Alabama Power Company; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests, 33430 [E9-16442]
Download as PDF
33430
Federal Register / Vol. 74, No. 132 / Monday, July 13, 2009 / Notices
facilities and/or touring Lake Harding
must send an e-mail to Bartletts Ferry
Relicensing, at bfrelice@southerco.com,
by July 24, 2009. Please indicate if you
want to visit the project facilities, tour
Lake Harding, or both. Participants of
the tours must provide identification,
sign a liability waiver, and wear
appropriate clothing and closed toed
shoes. If any participant attending any
part of the sites visit is disabled or has
special needs, please e-mail Bartletts
Ferry Relicensing, at
bfrelice@southerco.com.
Meeting Objectives
At the scoping meetings, staff will: (1)
Initiate scoping of the issues; (2) review
and discuss existing conditions and
resource management objectives; (3)
review and discuss existing information
and identify preliminary information
and study needs; (4) review and discuss
the process plan and schedule for prefiling activity that incorporates the time
frames provided for in Part 5 of the
Commission’s regulations and, to the
extent possible, maximizes coordination
of federal, state, and tribal permitting
and certification processes; and (5)
discuss the appropriateness of any
federal or state agency or Indian tribe
acting as a cooperating agency for
development of an environmental
document.
Meeting participants should come
prepared to discuss their issues and/or
concerns. Please review the PAD in
preparation for the scoping meetings.
Directions on how to obtain a copy of
the PAD and SD1 are included in item
n. of this notice.
Meeting Procedures
The meetings will be recorded by a
stenographer and will become part of
the formal record of the Commission
proceeding on the project.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–16444 Filed 7–10–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
mstockstill on DSKH9S0YB1PROD with NOTICES
[Project No. 2165–029]
Alabama Power Company; Notice of
Application for Amendment of License
and Soliciting Comments, Motions To
Intervene, and Protests
July 2, 2009.
a. Type of Application: Non-project
use of project lands and waters.
VerDate Nov<24>2008
18:36 Jul 10, 2009
Jkt 217001
b. Project Number: 2165–029.
c. Date Filed: June 5, 2009.
d. Applicant: Alabama Power
Company.
e. Name of Project: Warrior River
Hydroelectric Project.
f. Location: The project is located on
Sipsley Fork and the Black Warrior
River in Cullman, Tuscaloosa, Walker,
and Winston Counties, Alabama. The
proposed action would occur at the
Lewis Smith Development in Cullman
County.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a), 825(r) and 799
and 801.
h. Applicant Contact: Mr. Jason
Powers, Alabama Power Company, 600
18th Street North, Birmingham,
Alabama 35203, telephone: (205) 257–
4070.
i. FERC Contact: Any questions on
this notice should be addressed to
Christopher Yeakel at (202) 502–8132,
or e-mail address:
christopher.yeakel@ferc.gov.
j. Deadline for filing comments and or
motions: August 3, 2009.
k. Description of Request: Alabama
Power Company proposes to permit Mr.
Lynn Layton to replace one existing,
covered, 10-slip boat dock with three
covered boat docks, each with 10 slips
at Cushman’s Marina, located on the
Warrior River Project. Each dock would
consist of: (1) A 50-foot-long ramp; (2)
an equalizing platform; (3) a 78-footlong central walkway; and (4) ten 12foot-wide by 28-foot-long slips.
Navigational lighting would be installed
on each dock. No fuel-dispensing or
sewage-pumping facilities are proposed.
The docks would be available for rental
by the general public. The licensee also
proposes to allow the removal of an
existing building at the site, and the
construction of a new patio within the
project boundary.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field (p-2165) to
access the document. You may also
register online at https://www.ferc.gov/
docs-filing/esubscription.asp to be
notified via e-mail of new filings and
issuances related to this or other
pending projects. For assistance, call
1–866–208–3372 or e-mail
FERCOnlineSupport@ferc.gov, for TTY,
call (202) 502–8659. A copy is also
PO 00000
Frm 00026
Fmt 4703
Sfmt 4703
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene—Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents—Any filings must bear in
all capital letters the title
‘‘COMMENTS’’,
‘‘RECOMMENDATIONS FOR TERMS
AND CONDITIONS’’, ‘‘PROTEST’’, OR
‘‘MOTION TO INTERVENE’’, as
applicable, and the Project Number of
the particular application to which the
filing refers (P–2165–029). All
documents (original and eight copies)
should be filed with: The Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426. A copy of any motion to
intervene must also be served upon each
representative of the Applicant
specified in the particular application.
p. Agency Comments—Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
q. Comments, protests and
interventions may be filed electronically
via the Internet in lieu of paper. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov under the
‘‘e-Filing’’ link.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–16442 Filed 7–10–09; 8:45 am]
BILLING CODE 6717–01–P
E:\FR\FM\13JYN1.SGM
13JYN1
Agencies
[Federal Register Volume 74, Number 132 (Monday, July 13, 2009)]
[Notices]
[Page 33430]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-16442]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2165-029]
Alabama Power Company; Notice of Application for Amendment of
License and Soliciting Comments, Motions To Intervene, and Protests
July 2, 2009.
a. Type of Application: Non-project use of project lands and
waters.
b. Project Number: 2165-029.
c. Date Filed: June 5, 2009.
d. Applicant: Alabama Power Company.
e. Name of Project: Warrior River Hydroelectric Project.
f. Location: The project is located on Sipsley Fork and the Black
Warrior River in Cullman, Tuscaloosa, Walker, and Winston Counties,
Alabama. The proposed action would occur at the Lewis Smith Development
in Cullman County.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a), 825(r)
and 799 and 801.
h. Applicant Contact: Mr. Jason Powers, Alabama Power Company, 600
18th Street North, Birmingham, Alabama 35203, telephone: (205) 257-
4070.
i. FERC Contact: Any questions on this notice should be addressed
to Christopher Yeakel at (202) 502-8132, or e-mail address:
christopher.yeakel@ferc.gov.
j. Deadline for filing comments and or motions: August 3, 2009.
k. Description of Request: Alabama Power Company proposes to permit
Mr. Lynn Layton to replace one existing, covered, 10-slip boat dock
with three covered boat docks, each with 10 slips at Cushman's Marina,
located on the Warrior River Project. Each dock would consist of: (1) A
50-foot-long ramp; (2) an equalizing platform; (3) a 78-foot-long
central walkway; and (4) ten 12-foot-wide by 28-foot-long slips.
Navigational lighting would be installed on each dock. No fuel-
dispensing or sewage-pumping facilities are proposed. The docks would
be available for rental by the general public. The licensee also
proposes to allow the removal of an existing building at the site, and
the construction of a new patio within the project boundary.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street, NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field (p-2165) to access the document. You
may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
call 1-866-208-3372 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call
(202) 502-8659. A copy is also available for inspection and
reproduction at the address in item (h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene--Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents--Any filings must
bear in all capital letters the title ``COMMENTS'', ``RECOMMENDATIONS
FOR TERMS AND CONDITIONS'', ``PROTEST'', OR ``MOTION TO INTERVENE'', as
applicable, and the Project Number of the particular application to
which the filing refers (P-2165-029). All documents (original and eight
copies) should be filed with: The Secretary, Federal Energy Regulatory
Commission, 888 First Street, NE., Washington, DC 20426. A copy of any
motion to intervene must also be served upon each representative of the
Applicant specified in the particular application.
p. Agency Comments--Federal, state, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
q. Comments, protests and interventions may be filed electronically
via the Internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and
the instructions on the Commission's Web site at https://www.ferc.gov
under the ``e-Filing'' link.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-16442 Filed 7-10-09; 8:45 am]
BILLING CODE 6717-01-P