Electric Quarterly Reports; PowerGrid Systems, Inc.; Notice of Revocation of Market-Based Rate Tariff, 36485 [E9-17507]
Download as PDF
Federal Register / Vol. 74, No. 140 / Thursday, July 23, 2009 / Notices
link. Enter the docket number,
excluding the last three digits, in the
docket number field to access the
document. For assistance, please contact
FERC, Online Support at
FERCOnlineSupport@ferc.gov or toll
Docket No.
File date
Exempt:
1. OA08–52–006 .............................................
2. P–2232–570 ................................................
3. P–13416–000 ..............................................
4. P–13416–000 ..............................................
Kimberly D. Bose,
Secretary.
[FR Doc. E9–17497 Filed 7–22–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. ER02–2001–012; ER07–1250–
000]
Electric Quarterly Reports; PowerGrid
Systems, Inc.; Notice of Revocation of
Market-Based Rate Tariff
July 16, 2009.
erowe on DSK5CLS3C1PROD with NOTICES
On June 22, 2009, the Commission
issued an order announcing its intent to
revoke the market-based rate authority
of the above captioned public utility,
which had failed to file its required
Electric Quarterly Reports.1 The
Commission provided the utility fifteen
days in which to file its overdue Electric
Quarterly Reports or face revocation of
its market-based rate tariff.
In Order No. 2001, the Commission
revised its public utility filing
requirements and established a
requirement for public utilities,
including power marketers, to file
Electric Quarterly Reports summarizing
the contractual terms and conditions in
their agreements for all jurisdictional
services (including market-based power
sales, cost-based power sales, and
transmission service) and providing
transaction information (including rates)
for short-term and long-term power
sales during the most recent calendar
quarter.2
In the June 22 Order, the Commission
directed PowerGrid Systems, Inc. to file
the required Electric Quarterly Reports
within 15 days of the date of issuance
1 Electric Quarterly Reports, 127 FERC ¶ 61,290
(2009) (June 22 Order).
2 Revised Public Utility Filing Requirements,
Order No. 2001, 67 Fed. Reg. 31,043, FERC Stats.
& Regs. ¶ 31,127, reh’g denied, Order No. 2001–A,
100 FERC ¶ 61,074, reconsideration and
clarification denied, Order No. 2001–B, 100 FERC
¶ 61,342, order directing filings, Order No. 2001–C,
101 FERC ¶ 61,314 (2002), order directing filing,
Order No. 2001–D, 102 FERC ¶ 61,334 (2003).
VerDate Nov<24>2008
15:01 Jul 22, 2009
Jkt 217001
7–13–09
7–02–09
7–08–09
7–02–09
Hon.
Hon.
Hon.
Hon.
Maurice D. Hinchey, Hon. John Hall, Hon. Michael A. Arcuri.
Patrick McHenry.
Timothy J. Walz.
Gene Pelowski, Jr.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–17507 Filed 7–22–09; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–8931–6]
Cross-Media Electronic Reporting Rule
State Authorized Program Revision
Approval: State of Tennessee
AGENCY: Environmental Protection
Agency (EPA).
ACTION: Notice.
SUMMARY: This notice announces EPA’s
approval, under regulations for CrossMedia Electronic Reporting, of the State
of Tennessee’s request to revise certain
of their EPA-authorized programs to
allow electronic reporting.
DATES: EPA’s approval is effective July
23, 2009.
FOR FURTHER INFORMATION CONTACT: Evi
Huffer, U.S. Environmental Protection
Agency, Office of Environmental
Information, Mail Stop 2823T, 1200
Pennsylvania Avenue, NW.,
Washington, DC 20460, (202) 566–1697,
huffer.evi@epa.gov, or David Schwarz,
U.S. Environmental Protection Agency,
Office of Environmental Information,
Mail Stop 2823T, 1200 Pennsylvania
Avenue, NW., Washington, DC 20460,
(202) 566–1704,
schwarz.david@epa.gov.
PO 00000
22 Order at Ordering Paragraph A.
Frm 00038
free at (866) 208–3676, or for TTY,
contact (202) 502–8659.
Presenter or requester
of the order or face revocation of its
authority to sell power at market-based
rates and termination of its electric
market-based rate tariff. 3
The time period for compliance with
the June 22 Order has elapsed. The
company identified in the June 22 Order
(PowerGrid Systems, Inc.) has failed to
file its delinquent Electric Quarterly
Reports.
The Commission hereby revokes this
company’s market-based rate authority
and terminates the electric market-based
rate tariff.
3 June
36485
Fmt 4703
Sfmt 4703
On
October 13, 2005, the final Cross-Media
Electronic Reporting Rule (CROMERR)
was published in the Federal Register
(70 FR 59848) and codified as part 3 of
title 40 of the CFR. CROMERR
establishes electronic reporting as an
acceptable regulatory alternative to
paper reporting and establishes
requirements to assure that electronic
documents are as legally dependable as
their paper counterparts. Subpart D of
CROMERR, requires that state, tribal or
local government agencies that receive,
or wish to begin receiving, electronic
reports under their EPA-authorized
programs must apply to EPA for a
revision or modification of those
programs and get EPA approval. Subpart
D provides standards for such approvals
based on consideration of the electronic
document receiving systems that the
state, tribe, or local government will use
to implement the electronic reporting.
Additionally, in § 3.1000(b) through (e)
of 40 CFR part 3, subpart D provides
special procedures for program
revisions and modifications to allow
electronic reporting, to be used at the
option of the state, tribe or local
government in place of procedures
available under existing programspecific authorization regulations. An
application submitted under the subpart
D procedures must show that the state,
tribe or local government has sufficient
legal authority to implement the
electronic reporting components of the
programs covered by the application
and will use electronic document
receiving systems that meet the
applicable subpart D requirements.
On January 6, 2009, the State of
Tennessee Department of Environment
and Conservation (TNDEC) submitted
an application for its Net Discharge
Monitoring Report (NetDMR) electronic
document receiving system for revision
of Tennessee’s 40 CFR Part 123–
National Pollutant Discharge
Elimination System (NPDES) State
Program Requirements EPA-authorized
program for electronic reporting of
Discharge Monitoring Report (DMR)
information under 40 CFR parts 122 and
123.
SUPPLEMENTARY INFORMATION:
E:\FR\FM\23JYN1.SGM
23JYN1
Agencies
[Federal Register Volume 74, Number 140 (Thursday, July 23, 2009)]
[Notices]
[Page 36485]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-17507]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket Nos. ER02-2001-012; ER07-1250-000]
Electric Quarterly Reports; PowerGrid Systems, Inc.; Notice of
Revocation of Market-Based Rate Tariff
July 16, 2009.
On June 22, 2009, the Commission issued an order announcing its
intent to revoke the market-based rate authority of the above captioned
public utility, which had failed to file its required Electric
Quarterly Reports.\1\ The Commission provided the utility fifteen days
in which to file its overdue Electric Quarterly Reports or face
revocation of its market-based rate tariff.
---------------------------------------------------------------------------
\1\ Electric Quarterly Reports, 127 FERC ] 61,290 (2009) (June
22 Order).
---------------------------------------------------------------------------
In Order No. 2001, the Commission revised its public utility filing
requirements and established a requirement for public utilities,
including power marketers, to file Electric Quarterly Reports
summarizing the contractual terms and conditions in their agreements
for all jurisdictional services (including market-based power sales,
cost-based power sales, and transmission service) and providing
transaction information (including rates) for short-term and long-term
power sales during the most recent calendar quarter.\2\
---------------------------------------------------------------------------
\2\ Revised Public Utility Filing Requirements, Order No. 2001,
67 Fed. Reg. 31,043, FERC Stats. & Regs. ] 31,127, reh'g denied,
Order No. 2001-A, 100 FERC ] 61,074, reconsideration and
clarification denied, Order No. 2001-B, 100 FERC ] 61,342, order
directing filings, Order No. 2001-C, 101 FERC ] 61,314 (2002), order
directing filing, Order No. 2001-D, 102 FERC ] 61,334 (2003).
---------------------------------------------------------------------------
In the June 22 Order, the Commission directed PowerGrid Systems,
Inc. to file the required Electric Quarterly Reports within 15 days of
the date of issuance of the order or face revocation of its authority
to sell power at market-based rates and termination of its electric
market-based rate tariff. \3\
---------------------------------------------------------------------------
\3\ June 22 Order at Ordering Paragraph A.
---------------------------------------------------------------------------
The time period for compliance with the June 22 Order has elapsed.
The company identified in the June 22 Order (PowerGrid Systems, Inc.)
has failed to file its delinquent Electric Quarterly Reports.
The Commission hereby revokes this company's market-based rate
authority and terminates the electric market-based rate tariff.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-17507 Filed 7-22-09; 8:45 am]
BILLING CODE 6717-01-P