FFP Project 76, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 34563-34564 [E9-16851]

Download as PDF Federal Register / Vol. 74, No. 135 / Thursday, July 16, 2009 / Notices and (3) appurtenant facilities. The proposed Matthews Bend Hydrokinetic Project would have an average annual generation of 666 gigawatt-hours. Applicant Contact: Ramya Swaminathan, Vice President of Development, Free Flow Power Corporation, 33 Commercial Street, Gloucester, MA 01930; phone: (978) 226–1531. FERC Contact: Kim Carter, 202–502– 6486. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https://www.ferc.gov/filingcomments.asp. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–13482) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3372. Kimberly D. Bose, Secretary. [FR Doc. E9–16847 Filed 7–15–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission erowe on DSK5CLS3C1PROD with NOTICES [Project No. 13484–000] FFP Project 73, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications July 9, 2009. On May 22, 2009, FFP Project 73, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Georgetown Bend VerDate Nov<24>2008 15:08 Jul 15, 2009 Jkt 217001 Hydrokinetic Project, to be located on the Mississippi River, in Desha and Chicot Counties, Arkansas and Bolivar and Washington Counties, Mississippi. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed Georgetown Bend Hydrokinetic Project consists of: (1) 2,915 proposed 40 kilowatt Free Flow generating units having a total installed capacity of 116.60 megawatts; (2) a 3.6mile-long, 69 kilovolt transmission line; and (3) appurtenant facilities. The proposed Georgetown Bend Hydrokinetic Project would have an average annual generation of 511 gigawatt-hours. Applicant Contact: Ramya Swaminathan, Vice President of Development, Free Flow Power Corporation, 33 Commercial Street, Gloucester, MA 01930; phone: (978) 226–1531. FERC Contact: Kim Carter, 202–502– 6486. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https://www.ferc.gov/filingcomments.asp. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–13484) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3372. Kimberly D. Bose, Secretary. [FR Doc. E9–16849 Filed 7–15–09; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00015 Fmt 4703 Sfmt 4703 34563 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13486–000] FFP Project 76, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications July 9, 2009. On May 22, 2009, FFP Project 76, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Burke Landing Hydrokinetic Project, to be located on the Mississippi River, in Phillips County, Arkansas and Coahoma County, Mississippi. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed Burke Landing Hydrokinetic Project consists of: (1) 2,028 proposed 40 kilowatt Free Flow generating units having a total installed capacity of 81.12 megawatts; (2) a 2.2mile-long, 69 kilovolt transmission line; and (3) appurtenant facilities. The proposed Burke Landing Hydrokinetic Project would have an average annual generation of 355 gigawatt-hours. Applicant Contact: Ramya Swaminathan, Vice President of Development, Free Flow Power Corporation, 33 Commercial Street, Gloucester, MA 01930; phone: (978) 226–1531. FERC Contact: Kim Carter, 202–502– 6486. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the E:\FR\FM\16JYN1.SGM 16JYN1 34564 Federal Register / Vol. 74, No. 135 / Thursday, July 16, 2009 / Notices Commission’s Web site located at https://www.ferc.gov/filingcomments.asp. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–13486) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3372. Kimberly D. Bose, Secretary. [FR Doc. E9–16851 Filed 7–15–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP07–30–003] Petal Gas Storage, L.L.C.; Notice of Application erowe on DSK5CLS3C1PROD with NOTICES July 9, 2009. Take notice that on June 29, 2009, Petal Gas Storage, L.L.C (Petal), 1100 Louisiana Street, Houston, Texas 77002, filed with the Federal Energy Regulatory Commission a motion for reconsideration of Engineering Condition No. 5 of the Commission’s March 28, 2007 order in the abovereferenced docket. The motion requests permission to implement a Well and Cavern Integrity Monitoring Program in lieu of the well logging and sonar surveys required by Engineering Condition No. 5, as modified on rehearing. The motion for reconsideration will be treated as an application for amendment of Petal’s existing certificate authority. The application is on file with the Commission and open to public inspection. The filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659 Any questions regarding the application should be directed to Richard Porter, Petal Gas Storage, L.L.C, 1100 Louisiana Street, Houston, Texas 77002, (telephone) (713) 381–2526, (fax) (713) 803–2534, rporter@eprod.com. Pursuant to Section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the VerDate Nov<24>2008 15:08 Jul 15, 2009 Jkt 217001 Commission staff will either: complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date, file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 14 copies of filings made with the Commission and must mail a copy to the applicant and to every other party in the proceeding. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. The Commission strongly encourages electronic filings of comments, protests, and interventions via the internet in lieu PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (https:// www.ferc.gov) under the ‘‘e-Filing’’ link. Comment Date: July 30, 2009. Kimberly D. Bose, Secretary. [FR Doc. E9–16853 Filed 7–15–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13487–000] FFP Project 77, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications July 9, 2009. On May 22, 2009, FFP Project 77, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Cow Island Bend Hydrokinetic Project, to be located on the Mississippi River, in Crittenden County, Arkansas; DeSoto County, Mississippi; and Shelby County, Tennessee. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed Cow Island Bend Hydrokinetic Project consists of: (1) 3,802 proposed 40 kilowatt Free Flow generating units having a total installed capacity of 152.08 megawatts; (2) a 5mile-long, 69 kilovolt transmission line; and (3) appurtenant facilities. The proposed Cow Island Bend Hydrokinetic Project would have an average annual generation of 666 gigawatt-hours. Applicant Contact: Ramya Swaminathan, Vice President of Development, Free Flow Power Corporation, 33 Commercial Street, Gloucester, MA 01930; phone: (978) 226–1531. FERC Contact: Kim Carter, 202–502– 6486. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, E:\FR\FM\16JYN1.SGM 16JYN1

Agencies

[Federal Register Volume 74, Number 135 (Thursday, July 16, 2009)]
[Notices]
[Pages 34563-34564]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-16851]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13486-000]


FFP Project 76, LLC; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

July 9, 2009.
    On May 22, 2009, FFP Project 76, LLC filed an application for a 
preliminary permit, pursuant to section 4(f) of the Federal Power Act, 
proposing to study the feasibility of the Burke Landing Hydrokinetic 
Project, to be located on the Mississippi River, in Phillips County, 
Arkansas and Coahoma County, Mississippi.
    The sole purpose of a preliminary permit, if issued, is to grant 
the permit holder priority to file a license application during the 
permit term. A preliminary permit does not authorize the permit holder 
to perform any land disturbing activities or otherwise enter upon lands 
or waters owned by others without the owners' express permission.
    The proposed Burke Landing Hydrokinetic Project consists of: (1) 
2,028 proposed 40 kilowatt Free Flow generating units having a total 
installed capacity of 81.12 megawatts; (2) a 2.2-mile-long, 69 kilovolt 
transmission line; and (3) appurtenant facilities. The proposed Burke 
Landing Hydrokinetic Project would have an average annual generation of 
355 gigawatt-hours.
    Applicant Contact: Ramya Swaminathan, Vice President of 
Development, Free Flow Power Corporation, 33 Commercial Street, 
Gloucester, MA 01930; phone: (978) 226-1531.
    FERC Contact: Kim Carter, 202-502-6486.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Comments, motions to intervene, notices of intent, and competing 
applications may be filed electronically via the Internet. See 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
under the ``e-Filing'' link. If unable to be filed electronically, 
documents may be paper-filed. To paper-file, an original and eight 
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For 
more information on how to submit these types of filings please go to 
the

[[Page 34564]]

Commission's Web site located at https://www.ferc.gov/filing-comments.asp. More information about this project, including a copy of 
the application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-13486) in the docket number field to access 
the document. For assistance, call toll-free 1-866-208-3372.

Kimberly D. Bose,
Secretary.
[FR Doc. E9-16851 Filed 7-15-09; 8:45 am]