University of New Hampshire; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 38176 [E9-18297]
Download as PDF
38176
Federal Register / Vol. 74, No. 146 / Friday, July 31, 2009 / Notices
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at https://
www.ferc.gov/filing-comments.asp.
More information about this project can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P–13431) in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–18296 Filed 7–30–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Kimberly D. Bose,
Secretary.
[FR Doc. E9–18297 Filed 7–30–09; 8:45 am]
[Project No. 13503–000]
University of New Hampshire; Notice
of Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
PWALKER on DSK8KYBLC1PROD with NOTICES
July 27, 2009.
On June 9, 2009, the University of
New Hampshire, Center for Ocean
Renewable Energy filed an application,
pursuant to the FPA, proposing to study
the feasibility of the General Sullivan
and Little Bay Bridges Tidal Energy
Project No. 13503, to be located on the
Piscataqua River, in Rockingham and
Strafford Counties, New Hampshire.
The proposed project would be
located near the General Sullivan and
Little Bay bridges and would consist of:
(1) A single 10-foot-wide by 35-foot-long
test platform suspending a variety of
hydrokinetic devices including a Gorlov
Helical turbine generating unit into the
river; and (2) appurtenant facilities.
Project generation would be used to
power the test platform, therefore no
transmission line is proposed.
Applicant Contact: Professor Ken
Baldwin, Chase Ocean Engineering
Laboratory, 24 Colovos, University of
VerDate Nov<24>2008
16:38 Jul 30, 2009
New Hampshire, Durham, NH 03824,
(603) 862–1898.
FERC Contact: Tom Dean, (202) 502–
6041.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing application: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘eFiling’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–13503) in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3372.
Jkt 217001
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13385–000]
Lock +TM Hydro Friends Fund V, LLC;
Notice of Preliminary Permit
Application Accepted for Filing and
Soliciting Comments, Motions To
Intervene, and Competing Applications
July 27, 2009.
On March 2, 2009, and supplemented
on May 29, 2009, Lock +TM Hydro
Friends Fund V, LLC filed an
application for a three-year preliminary
permit, pursuant to section 4(f) of the
Federal Power Act (FPA), to study the
feasibility of the proposed Bulldog
Project. The Bulldog Project would be
located on the Mississippi River at the
U.S. Army Corps of Engineers Lock and
Dam No. 27 in Granite City, Madison
County, Illinois, and within Clair
County, Illinois, and St. Louis County,
Missouri.
PO 00000
Frm 00012
Fmt 4703
Sfmt 4703
The proposed project would consist
of: (1) A new lock door placed in an
auxiliary lock that would hold seven
new turbine generating units with a
total capacity of 4,963 kW; (2) new
removable panels to control flow
through the turbine units; and (3)
appurtenant facilities. Project power
would be transmitted through a 1,000foot-long, 36.7-kV transmission line.
The estimated annual generation is
41,330 megawatt-hours.
Applicant Contact: Mr. Wayne F.
Krouse, Hydro Friends Fund V, LLC,
5090 Richmond Avenue, Suite 390,
Houston, TX 77056; 877–556–6566, ext.
709.
FERC Contact: Patrick Murphy, (202)
502–8755.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13385) in the docket number field to
access the document. For assistance,
call toll-free 1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–18301 Filed 7–30–09;8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\31JYN1.SGM
31JYN1
Agencies
[Federal Register Volume 74, Number 146 (Friday, July 31, 2009)]
[Notices]
[Page 38176]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-18297]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13503-000]
University of New Hampshire; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
July 27, 2009.
On June 9, 2009, the University of New Hampshire, Center for Ocean
Renewable Energy filed an application, pursuant to the FPA, proposing
to study the feasibility of the General Sullivan and Little Bay Bridges
Tidal Energy Project No. 13503, to be located on the Piscataqua River,
in Rockingham and Strafford Counties, New Hampshire.
The proposed project would be located near the General Sullivan and
Little Bay bridges and would consist of: (1) A single 10-foot-wide by
35-foot-long test platform suspending a variety of hydrokinetic devices
including a Gorlov Helical turbine generating unit into the river; and
(2) appurtenant facilities. Project generation would be used to power
the test platform, therefore no transmission line is proposed.
Applicant Contact: Professor Ken Baldwin, Chase Ocean Engineering
Laboratory, 24 Colovos, University of New Hampshire, Durham, NH 03824,
(603) 862-1898.
FERC Contact: Tom Dean, (202) 502-6041.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing application: 60 days from the issuance of this notice.
Comments, motions to intervene, notices of intent, and competing
applications may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``eFiling'' link. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and eight
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For
more information on how to submit these types of filings please go to
the Commission's Web site located at https://www.ferc.gov/filing-comments.asp. More information about this project can be viewed or
printed on the ``eLibrary'' link of Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-
13503) in the docket number field to access the document. For
assistance, call toll-free 1-866-208-3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-18297 Filed 7-30-09; 8:45 am]
BILLING CODE 6717-01-P