Combined Notice of Filings, 38000-38001 [E9-18102]

Download as PDF 38000 Federal Register / Vol. 74, No. 145 / Thursday, July 30, 2009 / Notices of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. E9–18106 Filed 7–29–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings No. 2 erowe on DSK5CLS3C1PROD with NOTICES July 21, 2009. Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Docket Numbers: RP96–272–095. Applicants: Northern Natural Gas Company. Description: Northern Natural Gas Company submits 11 Revised Sheet 66B.01a et al. to its FERC Gas Tariff, Fifth Revised Volume 1 to be effective 7/21/09. Filed Date: 07/20/2009. Accession Number: 20090720–0217. Comment Date: 5 p.m. Eastern Time on Monday, August 03, 2009. Docket Numbers: RP05–422–033. Applicants: El Paso Natural Gas Company. Description: Supplemental Revenue Sharing Report of El Paso Natural Gas Company. Filed Date: 07/17/2009. Accession Number: 20090717–5081. Comment Date: 5 p.m. Eastern Time on Wednesday, July 29, 2009. Docket Numbers: RP09–61–008. Applicants: Gulf Crossing Pipeline Company LLC. Description: Gulf Crossing Pipeline Company LLC submits replacement amendment to negotiated rate letter agreements executed by Gulf Crossing and one of its customers in relation to the Gulf Crossing Project. VerDate Nov<24>2008 15:34 Jul 29, 2009 Jkt 217001 Filed Date: 07/17/2009. Accession Number: 20090720–0001. Comment Date: 5 p.m. Eastern Time on Wednesday, July 29, 2009. Docket Numbers: RP09–670–001. Applicants: Southern Natural Gas Company. Description: Southern Natural Gas Company submits Substitute Twelfth Revised Sheet 212H to its FERC Gas Tariff, Seventh Revised Volume, to be effective 9/1/09. Filed Date: 07/17/2009. Accession Number: 20090717–0038. Comment Date: 5 p.m. Eastern Time on Wednesday, July 29, 2009. Docket Numbers: RP09–671–001. Applicants: Southern LNG Inc. Description: Southern LNG, Inc., submits Substitute Fourth Revised Sheet 99 to its FERC Gas Tariff, Original Volume 1, to be effective 9/1/09. Filed Date: 07/17/2009. Accession Number: 20090717–0037. Comment Date: 5 p.m. Eastern Time on Wednesday, July 29, 2009. Docket Numbers: RP09–811–001. Applicants: Guardian Pipeline, LLC. Description: Guardian Pipeline, LLC, submits Second Revised Sheet 223 to its FERC Gas Tariff, Original Volume 1. Filed Date: 07/17/2009. Accession Number: 20090720–0219. Comment Date: 5 p.m. Eastern Time on Wednesday, July 29, 2009. Docket Numbers: RP09–685–001. Applicants: Eastern Shore Natural Gas Company. Description: Eastern Shore Natural Gas Company submits Sub First Revised Sheet 100A et al. to its FERC Gas Tariff, Second Revised Volume 1 to be effective 8/1/09. Filed Date: 07/20/2009. Accession Number: 20090720–0218. Comment Date: 5 p.m. Eastern Time on Monday, August 03, 2009. Any person desiring to protest this filing must file in accordance with Rule 211 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211). Protests to this filing will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Such protests must be filed on or before 5 p.m. Eastern time on the specified comment date. Anyone filing a protest must serve a copy of that document on all the parties to the proceeding. The Commission encourages electronic submission of protests in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest to the Federal Energy Regulatory PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. E9–18104 Filed 7–29–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings July 23, 2009. Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Docket Numbers: RP06–200–053. Applicants: Rockies Express Pipeline LLC. Description: Rockies Express Pipeline LLC submits Fifth Revised Sheet No. 8 et al. to its FERC Gas Tariff, Second Revised Volume No. 1. Filed Date: 07/22/2009. Accession Number: 20090722–0149. Comment Date: 5 p.m. Eastern Time on Monday, August 03, 2009. Docket Numbers: RP06–298–009. Applicants: Public Service Commission of New York v. Description: Semi-Annual Report of Operational Sales of Gas of National Fuel Gas Supply Corporation. Filed Date: 07/23/2009. Accession Number: 20090723–5028. Comment Date: 5 p.m. Eastern Time on Tuesday, August 04, 2009. Docket Numbers: RP09–275–002. Applicants: Columbia Gulf Transmission Company. Description: Columbia Gulf Transmission Company submits Tenth Revised Sheet 191A in its FERC Gas Tariff, Second Revised Volume 1 effective 7/11/09. Filed Date: 07/22/2009. Accession Number: 20090722–0145. Comment Date: 5 p.m. Eastern Time on Monday, August 03, 2009. Docket Numbers: RP09–618–001. Applicants: Stingray Pipeline Company, LLC. E:\FR\FM\30JYN1.SGM 30JYN1 Federal Register / Vol. 74, No. 145 / Thursday, July 30, 2009 / Notices Description: Stringray Pipeline Company, LLC submits Substitute Tenth Revised Sheet No. 199 to its FERC Gas Tariff, Third Revised Volume No. 1. Filed Date: 07/22/2009. Accession Number: 20090722–0147. Comment Date: 5 p.m. Eastern Time on Monday, August 03, 2009. Docket Numbers: RP09–685–002. Applicants: Eastern Shore Natural Gas Company. Description: Eastern Shore Natural Gas Co submits Second Sub Eighth Revised Sheet No. 15 to FERC Gas Tariff, Second Revised Volume No. 1. Filed Date: 07/22/2009. Accession Number: 20090722–0146. Comment Date: 5 p.m. Eastern Time on Monday, August 03, 2009. erowe on DSK5CLS3C1PROD with NOTICES Docket Numbers: RP09–687–002. Applicants: Equitrans, L.P. Description: Motion of Equitrans, LP for extension of time to comply with Order No. 587–T. Filed Date: 07/17/2009. Accession Number: 20090720–0108. Comment Date: 5 p.m. Eastern Time on Wednesday, July 29, 2009. Any person desiring to protest this filing must file in accordance with Rule 211 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211). Protests to this filing will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Such protests must be filed on or before 5 p.m. Eastern time on the specified comment date. Anyone filing a protest must serve a copy of that document on all the parties to the proceeding. The Commission encourages electronic submission of protests in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call VerDate Nov<24>2008 15:34 Jul 29, 2009 Jkt 217001 (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. E9–18102 Filed 7–29–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Bonneville Power Administration Mid-Columbia Coho Restoration Project AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of intent to prepare an Environmental Impact Statement (EIS) and notice of floodplain and wetlands involvement. SUMMARY: This notice announces BPA’s intention to prepare an EIS on funding the Confederated Tribes and Bands of the Yakama Nation (YN) to undertake the reintroduction of coho salmon into mid-Columbia River basin tributaries. The reintroduction would occur in the Methow and Wenatchee river basins in Chelan and Okanogan counties, Washington. The proposed reintroduction project would use both existing hatchery facilities as well as require construction of some new permanent and temporary facilities and modification of existing sites to serve as semi-natural rearing areas for juvenile coho. With this Notice of Intent, BPA is initiating the public scoping process for the EIS. BPA is requesting comments about potential environmental impacts that it should consider as it prepares the EIS for the proposed project, as well as comments on other alternatives that may meet the goals of the project. In accordance with DOE regulations for compliance with floodplain and wetlands environmental review requirements, BPA will prepare a floodplain and wetlands assessment to avoid or minimize potential harm to or within any affected floodplains and wetlands. The assessment will be included in the EIS. DATES: Written scoping comments are due to the address below no later than September 15, 2009. Comments may also be made at the EIS scoping meetings to be held on August 20, 2009 and August 21, 2009 at the addresses below. Send letters with comments and suggestions on the proposed scope of the Draft EIS, and requests to be placed on the project mailing list, to ADDRESSES: PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 38001 Bonneville Power Administration, Public Affairs Office—DKE–7, P.O. Box 14428, Portland, OR 97293–4428, or by fax to (503) 230–3285. You also may call BPA’s toll free comment line at (800) 622–4519 and leave a message (please include the name of this project), or submit comments online at https:// www.bpa.gov/comment. BPA will post all comment letters in their entirety on BPA’s Web site at https://www.bpa.gov/ comment. On Thursday, August, 20, 2009, a scoping meeting will be held from 6:30 p.m. to 9 p.m. at the Chelan Fire District 3 Community Center in Leavenworth, Washington. On Friday, August 21, 2009, a scoping meeting will be held from 6:30 p.m. to 9 p.m. at the Methow Valley Community Center in Twisp, Washington. At these meetings, we will provide a brief presentation of the proposal, beginning about 7 p.m. We will take comments and answer questions during the presentation. Following the presentation, members of the project team will be available to answer questions, accept oral and written comments, and provide maps and other information about the project. You may stop by anytime during the open house. FOR FURTHER INFORMATION CONTACT: Bruce Hollen, Environmental Coordinator, Bonneville Power Administration—KEC–4, P.O. Box 3621, Portland, Oregon 97208–3621; toll-free telephone 1–800–282–3713; direct telephone 503–230–5756; or e-mail bahollen@bpa.gov. Additional information can be found at BPA’s Web site: https://www.efw.bpa.gov/ environmental_services/nepadocs.aspx, click on ‘‘Project Reviews—Active,’’ then use the drop-down box and click on Mid-Columbia Coho Restoration Project. SUPPLEMENTARY INFORMATION: In 1999, BPA prepared an Environmental Assessment/Finding of No Significant Impact to support the funding of the YN-proposed Mid-Columbia Coho Restoration Feasibility Project. Over the past 10 years, the feasibility project has indicated that the concepts that were tested have the potential to result in the successful re-introduction of naturally reproducing populations of coho. The YN has also prepared a Master Plan to assess and guide the development of the full reintroduction program based on what was learned from the feasibility study and comments from the Northwest Power and Conservation Council’s (NPCC) Independent Scientific Review Panel (ISRP). Alternatives Proposed for Consideration. BPA is currently E:\FR\FM\30JYN1.SGM 30JYN1

Agencies

[Federal Register Volume 74, Number 145 (Thursday, July 30, 2009)]
[Notices]
[Pages 38000-38001]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-18102]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings

July 23, 2009.
    Take notice that the Commission has received the following Natural 
Gas Pipeline Rate and Refund Report filings:

    Docket Numbers: RP06-200-053.
    Applicants: Rockies Express Pipeline LLC.
    Description: Rockies Express Pipeline LLC submits Fifth Revised 
Sheet No. 8 et al. to its FERC Gas Tariff, Second Revised Volume No. 1.
    Filed Date: 07/22/2009.
    Accession Number: 20090722-0149.
    Comment Date: 5 p.m. Eastern Time on Monday, August 03, 2009.

    Docket Numbers: RP06-298-009.
    Applicants: Public Service Commission of New York v.
    Description: Semi-Annual Report of Operational Sales of Gas of 
National Fuel Gas Supply Corporation.
    Filed Date: 07/23/2009.
    Accession Number: 20090723-5028.
    Comment Date: 5 p.m. Eastern Time on Tuesday, August 04, 2009.

    Docket Numbers: RP09-275-002.
    Applicants: Columbia Gulf Transmission Company.
    Description: Columbia Gulf Transmission Company submits Tenth 
Revised Sheet 191A in its FERC Gas Tariff, Second Revised Volume 1 
effective 7/11/09.
    Filed Date: 07/22/2009.
    Accession Number: 20090722-0145.
    Comment Date: 5 p.m. Eastern Time on Monday, August 03, 2009.

    Docket Numbers: RP09-618-001.
    Applicants: Stingray Pipeline Company, LLC.

[[Page 38001]]

    Description: Stringray Pipeline Company, LLC submits Substitute 
Tenth Revised Sheet No. 199 to its FERC Gas Tariff, Third Revised 
Volume No. 1.
    Filed Date: 07/22/2009.
    Accession Number: 20090722-0147.
    Comment Date: 5 p.m. Eastern Time on Monday, August 03, 2009.

    Docket Numbers: RP09-685-002.
    Applicants: Eastern Shore Natural Gas Company.
    Description: Eastern Shore Natural Gas Co submits Second Sub Eighth 
Revised Sheet No. 15 to FERC Gas Tariff, Second Revised Volume No. 1.
    Filed Date: 07/22/2009.
    Accession Number: 20090722-0146.
    Comment Date: 5 p.m. Eastern Time on Monday, August 03, 2009.

    Docket Numbers: RP09-687-002.
    Applicants: Equitrans, L.P.
    Description: Motion of Equitrans, LP for extension of time to 
comply with Order No. 587-T.
    Filed Date: 07/17/2009.
    Accession Number: 20090720-0108.
    Comment Date: 5 p.m. Eastern Time on Wednesday, July 29, 2009.

    Any person desiring to protest this filing must file in accordance 
with Rule 211 of the Commission's Rules of Practice and Procedure (18 
CFR 385.211). Protests to this filing will be considered by the 
Commission in determining the appropriate action to be taken, but will 
not serve to make protestants parties to the proceeding. Such protests 
must be filed on or before 5 p.m. Eastern time on the specified comment 
date. Anyone filing a protest must serve a copy of that document on all 
the parties to the proceeding.
    The Commission encourages electronic submission of protests in lieu 
of paper using the ``eFiling'' link at https://www.ferc.gov. Persons 
unable to file electronically should submit an original and 14 copies 
of the protest to the Federal Energy Regulatory Commission, 888 First 
Street, NE., Washington, DC 20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. E9-18102 Filed 7-29-09; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.