6-09; 8:45 am]
BILLING CODE 6560-50-P