Duke Energy Carolinas, LLC; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests, 36481-36482 [E9-17505]

Download as PDF Federal Register / Vol. 74, No. 140 / Thursday, July 23, 2009 / Notices e.g. permitting electronic submission of responses. Kimberly D. Bose, Secretary. [FR Doc. E9–17502 Filed 7–22–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 11480–010] Haida Corporation; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests erowe on DSK5CLS3C1PROD with NOTICES July 16, 2009. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Application Type: Amendment of License. b. Project No.: 11480–010. c. Date Filed: August 1, 2008, and supplemented on May 29, 2009. d. Applicant: Haida Corporation. e. Name of Project: Reynolds Creek Hydroelectric Project. f. Location: When constructed, the project will be located on Reynolds Creek, near the town of Hydaburg, on Prince of Wales Island, in southeast Alaska. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Michael V. Stimac, Vice President, HDR Engineering, Inc., 500 108th Avenue NE., Suite 1200, Bellevue, Washington 98004; telephone (425) 450–6330. i. FERC Contact: Linda Stewart, telephone (202) 502–6680, and e-mail address linda.stewart@ferc.gov. j. Deadline for filing comments, motions to intervene, and protests: August 17, 2009. Comments, protests, and interventions may be filed electronically via the Internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https://www.ferc.gov) under the ‘‘efiling’’ link. The Commission strongly encourages electronic filings. All documents (original and eight copies) filed by paper should be sent to: Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Please include the project number (P–11480–010) on any comments or motions filed. The Commission’s Rules of Practice and Procedure require all interveners filing documents with the Commission VerDate Nov<24>2008 15:01 Jul 22, 2009 Jkt 217001 to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. k. Description of Request: (i) Amendment to Project Design: Haida Corporation proposes to install a single 5.0-megawatt (MW) turbine generating unit instead of installing two turbine generating units, a 1.5–MW unit and a 3.5–MW unit, during a two-phase construction process as authorized in the October 24, 2000 Order Issuing Original License (Major Project). The total installed capacity of the project would remain at 5.0 MW as currently authorized in the project license, and the total hydraulic capacity of the project would remain at 90 cubic feet per second as currently authorized in the project license. (ii) Amendment to License Articles: Haida Corporation proposes to modify or delete Articles 201, 301, 413, and 414 to the extent that they reference twophase construction. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 36481 In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’, as applicable, and the Project Number of the particular application to which the filing refers. p. Agency Comments: Federal, State, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. Kimberly D. Bose, Secretary. [FR Doc. E9–17504 Filed 7–22–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2232–570] Duke Energy Carolinas, LLC; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests July 16, 2009. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Raw Water Intake on 0.26 Acres of Project Lands. b. Project No.: 2232–570. c. Date Filed: June 18, 2009. d. Applicant: Duke Energy Carolinas, LLC. e. Name of Project: Catawba-Wateree. f. Location: Lake Rhodhiss on the Catawba River, city of Lenoir, Caldwell County, North Carolina g. Filed Pursuant to: Federal Power Act, 16 USC 791a–825r. h. Applicant Contact: Mr. Kelvin K. Reagan, Duke Energy Carolinas, LLC, P.O. Box 1006, Charlotte, North Carolina 28201–1006, (704) 382–9386. i. FERC Contact: Jeremy Jessup, Jeremy.Jessup@ferc.gov, (202) 502–6779. E:\FR\FM\23JYN1.SGM 23JYN1 erowe on DSK5CLS3C1PROD with NOTICES 36482 Federal Register / Vol. 74, No. 140 / Thursday, July 23, 2009 / Notices j. Deadline for filing comments, motions to intervene and protests: August 17, 2009. All documents (original and eight copies) should be filed with: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. k. Description of Request: Duke Energy Carolinas, LLC, proposes to grant permission to the City of Lenoir to use 0.26 acres of project lands to replace, construct, and maintain a raw water intake pipeline. The proposed eighteen million gallons per day intake would consist of two passive intake screens, two 36-inch diameter ductile iron intake pipes, a 45-ft deep wet well, and a raw water pump station. The area where the proposed intake tubes will be installed may require dredging to achieve the necessary line and grade, and excavation to construct structural supports for the intake screens. The proposed withdrawal is for municipal use by the City of Lenoir, North Carolina. l. Location of the Application: The filing is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426 or by calling (202) 502–8371, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/ docsfiling/esubscription.asp to be notified via e-mail of new filings and issuances related to this or other pending projects. For assistance, call 1– 866–208–3676 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. VerDate Nov<24>2008 15:01 Jul 22, 2009 Jkt 217001 m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Any filing must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’, as applicable, and the Project Number of the particular application to which the filing refers. p. Agency Comments: Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. q. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(I)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov under the ‘‘eFiling’’ link. Kimberly D. Bose, Secretary. [FR Doc. E9–17505 Filed 7–22–09; 8:45 am] BILLING CODE 6717–01–P the application for a subsequent license for the Cinnamon Ranch Hydroelectric Project, and has prepared an Environmental Assessment. The operating project is located on Pellisier Creek, Middle Creek, and Birch Creek, in the Hammil Valley area of Mono County, near the Town of Benton, California. The project occupies 0.13 acre of U.S. Forest Service lands within the Inyo National Forest and 7.53 acres of lands administered by the Bureau of Land Management. The EA contains the staff’s analysis of the potential environmental impacts of the project and concludes that relicensing the project would not constitute a major Federal action that would significantly affect the quality of the human environment. A copy of the EA is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at (866) 208–3676, or for TTY, (202) 502–8659. You may also register online at https://www.ferc.gov/esubscribenow.htm to be notified via e-mail of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or tollfree at 1–866–208–3676, or for TTY, (202) 502–8659. Please contact Gaylord Hoisington by telephone at (202) 502–6032 or by e-mail at gaylord.hoisington@ferc.gov if you have any questions. Kimberly D. Bose, Secretary. [FR Doc. E9–17506 Filed 7–22–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Federal Energy Regulatory Commission [Project No. 6885–009–CA] Cinnamon Ranch Hydroelectric Project; Notice of Availability of Environmental Assessment July 16, 2009. In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission’s regulations, 18 CFR part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 [Docket No. ER09–1270–001] Chula Vista Energy Center, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization July 16, 2009. This is a supplemental notice in the above-referenced proceeding of Chula Vista Energy Center, LLC’s application E:\FR\FM\23JYN1.SGM 23JYN1

Agencies

[Federal Register Volume 74, Number 140 (Thursday, July 23, 2009)]
[Notices]
[Pages 36481-36482]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-17505]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2232-570]


Duke Energy Carolinas, LLC; Notice of Application for Amendment 
of License and Soliciting Comments, Motions To Intervene, and Protests

July 16, 2009.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Raw Water Intake on 0.26 Acres of Project 
Lands.
    b. Project No.: 2232-570.
    c. Date Filed: June 18, 2009.
    d. Applicant: Duke Energy Carolinas, LLC.
    e. Name of Project: Catawba-Wateree.
    f. Location: Lake Rhodhiss on the Catawba River, city of Lenoir, 
Caldwell County, North Carolina
    g. Filed Pursuant to: Federal Power Act, 16 USC 791a-825r.
    h. Applicant Contact: Mr. Kelvin K. Reagan, Duke Energy Carolinas, 
LLC, P.O. Box 1006, Charlotte, North Carolina 28201-1006, (704) 382-
9386.
    i. FERC Contact: Jeremy Jessup, Jeremy.Jessup@ferc.gov, (202) 502-
6779.

[[Page 36482]]

    j. Deadline for filing comments, motions to intervene and protests: 
August 17, 2009.
    All documents (original and eight copies) should be filed with: 
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 
First Street, NE., Washington, DC 20426.
    The Commission's Rules of Practice and Procedure require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person whose name appears on the official service 
list for the project. Further, if an intervenor files comments or 
documents with the Commission relating to the merits of an issue that 
may affect the responsibilities of a particular resource agency, they 
must also serve a copy of the document on that resource agency. A copy 
of any motion to intervene must also be served upon each representative 
of the Applicant specified in the particular application.
    k. Description of Request: Duke Energy Carolinas, LLC, proposes to 
grant permission to the City of Lenoir to use 0.26 acres of project 
lands to replace, construct, and maintain a raw water intake pipeline. 
The proposed eighteen million gallons per day intake would consist of 
two passive intake screens, two 36-inch diameter ductile iron intake 
pipes, a 45-ft deep wet well, and a raw water pump station. The area 
where the proposed intake tubes will be installed may require dredging 
to achieve the necessary line and grade, and excavation to construct 
structural supports for the intake screens. The proposed withdrawal is 
for municipal use by the City of Lenoir, North Carolina.
    l. Location of the Application: The filing is available for 
inspection and reproduction at the Commission's Public Reference Room, 
located at 888 First Street, NE., Room 2A, Washington, DC 20426 or by 
calling (202) 502-8371, or by calling (202) 502-8371. This filing may 
also be viewed on the Commission's Web site at https://ferc.gov using 
the ``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. You may also 
register online at https://www.ferc.gov/docsfiling/esubscription.asp to 
be notified via e-mail of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3676 or e-mail 
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Any filing must bear in all capital letters the title 
``COMMENTS'', ``PROTEST'', or ``MOTION TO INTERVENE'', as applicable, 
and the Project Number of the particular application to which the 
filing refers.
    p. Agency Comments: Federal, state, and local agencies are invited 
to file comments on the described application. A copy of the 
application may be obtained by agencies directly from the Applicant. If 
an agency does not file comments within the time specified for filing 
comments, it will be presumed to have no comments. One copy of an 
agency's comments must also be sent to the Applicant's representatives.
    q. Comments, protests and interventions may be filed electronically 
via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(I)(iii) and 
the instructions on the Commission's Web site at https://www.ferc.gov 
under the ``e-Filing'' link.

Kimberly D. Bose,
Secretary.
[FR Doc. E9-17505 Filed 7-22-09; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.