FFP Project 61, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 34003 [E9-16562]
Download as PDF
Federal Register / Vol. 74, No. 133 / Tuesday, July 14, 2009 / Notices
L. No. 92–463, 86 Stat. 770) requires
that public notice of this meeting be
announced in the Federal Register.
DATES: Thursday, August 6, 2009. 6:
p.m.
Ohio State University,
Endeavor Center, 1862 Shyville Road,
Piketon, Ohio 45661.
FOR FURTHER INFORMATION CONTACT:
David Kozlowski, Deputy Designated
Federal Officer, Department of Energy
Portsmouth/Paducah Project Office, Post
Office Box 700, Piketon, Ohio 45661,
(740) 897–2759,
David.Kozlowski@lex.doe.gov.
ADDRESSES:
mstockstill on DSKH9S0YB1PROD with NOTICES
SUPPLEMENTARY INFORMATION:
Purpose of the Board: The purpose of
the Board is to make recommendations
to DOE in the areas of environmental
restoration, waste management and
related activities.
Tentative Agenda:
• Call to Order, Introductions, Review
of Agenda.
• Approval of June Meeting Minutes.
• Election of Co-chairs for Fiscal Year
2010.
• Public Comments.
• Deputy Designated Federal Officer’s
Comments.
• Federal Coordinator’s Comments.
• Liaisons’ Comments.
• Presentations.
• Administrative Issues:
• Committee Updates.
• Public Comments.
• Final Comments.
• Adjourn.
Breaks taken as appropriate.
Public Participation: The meeting is
open to the public. The EM SSAB,
Portsmouth, welcomes the attendance of
the public at its advisory committee
meetings and will make every effort to
accommodate persons with physical
disabilities or special needs. If you
require special accommodations due to
a disability, please contact David
Kozlowski at least seven days in
advance of the meeting at the phone
number listed above. Written statements
may be filed with the Board either
before or after the meeting. Individuals
who wish to make oral statements
pertaining to agenda items should
contact David Kozlowski at the address
or telephone number listed above.
Requests must be received five days
prior to the meeting and reasonable
provision will be made to include the
presentation in the agenda. The Deputy
Designated Federal Officer is
empowered to conduct the meeting in a
fashion that will facilitate the orderly
conduct of business. Individuals
wishing to make public comment will
be provided a maximum of five minutes
to present their comments.
VerDate Nov<24>2008
17:50 Jul 13, 2009
Jkt 217001
Minutes: Minutes will be available by
writing or calling David Kozlowski at
the address and phone number listed
above. Minutes will also be available at
the following Web site: https://
www.ports-ssab.org/
publicmeetings.html.
Issued at Washington, DC, on July 7, 2009.
Rachel Samuel,
Deputy Committee Management Officer.
[FR Doc. E9–16638 Filed 7–13–09; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13471–000]
FFP Project 61, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
July 7, 2009.
On May 22, 2009, FFP Project 61, LLC
filed an application for a preliminary
permit, pursuant to section 4(f) of the
Federal Power Act, proposing to study
the feasibility of the Point Menoir
Hydrokinetic Project, to be located on
the Mississippi River in West Baton
Rouge Parish, Louisiana and East Baton
Rouge Parish, Louisiana.
The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any land
disturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed Point Menoir
Hydrokinetic Project consists of: (1)
1,647 proposed 40 kilowatt Free Flow
generating units having a total installed
capacity of 65.88 megawatts; (2) a 1.6mile-long, 69 kilovolt transmission line;
and (3) appurtenant facilities. The
proposed Point Menoir Hydrokinetic
Project would have an average annual
generation of 289 gigawatt-hours.
Applicant Contact: Ramya
Swaminathan, Vice President of
Development, Free Flow Power
Corporation, 33 Commercial Street,
Gloucester, MA 01930; phone: (978)
226–1531.
FERC Contact: Kim Carter, 202–502–
6486.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
34003
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project, including a copy of the
application, can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at https://www.ferc.gov/docsfiling/elibrary.asp. Enter the docket
number (P–13471) in the docket number
field to access the document. For
assistance, call toll-free 1–866–208–
3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–16562 Filed 7–13–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 13472–000]
FFP Project 62, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
July 7, 2009.
On May 22, 2009, FFP Project 62, LLC
filed an application for a preliminary
permit, pursuant to section 4(f) of the
Federal Power Act, proposing to study
the feasibility of the Raccourci Island
Hydrokinetic Project, to be located on
the Mississippi River, in Pointe Coupee
Parish, Louisiana and West Feliciana
Parish, Louisiana.
The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any land
disturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed Raccourci Island
Hydrokinetic Project consists of: (1)
4,435 proposed 40 kilowatt Free Flow
generating units having a total installed
E:\FR\FM\14JYN1.SGM
14JYN1
Agencies
[Federal Register Volume 74, Number 133 (Tuesday, July 14, 2009)]
[Notices]
[Page 34003]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-16562]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13471-000]
FFP Project 61, LLC; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
July 7, 2009.
On May 22, 2009, FFP Project 61, LLC filed an application for a
preliminary permit, pursuant to section 4(f) of the Federal Power Act,
proposing to study the feasibility of the Point Menoir Hydrokinetic
Project, to be located on the Mississippi River in West Baton Rouge
Parish, Louisiana and East Baton Rouge Parish, Louisiana.
The sole purpose of a preliminary permit, if issued, is to grant
the permit holder priority to file a license application during the
permit term. A preliminary permit does not authorize the permit holder
to perform any land disturbing activities or otherwise enter upon lands
or waters owned by others without the owners' express permission.
The proposed Point Menoir Hydrokinetic Project consists of: (1)
1,647 proposed 40 kilowatt Free Flow generating units having a total
installed capacity of 65.88 megawatts; (2) a 1.6-mile-long, 69 kilovolt
transmission line; and (3) appurtenant facilities. The proposed Point
Menoir Hydrokinetic Project would have an average annual generation of
289 gigawatt-hours.
Applicant Contact: Ramya Swaminathan, Vice President of
Development, Free Flow Power Corporation, 33 Commercial Street,
Gloucester, MA 01930; phone: (978) 226-1531.
FERC Contact: Kim Carter, 202-502-6486.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Comments, motions to intervene, notices of intent, and competing
applications may be filed electronically via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions on the Commission's Web site
under the ``e-Filing'' link. If unable to be filed electronically,
documents may be paper-filed. To paper-file, an original and eight
copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For
more information on how to submit these types of filings please go to
the Commission's Web site located at https://www.ferc.gov/filing-comments.asp. More information about this project, including a copy of
the application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-13471) in the docket number field to access
the document. For assistance, call toll-free 1-866-208-3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-16562 Filed 7-13-09; 8:45 am]
BILLING CODE 6717-01-P