FFP Project 76, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 34563-34564 [E9-16851]
Download as PDF
Federal Register / Vol. 74, No. 135 / Thursday, July 16, 2009 / Notices
and (3) appurtenant facilities. The
proposed Matthews Bend Hydrokinetic
Project would have an average annual
generation of 666 gigawatt-hours.
Applicant Contact: Ramya
Swaminathan, Vice President of
Development, Free Flow Power
Corporation, 33 Commercial Street,
Gloucester, MA 01930; phone: (978)
226–1531.
FERC Contact: Kim Carter, 202–502–
6486.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project, including a copy of the
application, can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13482) in the docket number field to
access the document. For assistance,
call toll-free 1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–16847 Filed 7–15–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
erowe on DSK5CLS3C1PROD with NOTICES
[Project No. 13484–000]
FFP Project 73, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
July 9, 2009.
On May 22, 2009, FFP Project 73, LLC
filed an application for a preliminary
permit, pursuant to section 4(f) of the
Federal Power Act, proposing to study
the feasibility of the Georgetown Bend
VerDate Nov<24>2008
15:08 Jul 15, 2009
Jkt 217001
Hydrokinetic Project, to be located on
the Mississippi River, in Desha and
Chicot Counties, Arkansas and Bolivar
and Washington Counties, Mississippi.
The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any land
disturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed Georgetown Bend
Hydrokinetic Project consists of: (1)
2,915 proposed 40 kilowatt Free Flow
generating units having a total installed
capacity of 116.60 megawatts; (2) a 3.6mile-long, 69 kilovolt transmission line;
and (3) appurtenant facilities. The
proposed Georgetown Bend
Hydrokinetic Project would have an
average annual generation of 511
gigawatt-hours.
Applicant Contact: Ramya
Swaminathan, Vice President of
Development, Free Flow Power
Corporation, 33 Commercial Street,
Gloucester, MA 01930; phone: (978)
226–1531.
FERC Contact: Kim Carter, 202–502–
6486.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project, including a copy of the
application, can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13484) in the docket number field to
access the document. For assistance,
call toll-free 1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–16849 Filed 7–15–09; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
34563
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13486–000]
FFP Project 76, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
July 9, 2009.
On May 22, 2009, FFP Project 76, LLC
filed an application for a preliminary
permit, pursuant to section 4(f) of the
Federal Power Act, proposing to study
the feasibility of the Burke Landing
Hydrokinetic Project, to be located on
the Mississippi River, in Phillips
County, Arkansas and Coahoma County,
Mississippi.
The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any land
disturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed Burke Landing
Hydrokinetic Project consists of: (1)
2,028 proposed 40 kilowatt Free Flow
generating units having a total installed
capacity of 81.12 megawatts; (2) a 2.2mile-long, 69 kilovolt transmission line;
and (3) appurtenant facilities. The
proposed Burke Landing Hydrokinetic
Project would have an average annual
generation of 355 gigawatt-hours.
Applicant Contact: Ramya
Swaminathan, Vice President of
Development, Free Flow Power
Corporation, 33 Commercial Street,
Gloucester, MA 01930; phone: (978)
226–1531.
FERC Contact: Kim Carter, 202–502–
6486.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
E:\FR\FM\16JYN1.SGM
16JYN1
34564
Federal Register / Vol. 74, No. 135 / Thursday, July 16, 2009 / Notices
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project, including a copy of the
application, can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13486) in the docket number field to
access the document. For assistance,
call toll-free 1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–16851 Filed 7–15–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP07–30–003]
Petal Gas Storage, L.L.C.; Notice of
Application
erowe on DSK5CLS3C1PROD with NOTICES
July 9, 2009.
Take notice that on June 29, 2009,
Petal Gas Storage, L.L.C (Petal), 1100
Louisiana Street, Houston, Texas 77002,
filed with the Federal Energy Regulatory
Commission a motion for
reconsideration of Engineering
Condition No. 5 of the Commission’s
March 28, 2007 order in the abovereferenced docket. The motion requests
permission to implement a Well and
Cavern Integrity Monitoring Program in
lieu of the well logging and sonar
surveys required by Engineering
Condition No. 5, as modified on
rehearing. The motion for
reconsideration will be treated as an
application for amendment of Petal’s
existing certificate authority. The
application is on file with the
Commission and open to public
inspection. The filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, please contact
FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or for TTY,
contact (202) 502–8659
Any questions regarding the
application should be directed to
Richard Porter, Petal Gas Storage, L.L.C,
1100 Louisiana Street, Houston, Texas
77002, (telephone) (713) 381–2526, (fax)
(713) 803–2534, rporter@eprod.com.
Pursuant to Section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
VerDate Nov<24>2008
15:08 Jul 15, 2009
Jkt 217001
Commission staff will either: complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date,
file with the Federal Energy Regulatory
Commission, 888 First Street, NE.,
Washington, DC 20426, a motion to
intervene in accordance with the
requirements of the Commission’s Rules
of Practice and Procedure (18 CFR
385.214 or 385.211) and the Regulations
under the NGA (18 CFR 157.10). A
person obtaining party status will be
placed on the service list maintained by
the Secretary of the Commission and
will receive copies of all documents
filed by the applicant and by all other
parties. A party must submit 14 copies
of filings made with the Commission
and must mail a copy to the applicant
and to every other party in the
proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (https://
www.ferc.gov) under the ‘‘e-Filing’’ link.
Comment Date: July 30, 2009.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–16853 Filed 7–15–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13487–000]
FFP Project 77, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
July 9, 2009.
On May 22, 2009, FFP Project 77, LLC
filed an application for a preliminary
permit, pursuant to section 4(f) of the
Federal Power Act, proposing to study
the feasibility of the Cow Island Bend
Hydrokinetic Project, to be located on
the Mississippi River, in Crittenden
County, Arkansas; DeSoto County,
Mississippi; and Shelby County,
Tennessee.
The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any land
disturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed Cow Island Bend
Hydrokinetic Project consists of: (1)
3,802 proposed 40 kilowatt Free Flow
generating units having a total installed
capacity of 152.08 megawatts; (2) a 5mile-long, 69 kilovolt transmission line;
and (3) appurtenant facilities. The
proposed Cow Island Bend
Hydrokinetic Project would have an
average annual generation of 666
gigawatt-hours.
Applicant Contact: Ramya
Swaminathan, Vice President of
Development, Free Flow Power
Corporation, 33 Commercial Street,
Gloucester, MA 01930; phone: (978)
226–1531.
FERC Contact: Kim Carter, 202–502–
6486.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
E:\FR\FM\16JYN1.SGM
16JYN1
Agencies
[Federal Register Volume 74, Number 135 (Thursday, July 16, 2009)]
[Notices]
[Pages 34563-34564]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-16851]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13486-000]
FFP Project 76, LLC; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
July 9, 2009.
On May 22, 2009, FFP Project 76, LLC filed an application for a
preliminary permit, pursuant to section 4(f) of the Federal Power Act,
proposing to study the feasibility of the Burke Landing Hydrokinetic
Project, to be located on the Mississippi River, in Phillips County,
Arkansas and Coahoma County, Mississippi.
The sole purpose of a preliminary permit, if issued, is to grant
the permit holder priority to file a license application during the
permit term. A preliminary permit does not authorize the permit holder
to perform any land disturbing activities or otherwise enter upon lands
or waters owned by others without the owners' express permission.
The proposed Burke Landing Hydrokinetic Project consists of: (1)
2,028 proposed 40 kilowatt Free Flow generating units having a total
installed capacity of 81.12 megawatts; (2) a 2.2-mile-long, 69 kilovolt
transmission line; and (3) appurtenant facilities. The proposed Burke
Landing Hydrokinetic Project would have an average annual generation of
355 gigawatt-hours.
Applicant Contact: Ramya Swaminathan, Vice President of
Development, Free Flow Power Corporation, 33 Commercial Street,
Gloucester, MA 01930; phone: (978) 226-1531.
FERC Contact: Kim Carter, 202-502-6486.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Comments, motions to intervene, notices of intent, and competing
applications may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and eight
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For
more information on how to submit these types of filings please go to
the
[[Page 34564]]
Commission's Web site located at https://www.ferc.gov/filing-comments.asp. More information about this project, including a copy of
the application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-13486) in the docket number field to access
the document. For assistance, call toll-free 1-866-208-3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-16851 Filed 7-15-09; 8:45 am]