McGinnis, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 39069 [E9-18635]

Download as PDF Federal Register / Vol. 74, No. 149 / Wednesday, August 5, 2009 / Notices o. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. E9–18634 Filed 8–4–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13448–000] McGinnis, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications srobinson on DSKHWCL6B1PROD with NOTICES July 29, 2009. On April 29, 2009, McGinnis, Inc. filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Marmet Hydrokinetic Project, to be located on the Kanawha River, in Kanawha County, West Virginia. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed Meldahl Hydrokinetic Project consists of: (1) 10 proposed 35 kilowatt turbine-generator units having a total installed capacity of 0.35 megawatts; (2) a 300-feet-long, 13.2 kilovolt transmission line; and (3) appurtenant facilities. The proposed Winfield Hydrokinetic Project would have an average annual generation of 1.533 gigawatt-hours. Applicant Contact: Bruce D. McGinnis, Sr., CEO, McGinnis, Inc., 502 Second Street Ext., South Point, OH 45680; phone: (740) 377–4391. FERC Contact: Kim Carter, 202–502– 6486. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. If unable to be filed VerDate Nov<24>2008 18:54 Aug 04, 2009 Jkt 217001 electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https://www.ferc.gov/filingcomments.asp. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–13448) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3372. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. E9–18635 Filed 8–4–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13446–000] McGinnis, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications July 29, 2009. On April 29, 2009, McGinnis, Inc. filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Meldahl Hydrokinetic Project, to be located on the Ohio River, in Clermont County, Ohio and Bracken County, Kentucky. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed Meldahl Hydrokinetic Project consists of: (1) 10 proposed 35 kilowatt turbine-generator units having a total installed capacity of 0.35 megawatts; (2) a 2,000-feet-long, 13.2 kilovolt transmission line; and (3) appurtenant facilities. The proposed Winfield Hydrokinetic Project would have an average annual generation of 1.533 gigawatt-hours. Applicant Contact: Bruce D. McGinnis, Sr., CEO, McGinnis, Inc., 502 PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 39069 Second Street Ext., South Point, OH 45680; phone: (740) 377–4391. FERC Contact: Kim Carter, 202–502– 6486. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https://www.ferc.gov/filingcomments.asp. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–13446) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3372. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. E9–18636 Filed 8–4–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13443–000] McGinnis, Inc.; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications July 29, 2009. On April 29, 2009, McGinnis, Inc. filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Winfield Hydrokinetic Project, to be located on the Kanawha River, in Putnam County, West Virginia. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land E:\FR\FM\05AUN1.SGM 05AUN1

Agencies

[Federal Register Volume 74, Number 149 (Wednesday, August 5, 2009)]
[Notices]
[Page 39069]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-18635]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13448-000]


McGinnis, Inc.; Notice of Preliminary Permit Application Accepted 
for Filing and Soliciting Comments, Motions To Intervene, and Competing 
Applications

July 29, 2009.
    On April 29, 2009, McGinnis, Inc. filed an application for a 
preliminary permit, pursuant to section 4(f) of the Federal Power Act, 
proposing to study the feasibility of the Marmet Hydrokinetic Project, 
to be located on the Kanawha River, in Kanawha County, West Virginia.
    The sole purpose of a preliminary permit, if issued, is to grant 
the permit holder priority to file a license application during the 
permit term. A preliminary permit does not authorize the permit holder 
to perform any land disturbing activities or otherwise enter upon lands 
or waters owned by others without the owners' express permission.
    The proposed Meldahl Hydrokinetic Project consists of: (1) 10 
proposed 35 kilowatt turbine-generator units having a total installed 
capacity of 0.35 megawatts; (2) a 300-feet-long, 13.2 kilovolt 
transmission line; and (3) appurtenant facilities. The proposed 
Winfield Hydrokinetic Project would have an average annual generation 
of 1.533 gigawatt-hours.
    Applicant Contact: Bruce D. McGinnis, Sr., CEO, McGinnis, Inc., 502 
Second Street Ext., South Point, OH 45680; phone: (740) 377-4391.
    FERC Contact: Kim Carter, 202-502-6486.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Comments, motions to intervene, notices of intent, and competing 
applications may be filed electronically via the Internet. See 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
under the ``e-Filing'' link. If unable to be filed electronically, 
documents may be paper-filed. To paper-file, an original and eight 
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For 
more information on how to submit these types of filings please go to 
the Commission's Web site located at https://www.ferc.gov/filing-comments.asp.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-13448) in the docket number field to access 
the document. For assistance, call toll-free 1-866-208-3372.

Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E9-18635 Filed 8-4-09; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.