North American Electric Reliability Corporation; Notice of Compliance Filing, 34004 [E9-16555]

Download as PDF 34004 Federal Register / Vol. 74, No. 133 / Tuesday, July 14, 2009 / Notices capacity of 177.4 megawatts; (2) a 6mile-long, 69 kilovolt transmission line; and (3) appurtenant facilities. The proposed Raccourci Island Hydrokinetic Project would have an average annual generation of 777 gigawatt-hours. Applicant Contact: Ramya Swaminathan, Vice President of Development, Free Flow Power Corporation, 33 Commercial Street, Gloucester, MA 01930; phone: (978) 226–1531. FERC Contact: Kim Carter, 202–502– 6486. Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site under the ‘‘e-Filing’’ link. If unable to be filed electronically, documents may be paperfiled. To paper-file, an original and eight copies should be mailed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. For more information on how to submit these types of filings please go to the Commission’s Web site located at https://www.ferc.gov/filingcomments.asp. More information about this project, including a copy of the application, can be viewed or printed on the ‘‘eLibrary’’ link of Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P–13472) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3372. Kimberly D. Bose, Secretary. [FR Doc. E9–16563 Filed 7–13–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Kimberly D. Bose, Secretary. [FR Doc. E9–16555 Filed 7–13–09; 8:45 am] Federal Energy Regulatory Commission BILLING CODE 6717–01–P [Docket No. RM08–7–003] mstockstill on DSKH9S0YB1PROD with NOTICES transmission loading relief, in compliance with Commission Order No. 713–A,1 issued March 19, 2009, in Docket Nos. RM08–7–000 and RM08–7– 001. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. On or before the comment date, it is not necessary to serve motions to intervene or protests on persons other than the Applicant. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 14 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please e-mail FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5 p.m. Eastern Time on July 27, 2009. North American Electric Reliability Corporation; Notice of Compliance Filing July 7, 2009. Take notice that on June 22, 2009, North American Reliability Corporation submitted revisions to Violation Risk Factors for Reliability Standard IRO– 006–4, regarding interchange and VerDate Nov<24>2008 17:50 Jul 13, 2009 Jkt 217001 1 Modification of Interchange and Transmission Loading Relief Reliability Standards; and Electric Reliability Organization Interpretation of Specific Requirements of Four Reliability Standards, 126 FERC ¶ 61,252 (2009) (Order No. 713–A). PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER09–1339–000] Grand Ridge Energy II LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization July 7, 2009. This is a supplemental notice in the above-referenced proceeding of Grand Ridge Energy II LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is July 27, 2009. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 14 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First St., NE., Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive e-mail notification when a document is added to a subscribed E:\FR\FM\14JYN1.SGM 14JYN1

Agencies

[Federal Register Volume 74, Number 133 (Tuesday, July 14, 2009)]
[Notices]
[Page 34004]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-16555]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. RM08-7-003]


North American Electric Reliability Corporation; Notice of 
Compliance Filing

July 7, 2009.
    Take notice that on June 22, 2009, North American Reliability 
Corporation submitted revisions to Violation Risk Factors for 
Reliability Standard IRO-006-4, regarding interchange and transmission 
loading relief, in compliance with Commission Order No. 713-A,\1\ 
issued March 19, 2009, in Docket Nos. RM08-7-000 and RM08-7-001.
---------------------------------------------------------------------------

    \1\ Modification of Interchange and Transmission Loading Relief 
Reliability Standards; and Electric Reliability Organization 
Interpretation of Specific Requirements of Four Reliability 
Standards, 126 FERC ] 61,252 (2009) (Order No. 713-A).
---------------------------------------------------------------------------

    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. On or 
before the comment date, it is not necessary to serve motions to 
intervene or protests on persons other than the Applicant.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an 
original and 14 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street, NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive e-mail 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please e-mail 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5 p.m. Eastern Time on July 27, 2009.

Kimberly D. Bose,
Secretary.
 [FR Doc. E9-16555 Filed 7-13-09; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.