FFP Project 65, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 34323 [E9-16722]

Download as PDF Federal Register / Vol. 74, No. 134 / Wednesday, July 15, 2009 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13476–000] FFP Project 65, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications sroberts on DSKD5P82C1PROD with NOTICES July 8, 2009. On May 22, 2009, FFP Project 65, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Jackson Point Hydrokinetic Project, to be located on the Mississippi River, in Concordia Parish, Louisiana and Adams County, Mississippi. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed Jackson Point Hydrokinetic Project consists of: (1) 4,435 proposed 40 kilowatt Free Flow generating units having a total installed capacity of 177.40 megawatts; (2) a 6mile-long, 69 kilovolt transmission line; and (3) appurtenant facilities. The proposed Jackson Point Hydrokinetic Project would have an average annual generation of 777 gigawatt-hours. Applicant Contact: Ramya Swaminathan, Vice President of Development, Free Flow Power Corporation, 33 Commercial Street, Gloucester, MA 01930; phone: (978) 226–1531. FERC Contact: Kim Carter, 202–502– 6486. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the VerDate Nov<24>2008 17:21 Jul 14, 2009 Jkt 217001 Commission’s Web site located at https://www.ferc.gov/filingcomments.asp. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–13476) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3372. Kimberly D. Bose, Secretary. [FR Doc. E9–16722 Filed 7–14–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13477–000] FFP Project 67, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications July 8, 2009. On May 22, 2009, FFP Project 67, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Bondurant Chute Hydrokinetic Project, to be located on the Mississippi River, in Tensas Parish, Louisiana and Claiborne County, Mississippi. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land disturbing activities or otherwise enter upon lands or waters owned by others without the owners’ express permission. The proposed Bondurant Chute Hydrokinetic Project consists of: (1) 3,802 proposed 40 kilowatt Free Flow generating units having a total installed capacity of 152.08 megawatts; (2) a 5mile-long, 69 kilovolt transmission line; and (3) appurtenant facilities. The proposed Bondurant Chute Hydrokinetic Project would have an average annual generation of 666 gigawatt-hours. Applicant Contact: Ramya Swaminathan, Vice President of Development, Free Flow Power Corporation, 33 Commercial Street, Gloucester, MA 01930; phone: (978) 226–1531. FERC Contact: Kim Carter, 202–502– 6486. PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 34323 Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https://www.ferc.gov/filingcomments.asp.. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–13477) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3372. Kimberly D. Bose, Secretary. [FR Doc. E9–16723 Filed 7–14–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12662–002] Renewable Resources, Inc.; Notice of Application Tendered for Filing With the Commission, Soliciting Additional Study Requests, and Establishing Procedual Schedule for Licensing and Deadline for Submission of Final Amendments July 8, 2009. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Exemption From Licensing. b. Project No.: P–12662–002. c. Date Filed: July 1, 2009. d. Applicant: Renewable Resources, Inc. e. Name of Project: Swift River Mill Hydroelectric Project. f. Location: On the Pawcatuck River in Washington County, Rhode Island. The project would not occupy lands of the United States. E:\FR\FM\15JYN1.SGM 15JYN1

Agencies

[Federal Register Volume 74, Number 134 (Wednesday, July 15, 2009)]
[Notices]
[Page 34323]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-16722]



[[Page 34323]]

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13476-000]


FFP Project 65, LLC; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

July 8, 2009.
    On May 22, 2009, FFP Project 65, LLC filed an application for a 
preliminary permit, pursuant to section 4(f) of the Federal Power Act, 
proposing to study the feasibility of the Jackson Point Hydrokinetic 
Project, to be located on the Mississippi River, in Concordia Parish, 
Louisiana and Adams County, Mississippi.
    The sole purpose of a preliminary permit, if issued, is to grant 
the permit holder priority to file a license application during the 
permit term. A preliminary permit does not authorize the permit holder 
to perform any land disturbing activities or otherwise enter upon lands 
or waters owned by others without the owners' express permission.
    The proposed Jackson Point Hydrokinetic Project consists of: (1) 
4,435 proposed 40 kilowatt Free Flow generating units having a total 
installed capacity of 177.40 megawatts; (2) a 6-mile-long, 69 kilovolt 
transmission line; and (3) appurtenant facilities. The proposed Jackson 
Point Hydrokinetic Project would have an average annual generation of 
777 gigawatt-hours.
    Applicant Contact: Ramya Swaminathan, Vice President of 
Development, Free Flow Power Corporation, 33 Commercial Street, 
Gloucester, MA 01930; phone: (978) 226-1531.
    FERC Contact: Kim Carter, 202-502-6486.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Comments, motions to intervene, notices of intent, and competing 
applications may be filed electronically via the Internet. See 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
under the ``e-Filing'' link. If unable to be filed electronically, 
documents may be paper-filed. To paper-file, an original and eight 
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For 
more information on how to submit these types of filings please go to 
the Commission's Web site located at https://www.ferc.gov/filing-comments.asp. More information about this project, including a copy of 
the application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-13476) in the docket number field to access 
the document. For assistance, call toll-free 1-866-208-3372.

Kimberly D. Bose,
Secretary.
 [FR Doc. E9-16722 Filed 7-14-09; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.