FFP Project 62, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 34003-34004 [E9-16563]
Download as PDF
Federal Register / Vol. 74, No. 133 / Tuesday, July 14, 2009 / Notices
L. No. 92–463, 86 Stat. 770) requires
that public notice of this meeting be
announced in the Federal Register.
DATES: Thursday, August 6, 2009. 6:
p.m.
Ohio State University,
Endeavor Center, 1862 Shyville Road,
Piketon, Ohio 45661.
FOR FURTHER INFORMATION CONTACT:
David Kozlowski, Deputy Designated
Federal Officer, Department of Energy
Portsmouth/Paducah Project Office, Post
Office Box 700, Piketon, Ohio 45661,
(740) 897–2759,
David.Kozlowski@lex.doe.gov.
ADDRESSES:
mstockstill on DSKH9S0YB1PROD with NOTICES
SUPPLEMENTARY INFORMATION:
Purpose of the Board: The purpose of
the Board is to make recommendations
to DOE in the areas of environmental
restoration, waste management and
related activities.
Tentative Agenda:
• Call to Order, Introductions, Review
of Agenda.
• Approval of June Meeting Minutes.
• Election of Co-chairs for Fiscal Year
2010.
• Public Comments.
• Deputy Designated Federal Officer’s
Comments.
• Federal Coordinator’s Comments.
• Liaisons’ Comments.
• Presentations.
• Administrative Issues:
• Committee Updates.
• Public Comments.
• Final Comments.
• Adjourn.
Breaks taken as appropriate.
Public Participation: The meeting is
open to the public. The EM SSAB,
Portsmouth, welcomes the attendance of
the public at its advisory committee
meetings and will make every effort to
accommodate persons with physical
disabilities or special needs. If you
require special accommodations due to
a disability, please contact David
Kozlowski at least seven days in
advance of the meeting at the phone
number listed above. Written statements
may be filed with the Board either
before or after the meeting. Individuals
who wish to make oral statements
pertaining to agenda items should
contact David Kozlowski at the address
or telephone number listed above.
Requests must be received five days
prior to the meeting and reasonable
provision will be made to include the
presentation in the agenda. The Deputy
Designated Federal Officer is
empowered to conduct the meeting in a
fashion that will facilitate the orderly
conduct of business. Individuals
wishing to make public comment will
be provided a maximum of five minutes
to present their comments.
VerDate Nov<24>2008
17:50 Jul 13, 2009
Jkt 217001
Minutes: Minutes will be available by
writing or calling David Kozlowski at
the address and phone number listed
above. Minutes will also be available at
the following Web site: https://
www.ports-ssab.org/
publicmeetings.html.
Issued at Washington, DC, on July 7, 2009.
Rachel Samuel,
Deputy Committee Management Officer.
[FR Doc. E9–16638 Filed 7–13–09; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13471–000]
FFP Project 61, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
July 7, 2009.
On May 22, 2009, FFP Project 61, LLC
filed an application for a preliminary
permit, pursuant to section 4(f) of the
Federal Power Act, proposing to study
the feasibility of the Point Menoir
Hydrokinetic Project, to be located on
the Mississippi River in West Baton
Rouge Parish, Louisiana and East Baton
Rouge Parish, Louisiana.
The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any land
disturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed Point Menoir
Hydrokinetic Project consists of: (1)
1,647 proposed 40 kilowatt Free Flow
generating units having a total installed
capacity of 65.88 megawatts; (2) a 1.6mile-long, 69 kilovolt transmission line;
and (3) appurtenant facilities. The
proposed Point Menoir Hydrokinetic
Project would have an average annual
generation of 289 gigawatt-hours.
Applicant Contact: Ramya
Swaminathan, Vice President of
Development, Free Flow Power
Corporation, 33 Commercial Street,
Gloucester, MA 01930; phone: (978)
226–1531.
FERC Contact: Kim Carter, 202–502–
6486.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
34003
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project, including a copy of the
application, can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–13471) in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–16562 Filed 7–13–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13472–000]
FFP Project 62, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
July 7, 2009.
On May 22, 2009, FFP Project 62, LLC
filed an application for a preliminary
permit, pursuant to section 4(f) of the
Federal Power Act, proposing to study
the feasibility of the Raccourci Island
Hydrokinetic Project, to be located on
the Mississippi River, in Pointe Coupee
Parish, Louisiana and West Feliciana
Parish, Louisiana.
The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any land
disturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed Raccourci Island
Hydrokinetic Project consists of: (1)
4,435 proposed 40 kilowatt Free Flow
generating units having a total installed
E:\FR\FM\14JYN1.SGM
14JYN1
34004
Federal Register / Vol. 74, No. 133 / Tuesday, July 14, 2009 / Notices
capacity of 177.4 megawatts; (2) a 6mile-long, 69 kilovolt transmission line;
and (3) appurtenant facilities. The
proposed Raccourci Island Hydrokinetic
Project would have an average annual
generation of 777 gigawatt-hours.
Applicant Contact: Ramya
Swaminathan, Vice President of
Development, Free Flow Power
Corporation, 33 Commercial Street,
Gloucester, MA 01930; phone: (978)
226–1531.
FERC Contact: Kim Carter, 202–502–
6486.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project, including a copy of the
application, can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13472) in the docket number field to
access the document. For assistance,
call toll-free 1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–16563 Filed 7–13–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Kimberly D. Bose,
Secretary.
[FR Doc. E9–16555 Filed 7–13–09; 8:45 am]
Federal Energy Regulatory
Commission
BILLING CODE 6717–01–P
[Docket No. RM08–7–003]
mstockstill on DSKH9S0YB1PROD with NOTICES
transmission loading relief, in
compliance with Commission Order No.
713–A,1 issued March 19, 2009, in
Docket Nos. RM08–7–000 and RM08–7–
001.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on July 27, 2009.
North American Electric Reliability
Corporation; Notice of Compliance
Filing
July 7, 2009.
Take notice that on June 22, 2009,
North American Reliability Corporation
submitted revisions to Violation Risk
Factors for Reliability Standard IRO–
006–4, regarding interchange and
VerDate Nov<24>2008
17:50 Jul 13, 2009
Jkt 217001
1 Modification of Interchange and Transmission
Loading Relief Reliability Standards; and Electric
Reliability Organization Interpretation of Specific
Requirements of Four Reliability Standards, 126
FERC ¶ 61,252 (2009) (Order No. 713–A).
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER09–1339–000]
Grand Ridge Energy II LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
July 7, 2009.
This is a supplemental notice in the
above-referenced proceeding of Grand
Ridge Energy II LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is July 27,
2009.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
E:\FR\FM\14JYN1.SGM
14JYN1
Agencies
[Federal Register Volume 74, Number 133 (Tuesday, July 14, 2009)]
[Notices]
[Pages 34003-34004]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-16563]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13472-000]
FFP Project 62, LLC; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
July 7, 2009.
On May 22, 2009, FFP Project 62, LLC filed an application for a
preliminary permit, pursuant to section 4(f) of the Federal Power Act,
proposing to study the feasibility of the Raccourci Island Hydrokinetic
Project, to be located on the Mississippi River, in Pointe Coupee
Parish, Louisiana and West Feliciana Parish, Louisiana.
The sole purpose of a preliminary permit, if issued, is to grant
the permit holder priority to file a license application during the
permit term. A preliminary permit does not authorize the permit holder
to perform any land disturbing activities or otherwise enter upon lands
or waters owned by others without the owners' express permission.
The proposed Raccourci Island Hydrokinetic Project consists of: (1)
4,435 proposed 40 kilowatt Free Flow generating units having a total
installed
[[Page 34004]]
capacity of 177.4 megawatts; (2) a 6-mile-long, 69 kilovolt
transmission line; and (3) appurtenant facilities. The proposed
Raccourci Island Hydrokinetic Project would have an average annual
generation of 777 gigawatt-hours.
Applicant Contact: Ramya Swaminathan, Vice President of
Development, Free Flow Power Corporation, 33 Commercial Street,
Gloucester, MA 01930; phone: (978) 226-1531.
FERC Contact: Kim Carter, 202-502-6486.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Comments, motions to intervene, notices of intent, and competing
applications may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and eight
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For
more information on how to submit these types of filings please go to
the Commission's Web site located at https://www.ferc.gov/filing-comments.asp. More information about this project, including a copy of
the application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-13472) in the docket number field to access
the document. For assistance, call toll-free 1-866-208-3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-16563 Filed 7-13-09; 8:45 am]