Jordan Hydroelectric Limited Partnership; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests, 39685 [E9-18917]
Download as PDF
Federal Register / Vol. 74, No. 151 / Friday, August 7, 2009 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 12740–003]
Jordan Hydroelectric Limited
Partnership; Notice of Application
Tendered for Filing With the
Commission and Soliciting Additional
Study Requests
pwalker on DSK8KYBLC1PROD with NOTICES
July 31, 2009.
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Major Original
License.
b. Project No.: P–12740–003.
c. Date filed: July 13, 2009.
d. Applicant: Jordan Hydroelectric
Limited Partnership.
e. Name of Project: Flannagan
Hydroelectric Project.
f. Location: On the Pound River, near
the Town of Clintwood, in Dickenson
County, Virginia. The project would
occupy federal land managed by the
U.S. Army Corps of Engineers (Corps).
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. James B.
Price, W.V. Hydro, Inc., P.O. Box 903,
Gatlinburg, TN 37738, (865) 436–0402.
i. FERC Contact: John Ramer, (202)
502–8969 or john.ramer@ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: September 11, 2009.
All documents (original and eight
copies) should be filed with: Kimberly
VerDate Nov<24>2008
17:09 Aug 06, 2009
Jkt 217001
D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
Additional study requests and
requests for cooperating agency status
may be filed electronically via the
Internet in lieu of paper. The
Commission strongly encourages
electronic filings. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site (https://
www.ferc.gov/docs-filing/ferconline.asp)
under the ‘‘efiling’’ link. For a simpler
method of submitting text only
comments, click on ‘‘Quick Comment.’’
m. The application is not ready for
environmental analysis at this time.
n. The proposed project would utilize
the existing U.S. Army Corps of
Engineers’ Flannagan dam, intake tower,
outlet works, and 1,145-acre reservoir
and would consist of the following
proposed facilities: (1) Two new turbine
generator units located within the
Corps’ existing intake tower having a
total installed capacity of 3 megawatts;
(2) a new control booth on the intake
tower; (3) a new substation near the
Corps’ existing service bridge; (4) new
transmission leads connecting the
generator units to Appalachian Power
Company’s existing transmission line;
and (5) appurtenant facilities. The
average annual generation is estimated
to be 9.5 gigawatt-hours.
o. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support at
FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY,
(202) 502–8659. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
e-mail of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. With this notice, we are initiating
consultation with the Virginia State
Historic Preservation Officer (SHPO), as
required by § 106, National Historic
Preservation Act, and the regulations of
the Advisory Council on Historic
Preservation, 36, CFR, at 800.4.
q. Procedural schedule: The
application will be processed according
to the following Hydro Licensing
Schedule. Revisions to the schedule will
be made as appropriate.
PO 00000
Frm 00081
Fmt 4703
Sfmt 4703
39685
Issue Deficiency or Acceptance letter:
September 2009
Issue Scoping Document: November
2009
Notice of application is ready for
environmental analysis: February
2010
Notice of the availability of the EA: July
2010
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E9–18917 Filed 8–6–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
July 31, 2009.
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC09–98–000.
Applicants: Barton Windpower LLC,
Barton Windpower II LLC.
Description: Application for
Authorization of Transaction Under
Section 203 of the Federal Power Act.
Filed Date: 07/31/2009.
Accession Number: 20090731–5032.
Comment Date: 5 p.m. Eastern Time
on Friday, August 21, 2009.
Docket Numbers: EC09–99–000.
Applicants: MidAmerican Energy
Company.
Description: Application of
MidAmerican Energy Company for
approval of acquisition of additional
interest in transmission line pursuant to
Section 203 of the Federal Power Act.
Filed Date: 07/30/2009.
Accession Number: 20090730–5122.
Comment Date: 5 p.m. Eastern Time
on Thursday, August 20, 2009.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER98–4109–004;
ER01–1178–005; ER03–175–008; ER03–
394–006; ER03–427–006; ER07–265–
010; ER08–100–009; ER99–3426–010.
Applicants: El Dorado Energy, LLC;
Sempra Generation; Termoelectrica
U.S., LLC; Elk Hills Power, LLC;
Mesquite Power LLC; Sempra Energy
Solutions LLC; Sempra Energy Trading
LLC; San Diego Gas & Electric Company.
Description: Notice of Non-Material
Change in Status—Sites for New
Generation Capacity Development.
Filed Date: 07/31/2009.
Accession Number: 20090731–5051.
Comment Date: 5 p.m. Eastern Time
on Friday, August 21, 2009.
E:\FR\FM\07AUN1.SGM
07AUN1
Agencies
[Federal Register Volume 74, Number 151 (Friday, August 7, 2009)]
[Notices]
[Page 39685]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-18917]
[[Page 39685]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 12740-003]
Jordan Hydroelectric Limited Partnership; Notice of Application
Tendered for Filing With the Commission and Soliciting Additional Study
Requests
July 31, 2009.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Major Original License.
b. Project No.: P-12740-003.
c. Date filed: July 13, 2009.
d. Applicant: Jordan Hydroelectric Limited Partnership.
e. Name of Project: Flannagan Hydroelectric Project.
f. Location: On the Pound River, near the Town of Clintwood, in
Dickenson County, Virginia. The project would occupy federal land
managed by the U.S. Army Corps of Engineers (Corps).
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mr. James B. Price, W.V. Hydro, Inc., P.O.
Box 903, Gatlinburg, TN 37738, (865) 436-0402.
i. FERC Contact: John Ramer, (202) 502-8969 or john.ramer@ferc.gov.
j. Cooperating agencies: Federal, state, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in item l below. Cooperating agencies should note
the Commission's policy that agencies that cooperate in the preparation
of the environmental document cannot also intervene. See, 94 FERC ]
61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's
regulations, if any resource agency, Indian Tribe, or person believes
that an additional scientific study should be conducted in order to
form an adequate factual basis for a complete analysis of the
application on its merit, the resource agency, Indian Tribe, or person
must file a request for a study with the Commission not later than 60
days from the date of filing of the application, and serve a copy of
the request on the applicant.
l. Deadline for filing additional study requests and requests for
cooperating agency status: September 11, 2009.
All documents (original and eight copies) should be filed with:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
Additional study requests and requests for cooperating agency
status may be filed electronically via the Internet in lieu of paper.
The Commission strongly encourages electronic filings. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
(https://www.ferc.gov/docs-filing/ferconline.asp) under the ``efiling''
link. For a simpler method of submitting text only comments, click on
``Quick Comment.''
m. The application is not ready for environmental analysis at this
time.
n. The proposed project would utilize the existing U.S. Army Corps
of Engineers' Flannagan dam, intake tower, outlet works, and 1,145-acre
reservoir and would consist of the following proposed facilities: (1)
Two new turbine generator units located within the Corps' existing
intake tower having a total installed capacity of 3 megawatts; (2) a
new control booth on the intake tower; (3) a new substation near the
Corps' existing service bridge; (4) new transmission leads connecting
the generator units to Appalachian Power Company's existing
transmission line; and (5) appurtenant facilities. The average annual
generation is estimated to be 9.5 gigawatt-hours.
o. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-
866-208-3676, or for TTY, (202) 502-8659. A copy is also available for
inspection and reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
p. With this notice, we are initiating consultation with the
Virginia State Historic Preservation Officer (SHPO), as required by
Sec. 106, National Historic Preservation Act, and the regulations of
the Advisory Council on Historic Preservation, 36, CFR, at 800.4.
q. Procedural schedule: The application will be processed according
to the following Hydro Licensing Schedule. Revisions to the schedule
will be made as appropriate.
Issue Deficiency or Acceptance letter: September 2009
Issue Scoping Document: November 2009
Notice of application is ready for environmental analysis: February
2010
Notice of the availability of the EA: July 2010
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E9-18917 Filed 8-6-09; 8:45 am]
BILLING CODE 6717-01-P