FFP Project 73, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 34563 [E9-16849]
Download as PDF
Federal Register / Vol. 74, No. 135 / Thursday, July 16, 2009 / Notices
and (3) appurtenant facilities. The
proposed Matthews Bend Hydrokinetic
Project would have an average annual
generation of 666 gigawatt-hours.
Applicant Contact: Ramya
Swaminathan, Vice President of
Development, Free Flow Power
Corporation, 33 Commercial Street,
Gloucester, MA 01930; phone: (978)
226–1531.
FERC Contact: Kim Carter, 202–502–
6486.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project, including a copy of the
application, can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13482) in the docket number field to
access the document. For assistance,
call toll-free 1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–16847 Filed 7–15–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
erowe on DSK5CLS3C1PROD with NOTICES
[Project No. 13484–000]
FFP Project 73, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
July 9, 2009.
On May 22, 2009, FFP Project 73, LLC
filed an application for a preliminary
permit, pursuant to section 4(f) of the
Federal Power Act, proposing to study
the feasibility of the Georgetown Bend
VerDate Nov<24>2008
15:08 Jul 15, 2009
Jkt 217001
Hydrokinetic Project, to be located on
the Mississippi River, in Desha and
Chicot Counties, Arkansas and Bolivar
and Washington Counties, Mississippi.
The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any land
disturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed Georgetown Bend
Hydrokinetic Project consists of: (1)
2,915 proposed 40 kilowatt Free Flow
generating units having a total installed
capacity of 116.60 megawatts; (2) a 3.6mile-long, 69 kilovolt transmission line;
and (3) appurtenant facilities. The
proposed Georgetown Bend
Hydrokinetic Project would have an
average annual generation of 511
gigawatt-hours.
Applicant Contact: Ramya
Swaminathan, Vice President of
Development, Free Flow Power
Corporation, 33 Commercial Street,
Gloucester, MA 01930; phone: (978)
226–1531.
FERC Contact: Kim Carter, 202–502–
6486.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project, including a copy of the
application, can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13484) in the docket number field to
access the document. For assistance,
call toll-free 1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–16849 Filed 7–15–09; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00015
Fmt 4703
Sfmt 4703
34563
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13486–000]
FFP Project 76, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
July 9, 2009.
On May 22, 2009, FFP Project 76, LLC
filed an application for a preliminary
permit, pursuant to section 4(f) of the
Federal Power Act, proposing to study
the feasibility of the Burke Landing
Hydrokinetic Project, to be located on
the Mississippi River, in Phillips
County, Arkansas and Coahoma County,
Mississippi.
The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any land
disturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed Burke Landing
Hydrokinetic Project consists of: (1)
2,028 proposed 40 kilowatt Free Flow
generating units having a total installed
capacity of 81.12 megawatts; (2) a 2.2mile-long, 69 kilovolt transmission line;
and (3) appurtenant facilities. The
proposed Burke Landing Hydrokinetic
Project would have an average annual
generation of 355 gigawatt-hours.
Applicant Contact: Ramya
Swaminathan, Vice President of
Development, Free Flow Power
Corporation, 33 Commercial Street,
Gloucester, MA 01930; phone: (978)
226–1531.
FERC Contact: Kim Carter, 202–502–
6486.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
E:\FR\FM\16JYN1.SGM
16JYN1
Agencies
[Federal Register Volume 74, Number 135 (Thursday, July 16, 2009)]
[Notices]
[Page 34563]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-16849]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13484-000]
FFP Project 73, LLC; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
July 9, 2009.
On May 22, 2009, FFP Project 73, LLC filed an application for a
preliminary permit, pursuant to section 4(f) of the Federal Power Act,
proposing to study the feasibility of the Georgetown Bend Hydrokinetic
Project, to be located on the Mississippi River, in Desha and Chicot
Counties, Arkansas and Bolivar and Washington Counties, Mississippi.
The sole purpose of a preliminary permit, if issued, is to grant
the permit holder priority to file a license application during the
permit term. A preliminary permit does not authorize the permit holder
to perform any land disturbing activities or otherwise enter upon lands
or waters owned by others without the owners' express permission.
The proposed Georgetown Bend Hydrokinetic Project consists of: (1)
2,915 proposed 40 kilowatt Free Flow generating units having a total
installed capacity of 116.60 megawatts; (2) a 3.6-mile-long, 69
kilovolt transmission line; and (3) appurtenant facilities. The
proposed Georgetown Bend Hydrokinetic Project would have an average
annual generation of 511 gigawatt-hours.
Applicant Contact: Ramya Swaminathan, Vice President of
Development, Free Flow Power Corporation, 33 Commercial Street,
Gloucester, MA 01930; phone: (978) 226-1531.
FERC Contact: Kim Carter, 202-502-6486.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Comments, motions to intervene, notices of intent, and competing
applications may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and eight
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For
more information on how to submit these types of filings please go to
the Commission's Web site located at https://www.ferc.gov/filing-comments.asp. More information about this project, including a copy of
the application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-13484) in the docket number field to access
the document. For assistance, call toll-free 1-866-208-3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-16849 Filed 7-15-09; 8:45 am]
BILLING CODE 6717-01-P