Grand River Dam Authority; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests, 32902 [E9-16160]
Download as PDF
32902
Federal Register / Vol. 74, No. 130 / Thursday, July 9, 2009 / Notices
Milestone
Filing of recommendations,
preliminary terms
and conditions, and
fishway prescriptions.
Commission issues
Draft EA.
Comments on Draft
EA.
Filing Modified Terms
and Conditions.
Commission Issues
Final EA.
Target date
November 26, 2009.
July 9, 2010.
August 8, 2010.
October 7, 2010.
January 5, 2011.
o. Final amendments to the
application must be filed with the
Commission no later than 30 days from
the issuance date of the notice of ready
for environmental analysis.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–16158 Filed 7–8–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 1494–376]
Grand River Dam Authority; Notice of
Application for Amendment of License
and Soliciting Comments, Motions To
Intervene, and Protests
rmajette on DSK29S0YB1 with NOTICES
July 1, 2009.
a. Type of Application: Non-project
use of project lands and waters.
b. Project Number: 1494–376.
c. Date Filed: June 1, 2009.
d. Applicant: Grand River Dam
Authority.
e. Name of Project: Pensacola Project.
f. Location: The proposed non-project
use is located in Lawhead Hollow on
Grand Lake, in Delaware County,
Oklahoma.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Ms. Tamara E.
Jahnke, Assistant General Council,
Grand Dam River Authority, P.O. Box
409, Vinita, Oklahoma 74301, (918)
265–5545.
i. FERC Contact: Any questions on
this notice should be addressed to Jade
Alvey at (202) 502–6864.
j. Deadline for filing comments and/
or motions: August 3, 2009.
All documents (original and eight
copies) should be filed with: Secretary,
Federal Energy Regulatory Commission,
888 First Street, NE., Washington, DC
20426.
The Commission’s Rules of Practice
and Procedure require all interveners
VerDate Nov<24>2008
15:49 Jul 08, 2009
Jkt 217001
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervener files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency. A copy of any
motion to intervene must also be served
upon each representative of the
Applicant specified in the particular
application.
k. Description of Request: Grand River
Dam Authority filed an application
seeking Commission authorization to
permit Fox Pointe Development, LLC to
install two homeowners’ docks and a
walkway on project lands along or near
the shoreline of Lawhead Hollow on
Grand Lake in Eucha, Delaware County,
Oklahoma. The application is for a total
of 19 boat slips and 21 PWCs. The filing
includes maps and descriptions of the
areas and of dock and slip
configurations, photographs,
environmental and historic
considerations. No dredging is
proposed.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street, NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field (P–1494) to
access the document. You may also
register online at https://www.ferc.gov/
docs-filing/esubscription.asp to be
notified via e-mail of new filings and
issuances related to this or other
pending projects. For assistance, call 1–
866–208–3372 or e-mail
FERCOnlineSupport@ferc.gov, for TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions To
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
PO 00000
Frm 00027
Fmt 4703
Sfmt 4703
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Any filings must bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’, as applicable, and the
Project Number of the particular
application to which the filing refers.
p. Agency Comments: Federal, state,
and local agencies are invited to file
comments on the described application.
A copy of the application may be
obtained by agencies directly from the
Applicant. If an agency does not file
comments within the time specified for
filing comments, it will be presumed to
have no comments. One copy of an
agency’s comments must also be sent to
the Applicant’s representatives.
q. Comments, protests and
interventions may be filed electronically
via the Internet in lieu of paper. See, 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov under the ‘‘eFiling’’ link.
Kimberly D. Bose,
Secretary.
[FR Doc. E9–16160 Filed 7–8–09; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP09–438–000]
CenterPoint Energy Gas Transmission
Company; Notice of Application
June 30, 2009.
Take notice that on June 23, 2009,
CenterPoint Energy Gas Transmission
Company (CEGT), 1111 Louisiana
Street, Houston, Texas 77002, filed in
Docket No. CP09–438–000, an
application pursuant to Section 7(b) of
the Natural Gas Act (NGA) and Part 157
of the Commission’s regulations,
requesting authorization to abandon by
sale Line BW–1507 in its entirety and a
4,940 foot segment of Line B–55–EXT,
located in Johnson County, Arkansas, all
as more fully set forth in the application
which is on file with the Commission
and open to public inspection. This
filing may also be viewed on the
Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number, excluding the
last three digits, in the docket number
field to access the document. For
E:\FR\FM\09JYN1.SGM
09JYN1
Agencies
[Federal Register Volume 74, Number 130 (Thursday, July 9, 2009)]
[Notices]
[Page 32902]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-16160]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 1494-376]
Grand River Dam Authority; Notice of Application for Amendment of
License and Soliciting Comments, Motions To Intervene, and Protests
July 1, 2009.
a. Type of Application: Non-project use of project lands and
waters.
b. Project Number: 1494-376.
c. Date Filed: June 1, 2009.
d. Applicant: Grand River Dam Authority.
e. Name of Project: Pensacola Project.
f. Location: The proposed non-project use is located in Lawhead
Hollow on Grand Lake, in Delaware County, Oklahoma.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Ms. Tamara E. Jahnke, Assistant General
Council, Grand Dam River Authority, P.O. Box 409, Vinita, Oklahoma
74301, (918) 265-5545.
i. FERC Contact: Any questions on this notice should be addressed
to Jade Alvey at (202) 502-6864.
j. Deadline for filing comments and/or motions: August 3, 2009.
All documents (original and eight copies) should be filed with:
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
The Commission's Rules of Practice and Procedure require all
interveners filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervener files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency. A copy
of any motion to intervene must also be served upon each representative
of the Applicant specified in the particular application.
k. Description of Request: Grand River Dam Authority filed an
application seeking Commission authorization to permit Fox Pointe
Development, LLC to install two homeowners' docks and a walkway on
project lands along or near the shoreline of Lawhead Hollow on Grand
Lake in Eucha, Delaware County, Oklahoma. The application is for a
total of 19 boat slips and 21 PWCs. The filing includes maps and
descriptions of the areas and of dock and slip configurations,
photographs, environmental and historic considerations. No dredging is
proposed.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street, NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field (P-1494) to access the document. You
may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
call 1-866-208-3372 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call
(202) 502-8659. A copy is also available for inspection and
reproduction at the address in item (h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions To Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Any filings must bear in all capital letters the title
``COMMENTS'', ``PROTEST'', or ``MOTION TO INTERVENE'', as applicable,
and the Project Number of the particular application to which the
filing refers.
p. Agency Comments: Federal, state, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
q. Comments, protests and interventions may be filed electronically
via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and
the instructions on the Commission's Web site at https://www.ferc.gov
under the ``e-Filing'' link.
Kimberly D. Bose,
Secretary.
[FR Doc. E9-16160 Filed 7-8-09; 8:45 am]
BILLING CODE 6717-01-P