Grand River Dam Authority; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests, 32902 [E9-16160]

Download as PDF 32902 Federal Register / Vol. 74, No. 130 / Thursday, July 9, 2009 / Notices Milestone Filing of recommendations, preliminary terms and conditions, and fishway prescriptions. Commission issues Draft EA. Comments on Draft EA. Filing Modified Terms and Conditions. Commission Issues Final EA. Target date November 26, 2009. July 9, 2010. August 8, 2010. October 7, 2010. January 5, 2011. o. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis. Kimberly D. Bose, Secretary. [FR Doc. E9–16158 Filed 7–8–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1494–376] Grand River Dam Authority; Notice of Application for Amendment of License and Soliciting Comments, Motions To Intervene, and Protests rmajette on DSK29S0YB1 with NOTICES July 1, 2009. a. Type of Application: Non-project use of project lands and waters. b. Project Number: 1494–376. c. Date Filed: June 1, 2009. d. Applicant: Grand River Dam Authority. e. Name of Project: Pensacola Project. f. Location: The proposed non-project use is located in Lawhead Hollow on Grand Lake, in Delaware County, Oklahoma. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a–825r. h. Applicant Contact: Ms. Tamara E. Jahnke, Assistant General Council, Grand Dam River Authority, P.O. Box 409, Vinita, Oklahoma 74301, (918) 265–5545. i. FERC Contact: Any questions on this notice should be addressed to Jade Alvey at (202) 502–6864. j. Deadline for filing comments and/ or motions: August 3, 2009. All documents (original and eight copies) should be filed with: Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. The Commission’s Rules of Practice and Procedure require all interveners VerDate Nov<24>2008 15:49 Jul 08, 2009 Jkt 217001 filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application. k. Description of Request: Grand River Dam Authority filed an application seeking Commission authorization to permit Fox Pointe Development, LLC to install two homeowners’ docks and a walkway on project lands along or near the shoreline of Lawhead Hollow on Grand Lake in Eucha, Delaware County, Oklahoma. The application is for a total of 19 boat slips and 21 PWCs. The filing includes maps and descriptions of the areas and of dock and slip configurations, photographs, environmental and historic considerations. No dredging is proposed. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field (P–1494) to access the document. You may also register online at https://www.ferc.gov/ docs-filing/esubscription.asp to be notified via e-mail of new filings and issuances related to this or other pending projects. For assistance, call 1– 866–208–3372 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions To Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Any filings must bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’, as applicable, and the Project Number of the particular application to which the filing refers. p. Agency Comments: Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency’s comments must also be sent to the Applicant’s representatives. q. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site at https://www.ferc.gov under the ‘‘eFiling’’ link. Kimberly D. Bose, Secretary. [FR Doc. E9–16160 Filed 7–8–09; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP09–438–000] CenterPoint Energy Gas Transmission Company; Notice of Application June 30, 2009. Take notice that on June 23, 2009, CenterPoint Energy Gas Transmission Company (CEGT), 1111 Louisiana Street, Houston, Texas 77002, filed in Docket No. CP09–438–000, an application pursuant to Section 7(b) of the Natural Gas Act (NGA) and Part 157 of the Commission’s regulations, requesting authorization to abandon by sale Line BW–1507 in its entirety and a 4,940 foot segment of Line B–55–EXT, located in Johnson County, Arkansas, all as more fully set forth in the application which is on file with the Commission and open to public inspection. This filing may also be viewed on the Commission’s Web site at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits, in the docket number field to access the document. For E:\FR\FM\09JYN1.SGM 09JYN1

Agencies

[Federal Register Volume 74, Number 130 (Thursday, July 9, 2009)]
[Notices]
[Page 32902]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: E9-16160]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 1494-376]


Grand River Dam Authority; Notice of Application for Amendment of 
License and Soliciting Comments, Motions To Intervene, and Protests

July 1, 2009.
    a. Type of Application: Non-project use of project lands and 
waters.
    b. Project Number: 1494-376.
    c. Date Filed: June 1, 2009.
    d. Applicant: Grand River Dam Authority.
    e. Name of Project: Pensacola Project.
    f. Location: The proposed non-project use is located in Lawhead 
Hollow on Grand Lake, in Delaware County, Oklahoma.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
    h. Applicant Contact: Ms. Tamara E. Jahnke, Assistant General 
Council, Grand Dam River Authority, P.O. Box 409, Vinita, Oklahoma 
74301, (918) 265-5545.
    i. FERC Contact: Any questions on this notice should be addressed 
to Jade Alvey at (202) 502-6864.
    j. Deadline for filing comments and/or motions: August 3, 2009.
    All documents (original and eight copies) should be filed with: 
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., 
Washington, DC 20426.
    The Commission's Rules of Practice and Procedure require all 
interveners filing documents with the Commission to serve a copy of 
that document on each person whose name appears on the official service 
list for the project. Further, if an intervener files comments or 
documents with the Commission relating to the merits of an issue that 
may affect the responsibilities of a particular resource agency, they 
must also serve a copy of the document on that resource agency. A copy 
of any motion to intervene must also be served upon each representative 
of the Applicant specified in the particular application.
    k. Description of Request: Grand River Dam Authority filed an 
application seeking Commission authorization to permit Fox Pointe 
Development, LLC to install two homeowners' docks and a walkway on 
project lands along or near the shoreline of Lawhead Hollow on Grand 
Lake in Eucha, Delaware County, Oklahoma. The application is for a 
total of 19 boat slips and 21 PWCs. The filing includes maps and 
descriptions of the areas and of dock and slip configurations, 
photographs, environmental and historic considerations. No dredging is 
proposed.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street, NE., Room 2A, Washington, 
DC 20426, or by calling (202) 502-8371. This filing may also be viewed 
on the Commission's Web site at https://www.ferc.gov using the 
``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field (P-1494) to access the document. You 
may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and 
issuances related to this or other pending projects. For assistance, 
call 1-866-208-3372 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call 
(202) 502-8659. A copy is also available for inspection and 
reproduction at the address in item (h) above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions To Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Any filings must bear in all capital letters the title 
``COMMENTS'', ``PROTEST'', or ``MOTION TO INTERVENE'', as applicable, 
and the Project Number of the particular application to which the 
filing refers.
    p. Agency Comments: Federal, state, and local agencies are invited 
to file comments on the described application. A copy of the 
application may be obtained by agencies directly from the Applicant. If 
an agency does not file comments within the time specified for filing 
comments, it will be presumed to have no comments. One copy of an 
agency's comments must also be sent to the Applicant's representatives.
    q. Comments, protests and interventions may be filed electronically 
via the Internet in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and 
the instructions on the Commission's Web site at https://www.ferc.gov 
under the ``e-Filing'' link.

Kimberly D. Bose,
Secretary.
[FR Doc. E9-16160 Filed 7-8-09; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.