North American Electric Reliability Corporation; Notice of Compliance Filing, 34004 [E9-16555]
Download as PDF
34004
Federal Register / Vol. 74, No. 133 / Tuesday, July 14, 2009 / Notices
capacity of 177.4 megawatts; (2) a 6mile-long, 69 kilovolt transmission line;
and (3) appurtenant facilities. The
proposed Raccourci Island Hydrokinetic
Project would have an average annual
generation of 777 gigawatt-hours.
Applicant Contact: Ramya
Swaminathan, Vice President of
Development, Free Flow Power
Corporation, 33 Commercial Street,
Gloucester, MA 01930; phone: (978)
226–1531.
FERC Contact: Kim Carter, 202–502–
6486.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Comments, motions to intervene,
notices of intent, and competing
applications may be filed electronically
via the Internet. See 18 CFR
385.2001(a)(1)(iii) and the instructions
on the Commission’s Web site under the
‘‘e-Filing’’ link. If unable to be filed
electronically, documents may be paperfiled. To paper-file, an original and eight
copies should be mailed to: Kimberly D.
Bose, Secretary, Federal Energy
Regulatory Commission, 888 First
Street, NE., Washington, DC 20426. For
more information on how to submit
these types of filings please go to the
Commission’s Web site located at
https://www.ferc.gov/filingcomments.asp. More information about
this project, including a copy of the
application, can be viewed or printed on
the ‘‘eLibrary’’ link of Commission’s
Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–13472) in the docket number field to
access the document. For assistance,
call toll-free 1–866–208–3372.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–16563 Filed 7–13–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Kimberly D. Bose,
Secretary.
[FR Doc. E9–16555 Filed 7–13–09; 8:45 am]
Federal Energy Regulatory
Commission
BILLING CODE 6717–01–P
[Docket No. RM08–7–003]
mstockstill on DSKH9S0YB1PROD with NOTICES
transmission loading relief, in
compliance with Commission Order No.
713–A,1 issued March 19, 2009, in
Docket Nos. RM08–7–000 and RM08–7–
001.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 14 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5 p.m. Eastern Time
on July 27, 2009.
North American Electric Reliability
Corporation; Notice of Compliance
Filing
July 7, 2009.
Take notice that on June 22, 2009,
North American Reliability Corporation
submitted revisions to Violation Risk
Factors for Reliability Standard IRO–
006–4, regarding interchange and
VerDate Nov<24>2008
17:50 Jul 13, 2009
Jkt 217001
1 Modification of Interchange and Transmission
Loading Relief Reliability Standards; and Electric
Reliability Organization Interpretation of Specific
Requirements of Four Reliability Standards, 126
FERC ¶ 61,252 (2009) (Order No. 713–A).
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER09–1339–000]
Grand Ridge Energy II LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
July 7, 2009.
This is a supplemental notice in the
above-referenced proceeding of Grand
Ridge Energy II LLC’s application for
market-based rate authority, with an
accompanying rate tariff, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability, is July 27,
2009.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 14 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First St., NE., Washington, DC
20426.
The filings in the above-referenced
proceeding are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive e-mail notification when a
document is added to a subscribed
E:\FR\FM\14JYN1.SGM
14JYN1
Agencies
[Federal Register Volume 74, Number 133 (Tuesday, July 14, 2009)]
[Notices]
[Page 34004]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-16555]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. RM08-7-003]
North American Electric Reliability Corporation; Notice of
Compliance Filing
July 7, 2009.
Take notice that on June 22, 2009, North American Reliability
Corporation submitted revisions to Violation Risk Factors for
Reliability Standard IRO-006-4, regarding interchange and transmission
loading relief, in compliance with Commission Order No. 713-A,\1\
issued March 19, 2009, in Docket Nos. RM08-7-000 and RM08-7-001.
---------------------------------------------------------------------------
\1\ Modification of Interchange and Transmission Loading Relief
Reliability Standards; and Electric Reliability Organization
Interpretation of Specific Requirements of Four Reliability
Standards, 126 FERC ] 61,252 (2009) (Order No. 713-A).
---------------------------------------------------------------------------
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date. On or
before the comment date, it is not necessary to serve motions to
intervene or protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 14 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive e-mail
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please e-mail
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5 p.m. Eastern Time on July 27, 2009.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-16555 Filed 7-13-09; 8:45 am]
BILLING CODE 6717-01-P